EPA v. ROUSE STEEL DRUM SUPERFUND SITE
Litigated With Specified Cost Recovery
Cost recovery
$582,534
Case summary
ACTION AT THE ROUSE STEEL DRUM SUPERFUND SITE TO OBTAIN REIMBURSEMENT OF APPROX. $1,051,271.16 IN PAST RESPONSE COSTS. THE SITE IS LOCATED IN A LIGHT INDUSTRIAL AREA IN JACKSONVILLE, DUVAL COUNTY, FLORIDA. THE SITE IS BORDERED TO THE EAST BY RESIDENTIAL HOMES AND TO THE WEST BY A RAILROAD RIGHT-OF-WAY. THE SITE IS BORDERED TO THE NORTH BY 13TH STREET AND 11TH STREET TO THE SOUTH. THE SITE IS DIVIDED INTO 2 TRACTS OF PROPERTY BY 12TH STREET. FROM 1965 TO ROUGHLY 1989, THE ROUSE STEEL DRUM CO., INC. AND/OR ITS CORPORATE PREDECESSOR/SUCCESSOR, OPERATED A DRUM RECLAMATION FACILITY AT THE SITE. DURING ITS PERIOD OF OPERATIONS, ROUSE ACCEPTED USED 55-GALLON STEEL OR PLASTIC DRUMS FROM PULP/PAPER MILLS, AND CHEMICAL AND PETROLEUM MANUFACTURERS FOR RECONDITIONING. THESE DRUMS WERE RINSED AND CLEANED ON-SITE. EACH DRUM WAS SANDBLASTED TO REMOVE ANY RESIDUAL RUST AND THEN SPRAY PAINTED FOR RESALE AND RE-USE. WASTE WATER GENERATED FROM THIS RECLAMATION PROCESS WAS COLLECTED IN CONCRETE PITS. AFTER THE WASTE HAD GONE THROUGH AN OIL-WATER SEPARATION PROCESS IT WAS PUMPED INTO STORAGE TANKS FOR DISPOSAL BY LOCAL SEPTIC TANK COMPANIES. THE REGION BECAME AWARE OF THE SITE IN SEPTEMBER 1993, IN RESPONSE TO A REQUEST FROM THE FLORIDA DEPT. OF ENVIRONMENTAL PROTECTION TO CONDUCT A REMOVAL SITE EVALUATION. AS A RESULT OF THIS EVALUATION, THE REGION DETERMINATED THAT THE SITE POSED AN IMMINENT AND SUBSTANTIAL ENDANGERMENT TO THE PUBLIC HEALTH AND WELFARE AND THE ENVIRONMENT. AS A RESULT, A REMOVAL ACTION WAS INITIATED IN THREE PHASES. PHASE 1 INCLUDED EMERGENCY STABILIZATION EFFORTS, WHICH WERE CONDUCTED IN SEPTEMBER 1993. PHASE II INCLUDED A WASTE CHARACTERIZATION STUDY, WHICH WAS CONDUCTED FROM FEBRUARY 14, 1994 THROUGH NOVEMBER 1996. PHASE III INCLUDED THE SITE CLEANUP, WHICH THE REGION WAS ABLE TO NEGOTIATE COMPLETION OF BY A PRP GROUP AND WAS CONDUCTED FROM JANUARY 1997 THROUGH APRIL 1997.
Defendants (19)
- ALLIED BENDIX, INC.
- CASTROL OILS, INC.
- SHELL OIL CO.
- SUNOCO, INC.
- SW FOREST INDUSTRIES
- UNION CAMP
- WELDEN PROPERTIESNamed in complaintNamed in settlement
- WELDEN, JACKIE B.Named in complaintNamed in settlement
- CONTAINER CORP. OF AMERICA
- CORONADO PAINT CO.
- GATEWAY CHEMICAL, INC.
- INTERNATIONAL PAPER CO.
- JACK BECKER DISTRIBUTORS, INC.
- JOHNS MANVILLE CORP.
- KERR MCGHEE
- MILLENNIUM SPECIALTY CHEMICALS INC.
- MOBIL OIL CORP.
- REICHHOLD CHEMICAL
- ROUSE STEEL DRUM GROUP
Facilities (1)
ROUSE STEEL DRUM CO
612 12TH STREET EAST, JACKSONVILLE, FL, 322060
Registry ID: 110002528612
Statutes cited
- CERCLA 107A — Cost Recovery
Enforcement conclusions (1)
ROUSE STEEL DRUM (JACQUELINE WELDEN & WELDEN PROPEentered 2000-12-28
Primary law: CERCLA
Timeline (6 milestones)
- 2000-03-09Referred To Dept Of Justice
- 2000-03-14Enforcement Action Data Entered
- 2000-04-28Complaint Filed With Court
- 2000-12-28Final Order Lodged
- 2000-12-28Final Order Entered
- 2000-12-28Concluded
Case metadata
- EPA activity ID
- 23520
- Case number
- 04-2000-0115
- Lead agency
- EPA
- HQ division
- CER
- Branch
- CER
- EPA region
- 04
- Multimedia
- No
- Voluntary self-disclosure
- No
- Primary statute
- Cost Recovery