Skip to main content
05-2005-5011Administrative - FormalFinal Order IssuedFY 2005· Region 05

EPA v. CARMEUSE LIME, INC.

Final Order No Penalty

Case summary

On April 3, 2003, U.S. EPA issued to Carmeuse a finding of violation and notice of violation (FOV/NOV) alleging that Carmeuse violated the NSPS for Lime Manufacturing Plants by having poor operation and maintenance leading to the emission of fugitive dust and particulate matter from kiln #5 and associated ductwork. The FOV/NOV also alleged that Carmeuse violated the Approval to Construct EPA 5-79-A-3 and Illinois PCB Rule 102 by exceeding its 10% opacity limit for 22.4% of their monitored opacity readings from July 1 to September 30, 2002, and causing, threatening or allowing the discharge or emission of contaminants into the air which tend to cause air pollution, respectively. Per the Administrative Consent Order, Carmeuse will develop and implement a comprehensive Operating Program for Fugitive Particulate Control (OPFPMC), in accordance with its Title V Permit, 35 IAC 212.309(a), and the City of Chicago Department of Environment�s Dust Management Plan Requirements, which details all control measures which the plant uses to control fugitive dust. Control methods include: lime truck tire washing, use of truck rumble strips, vacuuming of the interior of dust generating buildings, implementation of automatically closing spring doors at entryways at the Grinding Mill, clean building and silo roofs, cover material transport converyors, and conduct routine inspections for holes and cracks at facility buildings.

Defendants (1)

  • CARMEUSE LIME, INC.Named in complaintNamed in settlement

Facilities (2)

  • CHICAGO RAIL & PORT LLC

    3245 E 103RD ST, CHICAGO, IL, 60617-5851

    Registry ID: 110001808624

  • CHICAGO RAIL & PORT LLC

    3245 E 103RD ST, CHICAGO, IL, 60617-5851

    Registry ID: 110001808624

Statutes cited

  • CAA 111New Source Performance Standards
  • CAA 112DMACT Standards
  • CAA 502Operating Permits (Title V)
  • CAA 110Implementation Plan for National Primary and Secondary Ambient Air Quality Standards

Enforcement conclusions (1)

  • CARMEUSE LIME, INC.entered 2005-09-28

    Primary law: CAA

Timeline (2 milestones)

  • 2005-09-28Final Order Issued
  • 2005-09-29Enforcement Action Data Entered

Case metadata

EPA activity ID
158784
Case number
05-2005-5011
Lead agency
EPA
EPA region
05
Voluntary self-disclosure
No
Primary statute
New Source Performance Standards

Sourced verbatim from EPA ECHO Enforcement Case Report for case 05-2005-5011 . Bulk data: ICIS-FEC download summary.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.