03-2022-7001JudicialConcludedFY 2022· Region 03

EPA v. Waco Oil & Gas Co., Inc

Final Order With Penalty

Case summary

On October 5, 2021, EPA referred a civil judicial action to DOJ against Waco Oil & Gas Company, Inc. (?Waco?) for violations of Sections 301 and 404 of the CWA in the form of unauthorized discharges of dredged and/or fill material to waters of the United States in connection with construction of a site for speculative development in Braxton County, West Virginia. Beginning in September 2016, Waco operated equipment that discharged dredged and/or fill material to construct two flat pads and an access road causing direct impacts to 6 separate stream channels, filling 2,059 linear feet of stream and 0.19 acres of wetlands, and causing secondary impacts as a result of the fill of downstream aquatic resources. Waco performed this work without a required permit from the U.S. Army Corps of Engineers, and has a previous history of similar violations at other locations in the state. Waco has so far failed to comply with a unilateral administrative order issued by the Region on February 9, 2021 to develop a restoration plan to adequately address the impacts on-site, and to submit a certificate of temporary stabilization. Through the referral, EPA seeks to require Waco to stabilize the site, submit an adequate restoration plan that includes compensatory mitigation as necessary, and pay a penalty. The West Virginia Department of Environmental Protection was informed of EPA?s intent to refer the matter, and expressed interest in joining the action as a co-plaintiff to bring claims relating to Waco?s violation of its state construction stormwater permit.

Defendants (1)

  • Waco Oil & Gas Co. IncNamed in complaintNamed in settlement

Facilities (1)

  • ROUTE 19 MORRIS DEVELOPMENT (WACO OIL & GAS)

    APPROX. 1.25 MILES EAST ON ROUTE 19 FROM I-79, SUTTON, WV, 26601

    Registry ID: 110070703618

Statutes cited

  • CWA 301NPDES Discharge without a Permit
  • CWA 404Permits for Dredge and Fill Material

Enforcement conclusions (1)

  • Waco Oil & Gas co., Incentered 2024-02-20

    Primary law: CWA

    Federal penalty: $412,500 · State/local: $412,500

Timeline (6 milestones)

  • 2021-10-04Referred To Dept Of Justice
  • 2021-12-01Enforcement Action Data Entered
  • 2023-09-28Final Order Lodged
  • 2023-09-28Complaint Filed With Court
  • 2024-02-20Concluded
  • 2024-02-20Final Order Entered

Case metadata

EPA activity ID
3602908952
Case number
03-2022-7001
Lead agency
EPA
EPA region
03
Voluntary self-disclosure
No
Primary statute
NPDES Discharge without a Permit

Sourced verbatim from EPA ECHO Enforcement Case Report for case 03-2022-7001 . Bulk data: ICIS-FEC download summary.