EPA v. COOPER INDUSTRIES, LLC, ET. AL. (LIN ELECTRIC SITE)
Final Order With Specified Cost Recovery
Case summary
COOPER INDUSTRIES, LLC ( COOPER ) AND ITS PREDECESSORS OPERATED THE SITE BETWEEN 1924 AND 1988. COOPER BUILT EECTRIC MOTORS AND TRANSFORMER USED IN THE COAL MINING INDUSTRY. THE MOTORS AND TRANSFORMER WERE CLEANED WITH TRICHLOROETHYLEN ( TCE ) AND POLCHLORINATED BIPHENYLS ( PCB ) WERE PRESENT IN THE WASTE AS A RESULT OF THE CLEANING OPERATIONS. EPA INITIATED A REMOVAL ACTION IN 2008 TO ADDRESS PCB CONTAMINATION IN THE BLUESTONE RIVER. EPA ISSUED COOPER A UNILATERAL ADMINISTRATIVE ORDER TO PERFORM CERTAIN DISCRETE RESPONSE ACTIONS AT THE SITE, INCLUDING HTE REMOVAL OF WASTE PILES SET ASIDE BY EPA FOR DISPOSAL DURING THE REMOVAL. THIS PROPOSED SETTLEMENT COOPER'S LIABILITY FOR EPA'S PAST RESPONSE COSTS AT THE SITE.
Defendants (3)
- LUSK, DANNY, E.
- COOPER INDUSTRIES, LLCNamed in complaintNamed in settlement
- LUSK, GORDON, M.
Facilities (1)
LIN ELECTRIC COMPANY
1400 BLUEFIELD AVENUE, BLUEFIELD, WV, 24701
Registry ID: 110020583420
Statutes cited
- CERCLA 107A — Cost Recovery
Enforcement conclusions (1)
COOPER INDUSTRIES, LLC (LIN ELECTRIC SITE)entered 2013-07-23
Primary law: CERCLA
Timeline (6 milestones)
- 2012-05-30Referred To Dept Of Justice
- 2012-06-06Enforcement Action Data Entered
- 2013-05-23Complaint Filed With Court
- 2013-05-23Final Order Lodged
- 2013-07-23Concluded
- 2013-07-23Final Order Entered
Case metadata
- EPA activity ID
- 3000026341
- Case number
- 03-2012-7014
- DOJ docket
- 90-11-3-10604
- Lead agency
- EPA
- EPA region
- 03
- Voluntary self-disclosure
- No
- Primary statute
- Cost Recovery
Sourced verbatim from EPA ECHO Enforcement Case Report for case 03-2012-7014 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.