Skip to main content
05-1984-0059JudicialClosedFY 1984· Region 05

EPA v. HOOSIER ENERGY RURAL ELECTRIC

Final Order With Penalty

Penalty assessed

$40,000

Case summary

NATURE OF THE CASE HOOSIER ENERGY RURAL ELECTRIC COOPERATIVE, INC. OWNS AND OPERATES TWO COAL-FIRED BOILERS AT ITS MEROM GENERATING STATION. THESE BOILERS ARE SUBJECT TO NEW SOURCE PERFORM- ANCE STANDARDS FOR FOSSIIL-FUEL-FIRED STEAM GENERATORS, 40 C.F.R. PART 60, SUBPART D. THE BOILERS ARE OPERATED IN VIOLATION OF THE APPLICABLE NSPS SULFUR DIOXIDE EMISSION LIMITATION, OPERATION AND MAINTENANCE REQUIREMENTS, AND RE- QUIREMENT FOR CONTINUOUS MONITORING OF SULFUR DIOXIDE EMISSIONS. ACTUAL EMISSIONS DURING 1983 WERE APPROXIMATELY 71,500 TONS SULFUR DIOXIDE. ALLOWABLE EMISSIONS WERE AP- PROXIMATELY 30,700 TONS. CAUSE OF ACTION SECTION 113(B) OF THE CLEAN AIR ACT, 42 U.S.C. SECTION 7413(B), AUTHORIZES THE ADMINISTRATOR OF THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY TO COMMENCE A CIVIL ACTION TO ABATE VIOLATIONS OF THE ACT, 42 U.S.C. SECTION 7411(E). SECTION 111(E) PROHIBITS NEW SOURCE OPERATION IN VIOLATION OF APPLICABLE NSPS. PROPOSED REMEDY HOOSIER ENERGY MUST INITIATE IMPROVED OPERATION AND MAINTENANCE PROCEDURES AND DESIGN MODIFICATIONS TO THE LIMESTONE FLUE GAS DESULFURIZATION SYSTEM TO ACHIEVE COM- PLIANCE WITH THE APPLICABLE NSPS. THE RELIEF SOUGHT IN- CLUDES AN INJUNCTION REQUIREING DEFENDANT TO EXPEDITIOUSLY COMPLETE SUCH AFFIRMATIVE ACTIONS AS ARE NECESSARY TO ASSURE COMPLIANCE WITH APPLICABLE NSPS AND THE IMPOSITION OF CIVIL PENALTIES UP TO A MAXIMUM OF $25,000 PER DAY FOR EACH VIOLA- TION. ISSUES OF NATIONAL SIGNIFICANCE NONE.

Defendants (1)

  • HOOSIER ENERGY RURAL ELECTRIC COOP.Named in complaintNamed in settlement

Facilities (1)

  • HOOSIER ENERGY MEROM GENERATING STATION

    5500 HIGHWAY 54 WEST, SULLIVAN, IN, 47882

    Registry ID: 110000592831

Statutes cited

  • CAA 111New Source Performance Standards

Enforcement conclusions (1)

  • HOOSIER ENERGY RURAL ELECTRICentered 1986-09-30

    Primary law: CAA

    Federal penalty: $40,000

Timeline (7 milestones)

  • 1984-09-28Referred To Dept Of Justice
  • 1984-12-31Referred TO U.S. Attorney
  • 1985-01-10Complaint Filed With Court
  • 1986-09-30Final Order Lodged
  • 1986-09-30Final Order Entered
  • 1986-09-30Concluded
  • 1988-09-30Enforcement Action Closed

Case metadata

EPA activity ID
25301
Case number
05-1984-0059
Lead agency
EPA
HQ division
AIR
EPA region
05
Multimedia
No
Voluntary self-disclosure
No
Primary statute
New Source Performance Standards

Sourced verbatim from EPA ECHO Enforcement Case Report for case 05-1984-0059 . Bulk data: ICIS-FEC download summary.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.