EPA v. GUAM POWER AUTHORITY
Final Order With Penalty
Penalty assessed
$150,000
Case summary
GUAM POWER AUTHORITY BEGAN CONSTRUCTION OF A COMBUSTION TURBINE (CT-1) AT ITS GENERATING FACILITY IN DEDEDO, GUAM, WITHOUT OBTAINING FROM EPA A PREVENTION OF SIGNIFICANT DETERIORATION (PSD) PERMIT. A PERMIT IS REQUIRED BECAUSE CT-1 IS MAJOR MODIFICATION TO A MAJOR SOURCE OF AIR POLLUTANTS. ALSO, GPA VIOLATED THE NEW SOURCE PERFORMANCE STANDARDS (NSPS) FOR GAS TURBINES BY FAILING TO NOTIFY EPA PRIOR TO CONDUCTIING PERFORMANCE TESTS ON CT-1, AND FAILING TO REPORT THE RESULTS OF THE PERFORMANCE TESTS WITHIN THE REGULATORY TIME LIMIT.
Defendants (1)
- GUAM POWER AUTHORITYNamed in complaintNamed in settlement
Facilities (1)
GPA DEDEDO DIESEL POWER PLANT
MARINE DRIVE, DEDEDO, GU, 96912
Registry ID: 110018854658
Statutes cited
- CAA 111 — New Source Performance Standards
- CAA 110 — Implementation Plan for National Primary and Secondary Ambient Air Quality Standards
Enforcement conclusions (1)
GUAM POWER AUTHORITYentered 1994-04-11
Primary law: CAA
Federal penalty: $150,000
Timeline (7 milestones)
- 1992-02-20Enforcement Action Data Entered
- 1992-08-13PRN Sent
- 1993-08-09Referred To Dept Of Justice
- 1994-01-24Complaint Filed With Court
- 1994-04-11Final Order Lodged
- 1994-04-11Final Order Entered
- 1994-04-11Concluded
Case metadata
- EPA activity ID
- 52373
- Case number
- 09-1992-0099
- DOJ docket
- 90-5-2-1-1491
- Lead agency
- EPA
- HQ division
- AIR
- Branch
- RC-2
- EPA region
- 09
- Multimedia
- No
- Voluntary self-disclosure
- No
- Primary statute
- New Source Performance Standards
Sourced verbatim from EPA ECHO Enforcement Case Report for case 09-1992-0099 . Bulk data: ICIS-FEC download summary.