EPA v. Monroe Contracting Equipment, Inc. (SB)

Final Order With Penalty

Case summary

This facility was issued a Field Citation for the following violations: 280.31(b) - Failure to ensure proper operation of CP system; 280.41(a) - Failure to monitor tanks at least 30 days; 280.41(b)(1)(ii) - Failure to have annual line tightness test or perform monthly monitoring on pressurized piping, 280.44(a) - Failure to provide adequate leak detection system for underground piping. There was no injunctive relief sought.

Defendants (1)

  • Monroe Contracting Equipment, Inc. (SB)Named in complaintNamed in settlement

Facilities (1)

  • POOLER ENTERPRISES INC

    749 PHILLIPS ROAD, FISHERS, NY, 14453

    Registry ID: 110042349223

Statutes cited

  • RCRA 9003UST Release Detection, Prevention, Correction Regulations

Enforcement conclusions (1)

  • Monroe Contracting Equipment, Inc. (SB)entered 2011-04-04

    Primary law: RCRA

    Federal penalty: $1,260

Timeline (4 milestones)

  • 2011-04-04Enforcement Action Closed
  • 2011-04-04Final Order Issued
  • 2011-04-04Complaint Filed/Proposed Order
  • 2011-04-06Enforcement Action Data Entered

Case metadata

EPA activity ID
2600011179
Case number
02-2011-7937
Lead agency
EPA
Branch
WTS
EPA region
02
Voluntary self-disclosure
No
Primary statute
UST Release Detection, Prevention, Correction Regulations

Sourced verbatim from EPA ECHO Enforcement Case Report for case 02-2011-7937 . Bulk data: ICIS-FEC download summary.