EPA v. Roseland Contractors, LLC et al.

Unilateral Administrative Order Without Adjudication

Case summary

One Respondent is the permittee and operates a 9.8 acre residential development construction site in Weehawken, NJ. The other Respondent is the owner of the site. The site is named the Banana Building and is also known as Henley on Hudson. The facility had a NJ construction stormwater general permit but its stormwater pollution prevention plan was incomplete, records of site inspections and annual reports were unavailable, and there were stormwater BMPs that needed to be implemented.

Defendants (2)

  • Port Imperial South BB, LLCNamed in settlement
  • Roseland Contractors, LLCNamed in settlement

Facilities (1)

  • LENNAR SITE

    7 PORT IMPERIAL BOULEVARD, WEEKAWKEN, NJ, 07086

    Registry ID: 110039517966

Statutes cited

  • CWA 301/402NPDES Permit Violations

Enforcement conclusions (1)

  • Roseland Contractors, LLC et al.entered 2010-01-26

    Primary law: CWA

Timeline (3 milestones)

  • 2010-01-26Enforcement Action Closed
  • 2010-01-26Final Order Issued
  • 2010-01-28Enforcement Action Data Entered

Case metadata

EPA activity ID
1800073005
Case number
02-2010-3015
Lead agency
EPA
Branch
WGL
EPA region
02
Voluntary self-disclosure
No
Primary statute
NPDES Permit Violations

Sourced verbatim from EPA ECHO Enforcement Case Report for case 02-2010-3015 . Bulk data: ICIS-FEC download summary.