EPA v. RYLAND HOMES (PROVIDENCE GROVE)
Unilateral Administrative Order Without Adjudication
Case summary
7/30/04 - COMPLIANCE ORDER ISSUED. VIOLATIONS: FAILURE TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS; FAILURE TO MAINTAIN A RECORD OF THE EROSION AND SEDIMENT CONTROL FACILITY INSPECTION; FAILURE TO ADEQUATELY INSTALL AND/OR MAINTAIN TEMPORARY OR PERMANENT MEASURES THROUGHOUT THE SITE TO CONTROL AND RETAIN SEDIMENT, INCLUDING SILT FENCING; CONSTRUCTION ENTRANCES AND EXITS; STORM INLET PROTECTION; OUTLET AND OUTFALL PROTECTION; LFACK OF ADEQUATE GROUNDCOVER AROUND THE SLOPES AND SEDIMENTATION BASINS; INSTALLING AND CONNECTING SOTRM DRAIN INFRASTRUCTURE INTO PERMANENT OUTFALLS PRIOR TO SITE STABILIZATION INSTEAD OF CONNECTING TO TEMPORARY SEDIMENTATION BASINS; INADEQUATE SLOPE GRADES AT STREAM CROSSINGS; AND INADEQUATE CONSTRUCTION OF SEDIMENTATION BASIN
Defendants (1)
- RYLAND HOMESNamed in settlement
Facilities (1)
PROVIDENCE GROVE
PROVIDENCE DRIVE, WAXHAW, NC, 28173
Registry ID: 110017838447
Statutes cited
- CWA 301/402 — NPDES Permit Violations
Enforcement conclusions (1)
RYLAND HOMES (PROVIDENCE GROVE)entered 2004-07-30
Primary law: CWA
Timeline (3 milestones)
- 2004-07-30Final Order Issued
- 2004-08-09Enforcement Action Data Entered
- 2007-01-01Enforcement Action Closed
Case metadata
- EPA activity ID
- 125061
- Case number
- 04-2004-4801
- Lead agency
- EPA
- EPA region
- 04
- Voluntary self-disclosure
- No
- Primary statute
- NPDES Permit Violations