HOUSE 684117th CongressReferred to the Subcommittee on Energy and Mineral Resources.
Keystone XL Pipeline Construction and Jobs Preservation Act
- Last Action
- 2/25/2021
Actions
- 2021-02-25Referred to the Subcommittee on Energy and Mineral Resources.
- 2021-02-04Referred to the Subcommittee on Railroads, Pipelines, and Hazardous Materials.
- 2021-02-03Referred to the Subcommittee on Energy.
- 2021-02-02Referred to the Committee on Transportation and Infrastructure, and in addition to the Committees on Energy and Commerce, and Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
- 2021-02-02Referred to the Committee on Transportation and Infrastructure, and in addition to the Committees on Energy and Commerce, and Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
- 2021-02-02Referred to the Committee on Transportation and Infrastructure, and in addition to the Committees on Energy and Commerce, and Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
- 2021-02-02Introduced in House
- 2021-02-02Introduced in House
Subjects
- Canada
- Energy storage, supplies, demand
- Licensing and registrations
- Montana
- Oil and gas
- Pipelines
- Presidents and presidential powers, Vice Presidents
Sourced from Congress.gov (public domain).
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.