EPA v. SPECTRO ALLOYS CORPORATION
Final Order With Penalty
Case summary
Spectro Alloys Corporation���s (Spectro���s) secondary aluminum production facility is an emission source subject to the requirements of the Act, including 40 C.F.R. Part 63 Subpart RRR (RRR) and is located at 13220 Doyle Path, Rosemount, MN. Spectro���s facility processes aluminum scrap to manufacture aluminum alloy ingots. Spectro conducted initial performance tests on its group 1 furnaces for hydrochloric acid (HCl) in February 2003. The results of those tests show that the combined furnace emissions were in violation of emission standards of RRR. Spectro informed Region 5 that they increased the lime injection rate to the baghouse and decreased the chlorine injection rate into the furnaces. The exhaust from the furnaces was re-tested in March 2004 and demonstrated compliance with the HCl emission standard. On December 9, 2003, Region 5 received a semi-annual report from Spectro. The report was submitted past the due date specified in RRR. The report included violations of monitoring and record keeping requirements established in RRR. The afterburner and baghouse temperatures on Scrap Dryer 3 were not recorded . The chlorine injection rate, afterburner temperature and baghouse temperature were not recorded on Furnaces 1 and 3. The semi-annual report included significant deviations from the required temperatures of the Furnace 1 and 3 baghouse and the Scrap Dryer afterburner and baghouse. In February 2004, Spectro conducted an initial performance test on a new scrap dryer that was installed in October 2003. The intent to test letter was submitted to Region 5 less than 60 days prior to testing. The results of that test showed that the dioxin/furan (D/F) emissions from the dryer were being discharged at a rate above the standard for RRR. In July 2004, Spectro re-tested the new scrap dryer which the results were in compliance with emission standards. Spectro informed Region 5 that they installed and replaced components of the scrap dryer to come into compliance. The case has been settled for $49,058 civil penalty and supplemental environmental project (SEP). The SEP will consist of paving limestone roadways within the plant.
Defendants (1)
- Spectro Alloys CorporationNamed in complaintNamed in settlement
Facilities (1)
EGA SPECTRO ALLOYS
13220 REVIVAL WAY, ROSEMOUNT, MN, 55068
Registry ID: 110000423907
Statutes cited
- CAA 112D — MACT Standards
Enforcement conclusions (1)
SPECTRO ALLOYS CORPORATIONentered 2005-03-25
Primary law: CAA
Federal penalty: $49,058 · SEP: $150,000
Timeline (3 milestones)
- 2004-09-29Complaint Filed/Proposed Order
- 2004-09-30Enforcement Action Data Entered
- 2005-03-25Final Order Issued
Case metadata
- EPA activity ID
- 129712
- Case number
- 05-2004-3944
- Lead agency
- EPA
- EPA region
- 05
- Voluntary self-disclosure
- Yes
- Primary statute
- MACT Standards
Sourced verbatim from EPA ECHO Enforcement Case Report for case 05-2004-3944 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.