EPA v. TENNESSEE VALLEY AUTHORITY (TVA) (FF)
Final Order No Penalty
Case summary
BIG CASE. The Compliance Agreement between EPA and TVA secures injunctive relief at all of TVA's coal-fired power plants across three states to resolve alleged violations of the Clean Air Act New Source Review provisions. Additional information on the entire settlement, as well as the Compliance Agreement, is available at http://www.epa.gov/compliance/resources/cases/civil/caa/tvacoal-fired.html The compliance agreement includes the following injunctive relief: An obligation to address 92 percent of TVA's coal-fired system between 2011 and 2018 with either the installation of state-of-the-art pollution controls such as selective catalytic reduction (SCR) or flue gas desulfurization (FGD), retirement, or repowering to renewable biomass: - For NOx, 60 percent of TVA's coal-fired system will be equipped with SCR, 16 percent will be retired, and 16 percent have the option to retire, retrofit with SCR, or repower to renewable biomass; - For SO2, 51 percent of TVA's coal-fired system will be equipped with FGD, 16 percent will be retired, and 25 percent have the option to retire, retrofit with FGD, or repower to renewable biomass; - Permanent retirement of 18 coal-fired units equating to about 16 percent of TVA's coal-fired electricity generating system; - Continuous operation of all new and existing SCRs and FGDs; - Optimization studies for existing PM controls to maximize PM emission reductions; - Compliance with annual descending system-wide tonnage caps for NOx and SO2; - Annual surrender of any excess NOx and SO2 allowances resulting from actions taken under the Compliance Agreement. This settlement also requires TVA to spend $350 million on environmental mitigation projects to address the impacts of past emissions. Communities near TVAs facilities will directly benefit from $350 million in environmental projects designed to reduce harmful air pollution and advance EPAs goals in addressing environmental justice issues. TVA will distribute a subset of the $350 million, a total of $60 million, to Alabama, Kentucky, North Carolina, and Tennessee for these states to implement projects of their choosing from a list of categories in the consent decree. Under the settlement with EPA, TVA will spend $290 million to perform the following projects: - $240 million as part of the Energy Efficiency Projects that are designed to increase efficiency in transmission and demand-side supply to displace utilization of coal-fired electricity generation. - $40 million to reduce greenhouse gases and other pollutants through the Clean/Renewable Energy Projects. - $8 million for a Clean Diesel Retrofit and Electric Vehicle Project that requires TVA to either retrofit in-service, public diesel engines with emission control equipment designed to reduce emissions of NOx and volatile organic compounds or to replace such vehicles with electric or hybrid-electric vehicles. - $1 million each to the National Park Service and the National Forest Service to improve, protect, or rehabilitate park and forest lands that have been injured by emissions from TV. In accordance with a separate but related Consent Agreement and Final Order (Docket No. CAA-04-2010-1528(b)) TVA is paying an $8 million penalty.
Defendants (1)
- TENNESSEE VALLEY AUTHORITYNamed in settlement
Facilities (49)
TVA
900 STEAM PLANT ROAD, TUSCUMBIA, AL, 35674
Registry ID: 110000367834
TVA
HWY 72, STEVENSON, AL, 35772
Registry ID: 110000604944
TENNESSEE VALLEY AUTHORITY - CUMBERLAND FOSSIL PLANT
815 CUMBERLAND CITY ROAD, CUMBERLAND CITY, TN, 37050
Registry ID: 110000493127
TENNESSEE VALLEY AUTHORITY - CUMBERLAND FOSSIL PLANT
815 CUMBERLAND CITY ROAD, CUMBERLAND CITY, TN, 37050
Registry ID: 110000493127
TVA
900 STEAM PLANT ROAD, TUSCUMBIA, AL, 35674
Registry ID: 110000367834
TENNESSEE VALLEY AUTHORITY - JOHNSONVILLE COMBUSTION TURBINE PLANT
535 STEAM PLANT ROAD, NEW JOHNSONVILLE, TN, 37134
Registry ID: 110000370535
TENNESSEE VALLEY AUTHORITY - CUMBERLAND FOSSIL PLANT
815 CUMBERLAND CITY ROAD, CUMBERLAND CITY, TN, 37050
Registry ID: 110000493127
TVA
900 STEAM PLANT ROAD, TUSCUMBIA, AL, 35674
Registry ID: 110000367834
TENNESSEE VALLEY AUTHORITY (TVA) - SHAWNEE FOSSIL PLANT
7900 METROPOLIS LAKE RD, WEST PADUCAH, KY, 42086
Registry ID: 110000493305
TENNESSEE VALLEY AUTHORITY - CUMBERLAND FOSSIL PLANT
815 CUMBERLAND CITY ROAD, CUMBERLAND CITY, TN, 37050
Registry ID: 110000493127
TVA
HWY 72, STEVENSON, AL, 35772
Registry ID: 110000604944
TENNESSEE VALLEY AUTHORITY - CUMBERLAND FOSSIL PLANT
815 CUMBERLAND CITY ROAD, CUMBERLAND CITY, TN, 37050
Registry ID: 110000493127
ALLEN FOSSIL PLANT TVA
2574 PLANT ROAD, MEMPHIS, TN, 381093014
Registry ID: 110000374130
TVA
HWY 72, STEVENSON, AL, 35772
Registry ID: 110000604944
TVA
HWY 72, STEVENSON, AL, 35772
Registry ID: 110000604944
- …and 34 more
Statutes cited
- CAA 165 — Prevention of Significant Deterioration (PSD)
Enforcement conclusions (1)
TENNESSEE VALLEY AUTHORITYentered 2011-06-13
Primary law: CAA
Timeline (2 milestones)
- 2010-05-05Enforcement Action Data Entered
- 2011-06-13Final Order Issued
Case metadata
- EPA activity ID
- 1800096964
- Case number
- 04-2010-1760
- Lead agency
- EPA
- EPA region
- 04
- Voluntary self-disclosure
- No
- Primary statute
- Prevention of Significant Deterioration (PSD)
Sourced verbatim from EPA ECHO Enforcement Case Report for case 04-2010-1760 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.