EPA v. GLENCOE CAMP RESORT II LLC
Final Order No Penalty
Case summary
In July of 2012 the respondent constructed an earthen dam across Bear Butte Creek for the purpose of creating a swimming feature at the campground during the Sturgus SD Cycle Rally. The dam was 75 feet long, 20 feet wide and 6 feet high. Approximately 500 cubic yards of fill material was used to construct the dam. The dam created a swimming pool extending approximately 500 feet upstraem, resulting in stream flow reductions downstream. In addition the respondent constructed two cross channel leves, excavated the same channel, constructed recreational beaches. The project impacted 640 linear feet of natural channel and 1,280 linera feet of riverine shoreline.
Defendants (2)
- DEVORAH LOPEZNamed in complaintNamed in settlement
- SEAN CLARKNamed in complaintNamed in settlement
Facilities (1)
GLENCOE CAMP RESORT
20555 GLENCOE DRIVE, STURGIS, SD, 57785
Registry ID: 110030487024
Statutes cited
- CWA 301 — NPDES Discharge without a Permit
- CWA 404 — Permits for Dredge and Fill Material
Enforcement conclusions (1)
GLENCOE CAMP RESORT II LLCentered 2014-12-22
Primary law: CWA
Timeline (3 milestones)
- 2014-12-22Final Order Issued
- 2015-01-09Enforcement Action Data Entered
- 2022-07-07Enforcement Action Closed
Case metadata
- EPA activity ID
- 3600049905
- Case number
- 08-2015-0023
- Lead agency
- EPA
- EPA region
- 08
- Voluntary self-disclosure
- No
- Primary statute
- NPDES Discharge without a Permit
Sourced verbatim from EPA ECHO Enforcement Case Report for case 08-2015-0023 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.