EPA v. OVERCASH GRAVEL AND GRADING CO., INC. (HEARTLAND PLACE SUBDIVISION)
Unilateral Administrative Order Without Adjudication
Case summary
6/14/04 - COMPLIANCE ORDER ISSUED. RESPONDENT FAILED TO COMPLY WITH THE PERMIT AT THE FACILITY AS FOLLOWS: FAILING TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS. FAILING TO ADEQUATELY INSTALL AND/OR MAINTAIN TEMPORARY OR PERMANENT MEASURES TO CONTROL AND RETAIN SEDIMENT, INCLUDING INSTALLATION AND MAINTENANCE OF SILT FENCING; FAILING TO INSTALL AND/OR MAINTAIN OUTLET PROTECTION; FAILING TO ADEQUATELY MAINTAIN SEDIMENTATION BASINS; FAILING TO INSTALL DIVERSION DITCHES; LACK OF GRAVEL ON ENTRANCES/EXITS; AND LACK OF GROUNDCOVER ON GRADED AREAS THROUGHOUT THE SITE WHERE CONSTRUCTION HAS CEASED FOR MORE THAN 15 DAYS. ORDER REQUIRES: WITHIN 7 CALENDAR DAYS, OVERCASH SHALL TAKE CORRECTIVE ACTION TO CONTROL THE DISCHARGE OF SEDIMENTS FROM THE FACILTY, INCLUDING THE INSTALLATION AND MAINTENANCE OF SILT FENCES; INSTALLATION AND/OR MAINTENANCE OF OUTLET PROTECTION; GRAVEL ON ENTRANCES/EXITS; AND GROUNDCOVER ON GRADED AREAS THROUGHOUT SITE WHERE CONSTRUCTION HAS CEASED FOR MORE THAN 15 DAYS. WITHIN 7 CALENDAR DAYS, OVERCASH SHALL INSTALL AND MAINTAIN SEDIMENTATION BASINS, SEDIMENT TRAPS, AND DIVERSION DITCHES AS SHOW ON THE PLAN FOR THE FACILITY. WITHIN 7 CALENDAR DAYS, OVERCASH SHALL PROVIDE OPERATION AND MAINTENANCE BY INSTALLING, REPAIRING, AND MAINTAINING SILT FENCES; INSTALLING AND/OR MAINTAINING OUTLET PROTECTION; INSTALLING AND MAINTAINING SEDIMENTATION BASINS AND DIVERSION DITCHES; PROVIDING GRAVEL ON ENTRANCES/EXITS; AND PROVIDING GROUNDCOVER ON GRADED AREAS THROUGHOUT SITE WHERE CONSTRUCTION HAS CEASED FOR MORE THAN 15 DAYS. WITHIN 14 CALENDAR DAYS, OVERCASH SHALL PROVIDE WRITTEN NOTIFICATION STATING WHEN THE REPAIRS, INSTALLATION AND/OR MAINTENANCE WERE COMPLETED. OVERCASH SHALL IMMEDIATELY INSTITUTE AN INSPECTION PROGRAM AT ITS FACILITY. WITHIN 14 CALENDAR DAYS, OVERCASH SHALL SUBMIT WRITTEN CERTIFICATION THAT THE INSPECTION PROGRAM HAS BEEN INSTITUTED AT ITS FACILITY TO ADEQUTELY DOCUMENT EROSION AND SEDIMENT CONTROL. EVERY 30 CALENDAR DAYS, FOR A PERIOD OF THREE MONTHS, OVERCASH SHALL SUBMIT COPIES OF ALL INSPECTION REPORTS TO EPA AND CABARRUS COUNTY.
Defendants (1)
- OVERCASH GRAVEL AND GRADING CO., INC.Named in settlement
Facilities (1)
HEARTLAND RIDGE SUBDIVISION
BRIDLEWOOD PLACE, CONCORD, NC, 28025
Registry ID: 110017752029
Statutes cited
- CWA 301/402 — NPDES Permit Violations
Enforcement conclusions (1)
OVERCASH GRAVEL AND GRADING CO., INC. (HEARTLAND PLACE SUBDIVISION)entered 2004-06-14
Primary law: CWA
Timeline (3 milestones)
- 2004-06-14Final Order Issued
- 2004-06-30Enforcement Action Data Entered
- 2007-01-01Enforcement Action Closed
Case metadata
- EPA activity ID
- 121983
- Case number
- 04-2004-4796
- Lead agency
- EPA
- EPA region
- 04
- Voluntary self-disclosure
- No
- Primary statute
- NPDES Permit Violations
Sourced verbatim from EPA ECHO Enforcement Case Report for case 04-2004-4796 . Bulk data: ICIS-FEC download summary.