EPA v. Rickaway Energy, Corp. (Hierholzer, C.H. Lease (RRC No. 02115)
Unilateral Administrative Order Without Adjudication
Case summary
Pollutants were discharged to the tributary of Cow Creek which is a water of the United States. The inspector determined that the water located at the discharge point of entry (POE) into the tributary of Borrego Creek was contaminated with brine discharges..
Defendants (1)
- Rickaway Energy, Corp. (Hierholzer, C.H. Lease)Named in complaintNamed in settlement
Facilities (1)
RICKAWAY ENERGY, CORP. (HIERHOLZER, C.H. LEASE (RRC NO. 02115)
205 LOS ROBLES DRIVE, PLEASANTON, TX, 78064
Registry ID: 110054923320
Statutes cited
- CWA 301 — NPDES Discharge without a Permit
Enforcement conclusions (1)
Rickaway Energy, Corp. (Hierholzer, C.H. Lease (RRC No. 02115)entered 2017-03-06
Primary law: CWA
Timeline (4 milestones)
- 2017-03-06Enforcement Action Data Entered
- 2017-03-06Final Order Issued
- 2017-04-17NPDES Closed
- 2017-04-17Enforcement Action Closed
Case metadata
- EPA activity ID
- 3600974991
- Case number
- 06-2017-1732
- Lead agency
- EPA
- Branch
- 6EN-W
- EPA region
- 06
- Voluntary self-disclosure
- No
- Primary statute
- NPDES Discharge without a Permit
Sourced verbatim from EPA ECHO Enforcement Case Report for case 06-2017-1732 . Bulk data: ICIS-FEC download summary.