EPA v. Dr. Davd Haas
Unilateral Administrative Order Without Adjudication
Case summary
Violations: 1.Failure to post the Storm Water Construction General Permit certification, a copy of the Notice of Intent confirmation letter, and a brief description of the project including the permit number. 2. Failure to develop an adequate Storm Water Pollution Prevention Plan. 3. Failure to install adequate control measures and stabilization practices at the construction site. 4. Failure to perform required inspections of the construction site.
Defendants (1)
- Dr. David HaasNamed in settlement
Facilities (1)
VILLAGE EAST LLC
KELLOGG ROAD @ MINE ROAD, SHERWOOD, AR, 72120
Registry ID: 110031268116
Statutes cited
- CWA 301/402 — NPDES Permit Violations
Enforcement conclusions (1)
Dr. Davd Haasentered 2008-05-22
Primary law: CWA
Timeline (3 milestones)
- 2008-04-09Enforcement Action Data Entered
- 2008-05-22Final Order Issued
- 2009-07-01Enforcement Action Closed
Case metadata
- EPA activity ID
- 600091314
- Case number
- 06-2008-1870
- Lead agency
- EPA
- Branch
- 6EN-W
- EPA region
- 06
- Voluntary self-disclosure
- No
- Primary statute
- NPDES Permit Violations
Sourced verbatim from EPA ECHO Enforcement Case Report for case 06-2008-1870 . Bulk data: ICIS-FEC download summary.