EPA v. PEARL, MS, CITY OF/BASS PRO DRIVE CONSTRUCTION SITE
Unilateral Administrative Order Without Adjudication
Case summary
8/27/08 - ADMINISTRATIVE ORDER ISSUED. ON NOV 14, 2007, EPA AND MDEQ PERFORMED A COMPLIANCE STORMWATER EVALUATION INSPECTION (CSWEI) AT BASS PRO DRIVE TO EVALUATE THE TREATMENT AND DISPOSAL OF STORMWATER. DURING THE CSWEI, EPA OBSERVED THE FOLLOWING: A. THE CITY FAILED TO INSTALL NECESSARY BMPs REQUIRED IN THEIR SWPPP; I.E., SILT FENCES, HAY BALES, DITCH CHECKS ETC. B. THE SILT FENCING ALONG THE BANK AREA OF CONWAY SLOUGH DID NOT EXIST, OR WAS IN NEED OF MAINTENANCE. THE CITY FAILED TO PROVIDE FOR ADEQUATE MAINTENANCE OF SILT FENCING. C. NO VELOCITY DISSIPATION DEVICES REQUIRED IN THE SWPPP ALONG CONWAY SLOUGH WERE IN PLACE TO PROVIDE FOR A NON-EROSIVE FLOW. THE CITY FAILED TO PROVIDE FOR VELOCITY DISSIPATION DEVICES. D. AN OPEN DIVERSION DITCH WAS EXCAVATED TO DIVERT WATER IN CONWAY SLOUGH AROUND THE AREA OF CONSTRUCTION OF A CONCRETE BOX CULVERT AND BACK INTO CONWAY SLOUGH. THE DITCH WAS ROUTED DIRECTLY T THE SLOUGH WITHOUT INSTALLATION OF BMPs SPECIFIED IN THE SWPPP. THE CITY FAILED TO PROVIDE INSTALLATION OF NEEDED BMPs BEFORE COMMENCEMENT OF CONSTRUCTION. E. UNCONTROLLED SEDIMENT HAD BEEN ALLOWED TO ENTER THE DIVERSION DITCH AND CONWAY SLOUGH. THE CITY FAILED TO ENSURE THAT STORMWATER DISCHARGES WERE FREE OF EXCESSIVE SEDIMENT AND FLOATING MATERIALS. F. THE DIVERSION DITCH AND THE AREA AROUND THE CONCRETE CULVERT HAVE SHOWN EVIDENCE OF POTENTIAL DISCHARGE OF STORMWATER DIRECTLY TO CONWAY SLOUGH. THESE DISCHARGE POINT SOURCES WERE NOT IDENTIFIED IN THE SWPPP AS PERMITTED OUTFALLS. G. EVIDENCE OF OFF-SITE ACCUMULATION OF SEDIMENT WAS OBSERVED IN THE DIVERSION DITCH AND CONWAY SLOUGH. THE CITY FAILED TO PROVIDE ADEQUATE BMPs TO MINIMIZE, PREVENT, AND MITIGATE THE ADVERSE IMPACTS FROM THE STORMWATER RUNOFF. H. APPROPRIATE SECTION 404 DOCUMENTATION FROM THE U.S. ARMY CORPS OF ENGINEERS WAS NOT AVAILABLE FOR REVIEW DURING THE INSPECTION. THE DEVELOPMENT REQUIRES AN ARMY CORPS OF ENGINEER PERMIT FOR CONSTRUCTION ACTIVITY IN CONWAY SLOUGH. I. WEEKLY INSPECTION RECORDS OF BMPS ON SITE WERE NOT AVAILABLE FOR REVIEW DURING THE INSPECCTION. J. WITHOUT REVIEWING THE INSPECTION RECORDS, EPA WAS UNABLE TO DETERMINE THE STATUS OF THE STABLIZATION REQUIREMENT ON THE DISTURBED AREAS OF THE DEVELOPMENT WHICH APPEAR TO BE CLOSE TO FINAL GRADE.
Defendants (2)
- PEARL, MS, CITY OFNamed in settlement
- BASS PRO DRIVENamed in settlement
Facilities (1)
CITY OF PEARL, MS/BASS PRO DRIVE
U.S. HIGHWAY 80 AND U.S. HIGHWAY 49, PEARL, MS, 39288
Registry ID: 110037239217
Statutes cited
- CWA 301/402 — NPDES Permit Violations
Enforcement conclusions (1)
PEARL, MS, CITY OF/BASS PRO DRIVE CONSTRUCTION SITEentered 2008-08-27
Primary law: CWA
Timeline (3 milestones)
- 2008-08-27Final Order Issued
- 2008-08-29Enforcement Action Data Entered
- 2009-01-01Enforcement Action Closed
Case metadata
- EPA activity ID
- 1400000863
- Case number
- 04-2008-4977
- Lead agency
- EPA
- EPA region
- 04
- Voluntary self-disclosure
- No
- Primary statute
- NPDES Permit Violations
Sourced verbatim from EPA ECHO Enforcement Case Report for case 04-2008-4977 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.