08-2018-0090Administrative - FormalClosedFY 2018· Region 08

EPA v. Eagle Stop

Final Order With Penalty

Case summary

Eagle Stop is a privately owned gas station with a convenience store located on the Cheyenne River Reservation in Eagle Butte, South Dakota. The facility has two STI-P3 USTs installed in 1989. Tank 1 is 10,000 gallons and stores E-10. Tank 2 is 12,000 gallons and stores unleaded. The piping is FRP and is a pressurized system. Passing tank leak detection records were available for all tanks for the previous 12 months. Passing CP tests were available within the last 3 years for the tanks. At the time of inspection, the facility did not have a current passing ALTT, a passing copy of the test was received on August 14, 2017. On August 14, 2017, the EPA received a fax containing the results of the current annual line tightness test and line leak detector test, that were conducted on that date.

Defendants (1)

  • Eagle StopNamed in complaintNamed in settlement

Facilities (1)

  • EAGLE STOP

    HIGHWAY 212 & MAIN STREET, EAGLE BUTTE, SD, 57625

    Registry ID: 110010641332

Statutes cited

  • RCRA 9006AUnderground Storage Tanks Compliance Order

Enforcement conclusions (1)

  • Eagle Stopentered 2018-07-05

    Primary law: RCRA

    Federal penalty: $250

Timeline (4 milestones)

  • 2018-07-05Complaint Filed/Proposed Order
  • 2018-07-05Final Order Issued
  • 2018-10-17Enforcement Action Data Entered
  • 2020-07-02Enforcement Action Closed

Case metadata

EPA activity ID
3601612151
Case number
08-2018-0090
Lead agency
EPA
EPA region
08
Voluntary self-disclosure
No
Primary statute
Underground Storage Tanks Compliance Order

Sourced verbatim from EPA ECHO Enforcement Case Report for case 08-2018-0090 . Bulk data: ICIS-FEC download summary.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.