10-2023-0022Administrative - FormalClosedFY 2023· Region 10

EPA v. SMITH (ESA)

Final Order With Penalty

Case summary

Region 10 Settles with Ryan Smith and Noah Smith for Clean Water Act (CWA) Violations. On April 4, 2023, Region 10 filed an expedited settlement agreement resolving violations of the 402 Section of the CWA by Ryan and Noah Smith at the property located within Section #, T. 9 N/., R. 14 E., Fairbanks Meridian; USGS Quad Map Central C-2 SW; Latitude 65.57033? N., Longitude 144.85272? W.; at Mile Post 126.2 of the Steese Highway, in Central, Alaska. Respondents constructed a building near an adjacent wetland without filing a Notice of Intent (NOI) for coverage under the Alaska General Permit for Discharge Activities from Large and Small Construction Activities. Failure to file the NOI resulted in unauthorized discharges. For purposes of penalty calculation, if there is precipitation of 0.5in or greater in a 24-hour period, a discharge is assumed for the month. From July 2019 through December 2022, there were 10 months that had of 0.5in of precipitation within a 24-hour period as determined by weather data collected from the National Oceanic and Atmospheric Administration?s (NOAA) Circle Hot Springs, Alaska observation station. The last instance was on September 4, 2022. The construction activity was discovered by a representative of the U.S. Army Corps of Engineers (USACOE) who was in the area conducting site inspections. The Environmental Benefit of this enforcement action is the reduction of pollutants entering waters of the U.S. The pollutants reduced, and the quantities, are; Biological Oxygen Demand (BOD) - 197 pounds, Chemical Oxygen Demand (COD) - 1,938 pounds, and Total Suspended Solids (TSS) - 7,977 pounds. Ryan and Noah Smith agree to pay a penalty of $1,200 for unauthorized construction stormwater discharges over a 10-month period.

Defendants (2)

  • Noah SmithNamed in complaintNamed in settlement
  • Ryan SmithNamed in complaintNamed in settlement

Facilities (1)

  • RYAN SMITH - ALASKA CONSTRUCTION COMPANY

    126.2 STEESE HIGHWAY,, CENTRAL, AK, 99730

    Registry ID: 110071308235

Statutes cited

  • CWA 301NPDES Discharge without a Permit

Enforcement conclusions (1)

  • SMITH (ESA)entered 2023-04-07

    Primary law: CWA

    Federal penalty: $1,200

Timeline (5 milestones)

  • 2023-02-08Enforcement Action Data Entered
  • 2023-04-07Complaint Filed/Proposed Order
  • 2023-04-07Final Order Issued
  • 2023-05-05Enforcement Action Closed
  • 2023-05-05NPDES Closed

Case metadata

EPA activity ID
3603500273
Case number
10-2023-0022
Lead agency
EPA
EPA region
10
Voluntary self-disclosure
No
Primary statute
NPDES Discharge without a Permit

Sourced verbatim from EPA ECHO Enforcement Case Report for case 10-2023-0022 . Bulk data: ICIS-FEC download summary.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.