EPA v. WALMART
Final Order No Penalty
Case summary
On February 9, 2015, EPA Region III executed an administrative order on consent (AOC) to Wal-Mart Stores, Inc. (Walmart), resolving CWA violations of EPA�s General Permit for discharges of stormwater associated with construction activities at Walmart�s Washington, D.C. construction site located at 5929 Georgia Avenue. During a February 2013 inspection of the Georgia Avenue construction site, EPA found that Walmart failed to maintain perimeter stormwater controls, failed to minimize sediment trackout, and failed to protect stormwater inlets at the construction site, and also failed to update its stormwater pollution prevention plan maintained at the construction site. In the AOC, Walmart agreed to take corrective measures immediately to address each of these construction activities and to develop and submit a long term plan to demonstrate continued compliance with the EPA Construction General Permit.
Defendants (1)
- WALMARTNamed in settlement
Facilities (1)
WALMART
5929 GEORGIA AVE NW, WASHINGTON, DC, 20011
Registry ID: 110002499573
Statutes cited
- CWA 301/402 — NPDES Permit Violations
Enforcement conclusions (1)
WALMARTentered 2015-02-09
Primary law: CWA
Timeline (2 milestones)
- 2015-02-09Final Order Issued
- 2015-02-17Enforcement Action Data Entered
Case metadata
- EPA activity ID
- 3600070763
- Case number
- 03-2015-0047
- Lead agency
- EPA
- EPA region
- 03
- Voluntary self-disclosure
- No
- Primary statute
- NPDES Permit Violations
Sourced verbatim from EPA ECHO Enforcement Case Report for case 03-2015-0047 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.