EPA v. Archer-Daniels-Midland Company CAA 113D1 Action For Penalty 112(r) RMP Expedited Settlement Progra
Final Order With Penalty
Case summary
Archer-Daniels-Midland Company (?Respondent?) is the owner or operator of the facility at 1350 Waconia Avenue, SW, Cedar Rapids, Iowa 52404 (?Facility?). The EPA inspected the facility on September 19-21, 2023. The EPA alleges that Respondent violated the following requirements of Section 112(r) of the Clean Air Act, which includes the law and implementing regulations 40 CFR 68, Chemical Accident Prevention Provisions. 1. 40 CFR 68.67(f) requires that a facility review and update PHAs at least every five years. At the time of the inspection, the PHA for denaturant, natural gas pentane, was overdue by 1 year and 7 months; the PHA for anhydrous ammonia was overdue by 3 months. 2. 40 CFR 68.73(d)(3) requires that facilities ensure the frequency of inspections and tests of process equipment is consistent with applicable manufacturer?s recommendations, good engineering practices (specifically, ANSI/ CGA G-2.1-2014 Standard Sections 5.6.8 and 5.8.16), and prior operating experience. During the inspection, facility personnel stated that they were unsure if piping had been inspected other than the day it was installed and first used to convey anhydrous ammonia. During review of records, the inspector noted that the facility did not include any information regarding testing of the underground anhydrous line from the bulk storage tank area to the point where it is injected into a stream of water to make an aqueous ammonia solution. 1.3. 40 CFR 68.93(a) requires that a facility conduct emergency response coordination activities at least annually. According to the inspection report, facility personnel stated that Emergency Response coordination activities were not conducted in 2020 and 2021 and Emergency Response coordination activities conducted in 2019 were not documented. During years 2020 and 2021, facility personnel stated that due to COVID-19, no coordination activities took place between the facility and local responders.
Defendants (1)
- Archer-Daniels-Midland CompanyNamed in complaintNamed in settlement
Facilities (2)
ARCHER DANIELS MIDLAND COMPANY - CEDAR RAPIDS
1350 WACONIA AVE SW, CEDAR RAPIDS, IA, 52404
Registry ID: 110010507503
ARCHER DANIELS MIDLAND COMPANY - CEDAR RAPIDS
1350 WACONIA AVE SW, CEDAR RAPIDS, IA, 52404
Registry ID: 110010507503
Statutes cited
- CAA 112[R][7] — Prevention of Accidental Release/Risk Management Plans (RMPs)
Enforcement conclusions (1)
Archer-Daniels-Midland Company CAA 113D1 Action For Penalty 112(r) RMP Expedited Settlement Prograentered 2024-09-09
Primary law: CAA
Federal penalty: $5,900
Timeline (4 milestones)
- 2024-09-09Final Order Issued
- 2024-09-09Enforcement Action Closed
- 2024-09-09Complaint Filed/Proposed Order
- 2024-09-11Enforcement Action Data Entered
Case metadata
- EPA activity ID
- 3604095747
- Case number
- 07-2024-0071
- Lead agency
- EPA
- EPA region
- 07
- Voluntary self-disclosure
- No
- Primary statute
- Prevention of Accidental Release/Risk Management Plans (RMPs)