Skip to main content
04-2010-1006Administrative - FormalFinal Order IssuedFY 2010· Region 04

EPA v. MANEIKIS ENERGY, LLC

Final Order With Penalty

Case summary

3/23/2010 - CONSENT AGMT AND FINAL ORDER ISSUED, ASSESSING A PENALTY OF ZERO. THERE ARE NO ANNUAL MONITORING REPORTS IN THE RECORDS FILE FOR THE SUBJECT WELL. THEREFORE, RESPONDENT IS IN VIOLATION OF 40 CFR 144.51(a), ITS PERMIT, AND THE SDWA FOR FAILURE TO TIMELY SUBMIT ANNUAL MONITORING REPORTS FOR THE SUBJECT WELL. THERE ARE NO ANNUAL INJECTION FLUID ANALYSIS REPORTS IN THE RECORDS FILE FOR THE SUBJECT WELL. THEREFORE, RESPONDENT IS IN VIOLATION OF 40 CFR 144.51(a), ITS PERMIT, AND THE SDWA FOR FAILURE TO SUBMIT ANNUAL INJECTION FLUID ANALYSIS REPORTS FOR THE SUBJECT WELL. EPA REQUIRES A DEMONSTRATION OF MECHANICAL INTEGRITY AT LEAST ONCE EVERY 5 YEARS AS LONG AS THE WELL REMAINS ACTIVE. THE RECORDS FILE FOR THE WELL SHOWS THAT THE LAST MECHANICAL INTEGRITY TEST (MIT) WAS CONDUCTED ON SEPT 17, 2002. THEREFORE, RESPONDENT IS IN VIOLATION OF 40 CFR 144.51(a), ITS PERMIT, AND THE SDWA FOR FAILURE TO DEMONSTRATE MECHANICAL INTEGRITY BY SEPT 17, 2007. ORDER REQUIRES: RESPONDENT SHALL, WITHIN 30 DAYS, DEMONSTRATE BOTH INTERNAL AND EXTERNAL MECHANICAL INTEGRITY OF THE SUBJECT WELL, OR PLUG AND ABANDON THE WELL IN ACCORDANCE WITH AN EPA-APPROVED PLAN. IF THE SUBJECT WELL FAILS THE MIT TEST, RESPONDENT SHALL NOTIFY EPA WITHIN 24 HOURS OF THE FAILED MIT. WITHIN 90 DAYS OF THE FAILED MIT, RESPONDENT FAILED EITHER TAKE CORRECTIVE ACTION TO REMEDIATE AND RETEST THE WELL, OR P&A THE WELL ACCORDING TO AN EPA-APPROVED P&A PLAN. REPONDENT SHALL, WITHIN 30 DAYS, CONDUCT AN INJECTION FLUID ANALYSIS AND SUBMIT THE RESULT TO EPA. THEREAFTER, RESPONDENT SHALL CONDUCT AN INJECTION FLUID ANALYSIS AND SUBMIT THE RESULTS TO EPA ANNUALLY OR WHENEVER CHANGES ARE MADE TO THE INJECTION FLUID. RESPONDENT SHALL, WITHIN 30 DAYS, SUBMIT AN ANNUAL MONITORING REPORT TO EPA FOR THE YRS 2004 THRU 2009. THEREFORE, RESPONDENT SHALL MONITOR THE OPERATION OF THE SUBJECT WELL COVERING THE PERIOD FROM JANUARY 1ST TO DEC 31ST. THE ANNUAL MONITORING REPORT SHALL BE SUBMITTED BY JAN 30TH OF THE FOLLOWING YEAR.

Defendants (1)

  • MANEIKIS ENERGY, LLC (SB)Named in complaintNamed in settlement

Facilities (1)

  • RUSSELL BARRICK #1-V INJECTION WELL (MANEIKIS ENERGY, LLC)

    N36.926415 X W-85946276, COLUMBIA, KY, 42728

    Registry ID: 110041199084

Statutes cited

  • SDWA 1422/1423UIC Regulations Classes I - V

Enforcement conclusions (1)

  • MANEIKIS ENERGY, LLCentered 2010-03-23

    Primary law: SDWA

Timeline (3 milestones)

  • 2010-03-23Final Order Issued
  • 2010-03-23Complaint Filed/Proposed Order
  • 2010-03-25Enforcement Action Data Entered

Case metadata

EPA activity ID
1800086016
Case number
04-2010-1006
Lead agency
EPA
EPA region
04
Voluntary self-disclosure
No
Primary statute
UIC Regulations Classes I - V

Sourced verbatim from EPA ECHO Enforcement Case Report for case 04-2010-1006 . Bulk data: ICIS-FEC download summary.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.