EPA v. C & E Concrete, Inc. (NMR05B190)

Unilateral Administrative Order Without Adjudication

Case summary

A compliance inspection was conducted at the Tinaja Pit owned by C&E Concrete on December 12, 2002, by NMED, for compliance with the Storm Water Multi-Sector General Permit. It was determined that the facility had been without permit coverage from March 1993 through November 19, 2002. The Storm Water Pollution Prevention Plan (SWPPP) indicated violations including a deficient site map, non-implementation of BMPs documented, and inspections not being conducted in accordance with permit requirements. An administrative order was drafted to address these violations.

Defendants (1)

  • C & E Concrete, Inc. (NMR05B190)Named in complaintNamed in settlement

Facilities (1)

  • C & E CONCRETE, INC. (NMR05B190)

    TINAJA PIT, NM53 MILEPOST 51.5, RAMAH, NM, 87021

    Registry ID: 110014422124

Statutes cited

  • CWA 301/402NPDES Permit Violations

Enforcement conclusions (1)

  • C & E Concrete, Inc. (NMR05B190)entered 2003-03-24

    Primary law: CWA

Timeline (3 milestones)

  • 2003-03-17Enforcement Action Data Entered
  • 2003-03-24Final Order Issued
  • 2009-07-01Enforcement Action Closed

Case metadata

EPA activity ID
92512
Case number
06-2003-1904
Lead agency
EPA
Branch
6EN-W
EPA region
06
Voluntary self-disclosure
No
Primary statute
NPDES Permit Violations