EPA v. GUAM POWER AUTHORITY
Voluntarily Dismissed After Filing
Case summary
GUAM POWER AUTHORITY (GPA), AN AGENCY OF THE GOVERNMENT OF GUAM, CREATED IN 1968, OWNSS AND OPERATES THE CABRAS STEAM PLANT, A POWER GENERATING FACILITY WHICH CONSISTS OF TWO 66-MEGAWATT FUEL OIL-FIRED UNITS. THEY SUPPLY ELECTRI- CAL POWER TO THE ISLAND OF GUAM. THIS IS A CASE WITH A 12 YEAR HISTORY . IN 1972 EPA NOTIFIED GPA THAT THE NEW CABRAS PLANT WOULD HAVE TO COMPLY WITH THE SULFUR DIOXIDE NSPS FOR FOSSIL-FUEL-FIRED STEAM GENERATORS (40CFR PART 60, SUBPART D). SINCE THEN THE FOL- LOWING ACTIONS HAVE BEEN TAKEN: - EPA DENIED A GPA REQUEST FOR A 'VARIANCE' - EPA ISUED A NOTICE OF VIOLATION (NOV) AND ORDER - GPA FILED AN ACTION SEEKING AN INJUNCTION AGAINST ENFORCEMENT OF THE ORDER - EPA FILED AN ENFORCEMENT ACTION - A CONSENT ORDER WAS ISSUED - THE ORDER WAS AMENDED THREE TIMES - A DELAYED COMPLIANCE ORDER (DCO) WAS ISSUED GPA IS NOW IN VIOLATION OF THE EXISTING CONSENT ORDER AND DCO AND IS LISTED IN CDS AS A SIGNIFICANT VIOLATOR WITHIN THE MEANING OF SPMS. SPECIFICALLY, GPA IS IN VIOLATION OF PAR 6(A) & 6(B) OF THE CONSENT ORDER IN THE FOLLOWING WAYS: - GPA FAILED TO ADVISE EPA BY 8/15/82 WHETHER IT HAD ENTERED INTO A FIRM UNDERTAKING FOR THE INSTALLATION OF A SEAWATER SCRUBBER. IN FACT, GPA HAS NOT ENTERED INTO SUCH AN UNDERTAKING. - GPA FAILED TO COMMENCE THE INSTALLATION BY 11/15/82. CONSEQUENTLY, REGION 9 RECOMMENDED THAT AN ACTION FOR CIVIL CONTEMPT BE FILED AGAINST GPA IN US DISTRICT COURT IN GUAM. HOWEVER, BECAUSE OF THREE EQUITABLE FACTORS IN GUAM'S DEFENSE---NAMELY 1. THAT THERE IS LITTLE ENVIRONMENTAL HARM SINCE DURING THE 5% OF THE TIME THE WIND BLOWS ON-SHORE, THE PLANT BURNS LOW-SULFUR FUEL, 2. THAT GPA IS IMPOVERISHED, AND 3. THAT THE CABRAS PLANT IS NEEDED TO PROVIDE ELECTRICAL POWER TO THE ISLAND OF GUAM. REGION 9 HAS NOT PROPOSED ANY SHUTDOWN OR ANY PARTICULAR REMEDY FOR THE CONSENT ORDER AND ITS VIOLATIONS. INSTEAD, REGION 9 BELIEVES THAT THE GOVERN- MENT OF GUAM SHOULD BRING THE VIOLATIONS TO THE ATTENTION OF THE JUDGE VIA AN APPLICATION FOR AN ORDER TO SHOW CAUSE, THEN LEAVING IT TO THE JUDGE TO FASHION A REMEDY.
Defendants (1)
- GUAM POWER AUTHORITYNamed in complaint
Facilities (1)
GUAM POWER AUTHORITY - CABRAS POWER PLANT
CABRAS HIGHWAY - POWER PLANT ACCESS ROAD, PITI, GU, 96925
Registry ID: 110007501499
Statutes cited
- CAA 110 — Implementation Plan for National Primary and Secondary Ambient Air Quality Standards
- CAA 111 — New Source Performance Standards
Timeline (6 milestones)
- 1983-04-14Referred To Headquarters
- 1983-07-01Referred To Dept Of Justice
- 1983-08-28Referred TO U.S. Attorney
- 1983-09-01Complaint Filed With Court
- 1986-03-31Concluded
- 1986-03-31Enforcement Action Closed
Case metadata
- EPA activity ID
- 52037
- Case number
- 09-1983-0001
- Lead agency
- EPA
- HQ division
- AIR
- EPA region
- 09
- Multimedia
- No
- Voluntary self-disclosure
- No
- Primary statute
- Implementation Plan for National Primary and Secondary Ambient Air Quality Standards
Sourced verbatim from EPA ECHO Enforcement Case Report for case 09-1983-0001 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.