EPA v. GM Construction/Levy Concrete
Final Order With Penalty
Case summary
1. Plan not certified by a professional engineer 2. No Training on the applicable laws, rules, and regulations. 3. Spill prevention briefings are not scheduled and conducted periodically. 4. Adequatae records of drainage events are not maintained. 5. Periodic pressure testing of the valves and pipelines is not conducted. 6. Facility not fully fenced and entrance gates are not locked and/or guarded when plant is unattended or not in production.
Defendants (1)
- Levy ConcreteNamed in complaintNamed in settlement
Facilities (1)
GM CONSTRUCTION/LEVY CONCRETE
3516 CRYSTAL STREET, N. LITTLE ROCK, AR, 72118
Registry ID: 110014413982
Statutes cited
- CWA 311J — SPCC and/or Federal Response Plan Violations
Enforcement conclusions (1)
GM Construction/Levy Concreteentered 2003-06-09
Primary law: CWA
Federal penalty: $650
Timeline (4 milestones)
- 2003-03-27Complaint Filed/Proposed Order
- 2003-04-04Enforcement Action Data Entered
- 2003-06-09Enforcement Action Closed
- 2003-06-09Final Order Issued
Case metadata
- EPA activity ID
- 93815
- Case number
- 06-2003-4323
- Lead agency
- EPA
- Branch
- 6SF-R
- EPA region
- 06
- Voluntary self-disclosure
- No
- Primary statute
- SPCC and/or Federal Response Plan Violations
Sourced verbatim from EPA ECHO Enforcement Case Report for case 06-2003-4323 . Bulk data: ICIS-FEC download summary.