EPA v. BISON ENGINEERING, INC.
Withdrawn by Region/State
Case summary
ON OR ABOUT 9/21/92, AN AUTHORIZED EPA INSPECTOR CONDUCTED AN INSPECTION TO DETERMINE COMPLIANCE WITH AHERA AND ITS IMPLEMENTING REGULATIONS. INSPECTOR OBSERVED THAT RESPONDENT FAILED TO PROPERLY INSPECT EACH SCHOOL BUILDING WHICH LEA OWNS.RESPONDENT WAS INDICTED ON 6 COUNTS COUNTS 1 & 2 RESPONDENT FAILED TO PROPERLY IDENTIFY AND INSPECT THE FOLLOWING HOMOGENOUS AREAS: HIGH SCHOOL & ELEMENTARY SCHOOL BUILDINGS. COUNTS 3 & 4 RESPONDENT FAILED TO COLLECT AND SUBMIT FOR ANALYSIS, BULK SAMPLESOF MATERIAL. COUNTS 5 & 6 RESPONDENT FAILED TO PROPERLY DEVELOP, ESTABLISH, INCLUDE AND MAINTAIN ALL REQUIRED INFORMATION IN THE 2 MANAGEMENT PLANS. UNADJUSTED TOTAL PROPOSED PENALTY $78,000. ADJUSTED TOTAL PROPOSED PENALTY $50,000.
Defendants (1)
- BISON ENGINEERING, INCNamed in complaint
Facilities (1)
WAUCONDA SAND & GRAVEL
BONNER & GARLAND RD, WAUCONDA, IL, 60084
Registry ID: 110009327022
Statutes cited
- TSCA 16 — Toxic Sub Control Act
Enforcement conclusions (1)
**PROPOSED SETTLEMENT**
Primary law: TSCA
Timeline (3 milestones)
- 1993-09-30Enforcement Action Data Entered
- 1993-09-30Complaint Filed/Proposed Order
- 1994-06-08Enforcement Action Closed
Case metadata
- EPA activity ID
- 49734
- Case number
- 08-1993-0300
- Lead agency
- EPA
- HQ division
- TOX
- EPA region
- 08
- Multimedia
- No
- Voluntary self-disclosure
- No
- Primary statute
- Toxic Sub Control Act
Sourced verbatim from EPA ECHO Enforcement Case Report for case 08-1993-0300 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.