Skip to main content
01-1999-0113JudicialConcludedFY 1999· Region 01

EPA v. FURTADO, MANUEL (BRISTOL)

Final Order With Specified Cost Recovery

Case summary

SITE ENCOMPASSES 20 AND 22 BIRCH SWAMP RD AND A PARCEL OF TOWN CONSERVATION LAND IN WARREN, RI. MANUEL FURTADO JR. OWNED 20 AND 22 BIRCH SWAMP LAND FROM 1983 TO 1986. IN 1986 FURTADO SOLD 20 BIRCH SWAMP RD, BUT RETAINED OWNERSHIP AND OPERATED BRISTOL SANDBLASTING COMPANY. THE COMPANY CONDUCTED SANDBLASTING ACTIVITIES ON VEHICLES AT 22 BIRCH SWAMP RD. IN ADDITON, THE COMPANY SANDBLASTED BUILDINGS AT OTHER LOCATION THE COMPANY AND MR FURTADO DISPOSED OF SANDBLASTING RESIDUE CONTAINING LEAD AND POSSIBLY PCBS AT THE SITE. EPA CONDUCTED A REMOVAL ACTION AT THE SITE WHICH CONSISTED PRIMARILY OF EXCAVATION AND OFF-SITE DISPOSAL OF CONTAMINATED SOIL. EPA INCURRED $1,538,769 IN RESPONSE COSTS.

Defendants (1)

  • FURTADO, MANUELNamed in complaintNamed in settlement

Facilities (1)

  • BRISTOL SANDBLASTING

    20 AND 22 BIRCH SWAMP ROAD, WARREN, RI, 02885

    Registry ID: 110009309836

Statutes cited

  • CERCLA 107ACost Recovery

Enforcement conclusions (1)

  • FURTADO, MANUEL BRISTOL SANDBLASTINGentered 2002-10-01

    Primary law: CERCLA

Timeline (7 milestones)

  • 1999-08-30Referred To Dept Of Justice
  • 1999-10-05Enforcement Action Data Entered
  • 2000-02-04Referred TO U.S. Attorney
  • 2000-02-04Complaint Filed With Court
  • 2002-07-19Final Order Lodged
  • 2002-10-01Concluded
  • 2002-10-01Final Order Entered

Case metadata

EPA activity ID
1102
Case number
01-1999-0113
Lead agency
EPA
HQ division
CER
Branch
CERC
EPA region
01
Multimedia
No
Voluntary self-disclosure
No
Primary statute
Cost Recovery

Sourced verbatim from EPA ECHO Enforcement Case Report for case 01-1999-0113 . Bulk data: ICIS-FEC download summary.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.