EPA v. C. SHOPS, LLC
Final Order With Penalty
Case summary
THE FACILITY FAILED TO OPERATE AND MAINTAIN ITS CORROSION PROTECTION SYSTEM CONTINOUSLY AS REQUIRED BY 40 CFR SUBSECTION 280.31(a). THE FACILITY FAILED TO INSPECT THE IMPRESSED CURRENT SYSTEM EVERY 60 DAYS AS REQUIRED BY 40 CFR SUBSECTION 280.31(c).
Defendants (1)
- JOHN CONNOR, OWNER (SB)Named in complaintNamed in settlement
Facilities (1)
BP GAS STATION
5001 CONNECTICUT AVENUE, WASHINGTON, DC, 20008
Registry ID: 110028115322
Statutes cited
- RCRA 9003 — UST Release Detection, Prevention, Correction Regulations
Enforcement conclusions (1)
C. SHOPS, LLCentered 2008-12-05
Primary law: RCRA
Federal penalty: $300
Timeline (3 milestones)
- 2008-12-05Final Order Issued
- 2008-12-05Complaint Filed/Proposed Order
- 2008-12-05Enforcement Action Data Entered
Case metadata
- EPA activity ID
- 1400018792
- Case number
- 03-2009-0017
- Lead agency
- EPA
- EPA region
- 03
- Voluntary self-disclosure
- No
- Primary statute
- UST Release Detection, Prevention, Correction Regulations
Sourced verbatim from EPA ECHO Enforcement Case Report for case 03-2009-0017 . Bulk data: ICIS-FEC download summary.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.