Construction by force account
Primary source
Verbatim text below is from the Electronic Code of Federal Regulations (eCFR), a public-domain U.S. government work. Always verify the current version with the eCFR before relying on it for any legal matter.
Full Text
The borrower shall require that:
(a) Minor construction by the force account method be supervised by a competent foreman. The work shall be performed in accordance with all regulatory and safety codes.
(b) Daily time and material reports, referenced by the work project number, shall be kept to record labor and materials used as construction is performed.
(c) The construction foreman shall maintain a tabulation of all construction units installed.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.