Skip to main content
06-2004-1785Administrative - FormalClosedFY 2004· Region 06

EPA v. Frank Dale Construction, Ltd. (TXU010331

Unilateral Administrative Order Without Adjudication

Case summary

A storm water compliance inspection was conducted October 15, 2003, at the construction site of the Arlington Presbyterian Church sanctuary in Arlington, TX. During the inspection it was noted that the Storm Water Pollution Prevention Plan (SWPPP) was inadequate, inspections were not conducted in accordance with permit requirements, and the required signs were not properly posted. Review of the violations indicated the permittee was eligible for the Expedited Settlement Offer (ESO), which was routed for signature.

Defendants (1)

  • Frank Dale Construcion, Ltd. (TXU010331) (SB)Named in complaintNamed in settlement

Facilities (1)

  • ARLINGTON PRESBYTERIAN CHURCH SANCTUARY

    1308 WEST PIONEER PARKWAY, ARLINGTON, TX, 76013

    Registry ID: 110016663467

Statutes cited

  • CWA 301/402NPDES Permit Violations

Enforcement conclusions (1)

  • Frank Dale Construction, Ltd. (TXU010331)entered 2003-11-10

    Primary law: CWA

Timeline (3 milestones)

  • 2003-10-30Enforcement Action Data Entered
  • 2003-11-10Final Order Issued
  • 2004-08-30Enforcement Action Closed

Case metadata

EPA activity ID
107678
Case number
06-2004-1785
Lead agency
EPA
Branch
6EN-W
EPA region
06
Voluntary self-disclosure
No
Primary statute
NPDES Permit Violations

Sourced verbatim from EPA ECHO Enforcement Case Report for case 06-2004-1785 . Bulk data: ICIS-FEC download summary.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.