EPA v. G&C PETROLEUM, INC.
Unilateral Administrative Order Without Adjudication
Case summary
Violations: The respondent's tank battery facility was a point source discharge of pollutants specifically brine, to the receiving waters of a tributary of the Cimarron River, locted in the Northeast Quarter of Section 4, Township 18, North, Range 5 East, Payne County, Ok. The discharge of brine was documented during a May 21, 2003, inspection. RELIEF: The Order requires the Respondent to immediately cease all discharges from the facility to the tributary and to remediate soil contaminatin to prevent additional storm water associated discharges to the tributary. Additionally, the Order asks the Respondent to consider: (1) constructing adequate secondary containment; (2) installing a pump to remove standing fluid from the tank battery containment; and (3) repair leaking connections, tanks, etc contributing to surface brine leaks. A follow-up inspection will determine the extend of compliance with the Order.
Defendants (1)
- G&C PETROLEUM, INC.Named in complaintNamed in settlement
Facilities (1)
NE-04-18-05
NE/4, SEC. 04, T 18N, R 05E, YALE, OK, 74085
Registry ID: 110015775525
Statutes cited
- CWA 301 — NPDES Discharge without a Permit
Enforcement conclusions (1)
G&C PETROLEM, INC.entered 2003-06-12
Primary law: CWA
Timeline (3 milestones)
- 2003-06-12Final Order Issued
- 2003-06-16Enforcement Action Data Entered
- 2003-09-10Enforcement Action Closed
Case metadata
- EPA activity ID
- 97432
- Case number
- 06-2003-1993
- Lead agency
- EPA
- Branch
- 6en-w
- EPA region
- 06
- Voluntary self-disclosure
- No
- Primary statute
- NPDES Discharge without a Permit
Sourced verbatim from EPA ECHO Enforcement Case Report for case 06-2003-1993 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.