EPA v. EES COKE BATTERY - ACO
Case summary
EES and EPA entered into an Administrative Consent Order (ACO) for EES Coke L.L.C. for the River Rouge, Michigan facility to address violations for failing to comply with the National Emission Standards for Hazardous Air Pollutants (NESHAPs) for Benzene Waste Operations and Equipment Leaks. Specifically, EES failed to comply with the following: (1) conducting required weekly visual inspections; (2) performing Method 21 sampling properly on valves and pumps; and (3) repeating the determination of total annual benzene quantity after a change in process. This ACO requires EES to conduct a third-party audit of its Leak Detection and Repair (LDAR) compliance, perform quarterly quality assurance measures to ensure LDAR continued compliance, and develop a facility-wide LDAR document. This CAFO resolves violations alleged in a Finding of Violation issued on September 29, 2015. Additionally, EES has agreed to pay a civil penalty of $154,000 in a Consent Agreement and Final Order.
Defendants (1)
- EES COKE BATTERYNamed in complaintNamed in settlement
Facilities (1)
EES COKE BATTERY, LLC
1400 ZUG ISLAND ROAD, DETROIT, MI, 48209
Registry ID: 110070374301
Statutes cited
- CAA 112 — Hazardous Air Pollutants
Enforcement conclusions (1)
EES COKE BATTERY - ACOentered 2017-01-25
Primary law: CAA
Timeline (2 milestones)
- 2017-01-25Final Order Issued
- 2017-02-03Enforcement Action Data Entered
Case metadata
- EPA activity ID
- 3600949280
- Case number
- 05-2017-5014
- Lead agency
- EPA
- EPA region
- 05
- Voluntary self-disclosure
- No
- Primary statute
- Hazardous Air Pollutants
Sourced verbatim from EPA ECHO Enforcement Case Report for case 05-2017-5014 . Bulk data: ICIS-FEC download summary.