EPA v. Stephen Hart
Final Order With Penalty
Case summary
On September 12, 2018, Region 10 filed a Consent Agreement and Final Order that resolves violations of the TSCA Renovation, Repair, and Painting (RRP) Rule by Steve Hart Construction (Respondent), located in Boise, Idaho. EPA alleged that Respondent failed to follow the lead-safe work practices while performing renovation work on a pre-1978 residential property as required by the RRP Rule. Respondent specifically failed to post warning signs; failed to close windows and doors (includes door used as an entrance) in work area with plastic sheeting or other impermeable material; failed to cover the interior floor surface with taped-down plastic sheeting before beginning the renovation; and failed to contain waste from renovation activities to prevent releases of dust and debris. Respondent agreed to pay a penalty of $4,000.
Defendants (1)
- Stephen HartNamed in complaintNamed in settlement
Facilities (1)
STEVEHART CONSTRUCTION
2718 S ROOSEVELT ST, BOISE, ID, 83705
Registry ID: 110070028892
Statutes cited
- TSCA 402C — Lead: RRP
Enforcement conclusions (1)
Stephen Hartentered 2018-09-12
Primary law: TSCA
Federal penalty: $4,000
Timeline (4 milestones)
- 2018-09-12Complaint Filed/Proposed Order
- 2018-09-12Final Order Issued
- 2018-09-14Enforcement Action Data Entered
- 2022-05-11Enforcement Action Closed
Case metadata
- EPA activity ID
- 3601554902
- Case number
- 10-2018-0371
- Lead agency
- EPA
- EPA region
- 10
- Voluntary self-disclosure
- No
- Primary statute
- Lead: RRP
Sourced verbatim from EPA ECHO Enforcement Case Report for case 10-2018-0371 . Bulk data: ICIS-FEC download summary.