EPA v. CITY OF CAMDEN, SC (CAMDEN WWTF)
Unilateral Administrative Order Without Adjudication
Case summary
3/10/04 - COMPLIANCE ORDER ISSUED. VIOLATION: FAILURE TO COMPLY WITH THE WHOLE EFFLUENT TOXICITY LIMITS OF THE PERMIT. ORDER REQUIRES: 1. RESPONDENT SHALL INITIATE A SERIES OF WHOLE EFFLUENT TOXICITY TESTS BEGINNING ON THE FIRST FULL MONTH FOLLOWING THE RECEIPT OF THE EFFECTIVE ORDER. ONE TEST SHALL BE CONDUCTED EVERY TWO WEEKS, FOR A PERIOD NOT TO EXCEED ONE YEAR, USING CERIODAPHNIA DUBIA. TESTS SHALL BE CONDUCTED IN ACCORDANCE WITH PART V, SECTION B OF THE PERMIT. THE RESULTS OF EACH TEST SHALL BE SUBMITTED TO EPA AND SCDHEC WITHIN 45 DAYS OF COMPLETION. 2. IF, AT ANY TIME DURING THE ACCELERATED TESTING PERIOD, THE EFFLUENT FROM THE FACILITY IS IN VIOLATION OF RESPONDENT'S WHOLE EFFLUENT TOXICITY PERMIT LIMITS, THE RESPONDENT SHALL CONDUCT A TOXICITY REDUCTION EVALUATION (TRE). WITHIN 30 DAYS OF SUCH A FAILURE, THE RESPONDENT SHALL SUBMIT A TRE PLAN. THIS TRE PLAN SHALL BE CONSISTENT WITH THE PROCEDURES AND PROTOCOLS IN TOXICITY REDUCTION EVALUATION PROTOCOL FOR MUNICIPAL WASTEWATER TREATMENT PLANTS (EPA/600-2-88/062). THE TRE PLAN SHALL INCLUDE A SCHEDULE OF ACTIVITIES NECESSARY TO ATTAIN COMPLIANCE WITH WHOLE EFFLUENT TOXICITY LIMITS. THE TRE SHALL BE COMPLETED AND COMPLIANCE WITH EFFLUENT LIMITS ATTAINED NO LATER THAN 18 MONTHS FROM THE DATE THE TRE IS REQUIRED. 3. 90 DAYS AFTER SUBMITTAL OF THE TRE PLAN AND SCHEDULE REQUIRED ABOVE, AND EACH 90 DAYS THEREAFTER, THE RESPONDENT SHALL SUBMIT A REPORT ON THE PROGRESS MADE TOWARD ATTAINMENT OF COMPLIANCE. 4. RESPONDENT SHALL CONTINUE TOXICITY TESTING AS REQUIRED BY THE PERMIT FOR THE DURATION OF THIS ORDER. HOWEVER, IF THE RESPONDENT IS REQUIRED TO INITIATE A TRE, NO ADDITIONAL TESTING WILL BE REQUIRED FOR ANY ROUTINE TEST FAILURE WHICH OCCURS WHILE THE TRE IS UNDERWAY (WHERE ROUTINE TESTS ARE THOSE TESTS TAKEN AT THE FREQUENCY REQUIRED BY PART III, SECTION B OF THE PERMIT). 5. TO ENSURE COMPLIANCE WITH TOXICITY LIMITS AFTER THE COMPLETION OF THE TRE, THE RESPONDENT SHALL CONDUCT A SERIES OF 6 MULTI-CONCENTRATION TESTS USING CERIODAPHNIA DUBIA, TO BE PERFORMED ON A MONTHLY BASIS. THE TESTS SHALL BE CONDUCTED IN COMPLIANCE WITH THE SHORT-TERM METHODS FOR ESTIMATING THE CHRONIC TOXICITY OF EFFLUENTS AND RECEIVING WATERS TO FRESHWATER ORGANISMS, EPA -821-R-02-013 (OCTOBER 2003) AND SHALL CONSIST OF A CONTROL AND THE FOLLOWING DILUTIONS OF THE RECEIVING WATER CONENTRATION (RWC): 6.25%, 12.5%, 25%, 50%, AND 100%
Defendants (1)
- CAMDEN, SC, CITY OFNamed in settlement
Facilities (1)
CAMDEN WWTF
175 BRAMBLEWOOD PLANTATION ROAD, CAMDEN, SC, 29020
Registry ID: 110000755843
Statutes cited
- CWA 301 — NPDES Discharge without a Permit
Enforcement conclusions (1)
CITY OF CAMDEN, SC (CAMDEN WWTF)entered 2005-03-10
Primary law: CWA
Timeline (4 milestones)
- 2005-03-10Final Order Issued
- 2005-03-23Enforcement Action Data Entered
- 2007-01-01Enforcement Action Closed
- 2007-01-01NPDES Closed
Case metadata
- EPA activity ID
- 142153
- Case number
- 04-2005-4766
- Lead agency
- EPA
- EPA region
- 04
- Voluntary self-disclosure
- No
- Primary statute
- NPDES Discharge without a Permit