08-2017-0022Administrative - FormalClosedFY 2017· Region 08

EPA v. Westland Construction

Final Order With Penalty

Case summary

On September 1, 2016, EPA conducted a stormwater construction inspection of the Provo High School construction site operated by Westland Construction. Findings included failure to prepare a Stormwater Pollution Prevention Plan, failure to ensure personnel conducting inspections were properly trained and certified, failure to properly manage concrete washout, failure to install appropriate stormwater and sediment controls, failure to display proper SWPPP project signage, and failure to document corrective actions. Westland Construction implemented corrective actions to address the findings and agreed to pay a penalty.

Defendants (1)

  • Westland ConstructionNamed in complaintNamed in settlement

Facilities (1)

  • PROVO HIGH SCHOOL

    1199 NORTH LAKESHORE DRIVE, PROVO, UT, 84601

    Registry ID: 110012355174

Statutes cited

  • CWA 301/402NPDES Permit Violations

Enforcement conclusions (1)

  • Westland Constructionentered 2016-12-23

    Primary law: CWA

    Federal penalty: $7,200

Timeline (5 milestones)

  • 2016-12-23Complaint Filed/Proposed Order
  • 2016-12-23Final Order Issued
  • 2017-02-17Enforcement Action Data Entered
  • 2020-08-28NPDES Closed
  • 2020-08-28Enforcement Action Closed

Case metadata

EPA activity ID
3600963346
Case number
08-2017-0022
Lead agency
EPA
EPA region
08
Voluntary self-disclosure
No
Primary statute
NPDES Permit Violations

Sourced verbatim from EPA ECHO Enforcement Case Report for case 08-2017-0022 . Bulk data: ICIS-FEC download summary.