Air Plan Approval; Oklahoma; Update to Materials Incorporated by Reference
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Oklahoma State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by the State of Oklahoma and approved by the EPA. This update affects the materials that are available for public inspection at the EPA Regional Office and the National Archives and Records Administration.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 223 (Friday, November 20, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 223 (Friday, November 20, 2026)]
[Rules and Regulations]
[Pages 75208-75219]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-23690]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R06-OAR-2026-8317; FRL-13641-01-R6]
Air Plan Approval; Oklahoma; Update to Materials Incorporated by
Reference
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; administrative change.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is updating the
materials that are incorporated by reference (IBR) into the Oklahoma
State Implementation Plan (SIP). The regulations affected by this
update have been previously submitted by the State of Oklahoma and
approved by the EPA. This update affects the materials that are
available for public inspection at the EPA Regional Office and the
National Archives and Records Administration.
DATES: This rule is effective on November 20, 2026.
ADDRESSES: The SIP materials for which incorporation by reference into
40 Code of Federal Regulations (CFR) part 52 is finalized through this
action are available for inspection at the following locations:
Environmental Protection Agency, Region 6, 1201 Elm Street, Suite 500,
Dallas, TX 75202; and on the <a href="https://www.regulations.gov">https://www.regulations.gov</a> website at
Docket ID: EPA-R06-OAR-2026-8317.
FOR FURTHER INFORMATION CONTACT: Adina Wiley, EPA Region 6 Office, Air
Permits Section; telephone number: (214) 665-2115; email address:
<a href="/cdn-cgi/l/email-protection#a8dfc1c4cdd186c9ccc1c6c9e8cdd8c986cfc7de"><span class="__cf_email__" data-cfemail="16617f7a736f3877727f78775673667738717960">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION: Throughout this document ``we,'' ``us,'' and
``our'' means the EPA. We use multiple abbreviations and terms in this
final rule. While this list may not be exhaustive, for ease of reading
and for reference purposes, the EPA defines the following terms and
acronyms here:
APA--Administrative Procedures Act
CAA--Clean Air Act
CFR--Code of Federal Regulations
IBR--Incorporation by Reference
NAAQS--National Ambient Air Quality Standards
SIP--State Implementation Plan
Table of Contents
I. Executive Summary
A. What action is the EPA taking?
B. What is the legal authority and what are the requirements?
II. Background
III. Incorporation by Reference
IV. Statutory and Executive Order Reviews
I. Executive Summary
A. What action is the EPA taking?
In this action, the EPA is providing notification of an update to
the materials incorporated by reference into the Oklahoma SIP as of
August 31, 2026, and identified in 40 CFR 52.1920(c) and 40 CFR
52.1920(d). This update includes SIP materials submitted by Oklahoma
and approved by the EPA since the August 2, 2000, SIP Compilation.\1\
---------------------------------------------------------------------------
\1\ 65 FR 47326 (Aug. 2, 2000).
---------------------------------------------------------------------------
B. What is the legal authority and what are the requirements?
The EPA has determined that this action falls under the ``good
cause'' exemption in section 553(b)(3)(B) of the Administrative
Procedure Act (APA) which, upon finding ``good cause,'' authorizes
agencies to dispense with public participation and APA section
553(d)(3) which allows an agency to make an action effective
immediately (thereby avoiding the 30-day delayed effective date
otherwise provided for in the APA). This administrative action simply
codifies provisions which are already in effect as a matter of law in
Federal and approved State programs, makes corrections and clarifying
changes to the tables in the CFR, and makes ministerial changes to the
prefatory heading to the tables in the CFR. Under section 553 of the
APA, an agency may find good cause where procedures are
``impracticable, unnecessary, or contrary to the public interest.''
Public comment for this administrative action is ``unnecessary'' and
``contrary to the public interest'' since the codification (and
corrections) only reflect existing law. Immediate notice of this action
in the Federal
[[Page 75209]]
Register benefits the public by providing the public notification of
the updated Oklahoma SIP Compilation and notification of corrections to
the Oklahoma ``Identification of Plan'' portion of the CFR. Further,
pursuant to APA section 553(d)(3), making this action immediately
effective benefits the public by immediately updating both the SIP
Compilation and the CFR ``Identification of plan'' section (which
includes table entry corrections).
II. Background
Each State has a SIP containing the control measures and strategies
used to attain and maintain the national ambient air quality standards
(NAAQS) and meet other Clean Air Act requirements. The SIP is
extensive, containing such elements as air pollution control
regulations, emission inventories, monitoring networks, attainment
demonstrations, and enforcement mechanisms.
Each State must formally adopt the control measures and strategies
in the SIP after the public has had an opportunity to comment on them
and then submit the proposed SIP revisions to the EPA. Once these
control measures and strategies are approved by the EPA, and after
notice and comment, they are incorporated into the federally approved
SIP and are identified in part 52, ``Approval and Promulgation of
Implementation Plans,'' of title 40 of the Code of Federal Regulations
(40 CFR part 52). The full text of the State regulation approved by the
EPA is not reproduced in its entirety in 40 CFR part 52 but is
``incorporated by reference.'' This means that the EPA has approved a
given State provision or specified changes to the given provision with
a specific effective date. The public is referred to the location of
the full text version should they want to know which measures are
contained in a given SIP. The information provided allows the EPA and
the public to monitor the extent to which a State implements a SIP and
to take enforcement action for violations of the SIP.
The SIP is a living document which the State can revise as
necessary to address the unique air pollution problems in the State.
Therefore, the EPA from time to time must take action on proposed
revisions containing new or revised State regulations. A submission
from a State can revise one or more rules in their entirety, or
portions of rules. The State indicates the changes in the submission
(such as by using redline/strikethrough text) and the EPA then takes
action on the requested changes. The EPA establishes a docket for its
actions using a unique Docket Identification Number, which is listed in
each action. These dockets and the complete submission are available
for viewing on <a href="https://www.regulations.gov">https://www.regulations.gov</a>.
On May 22, 1997 (62 FR 27968), the EPA revised the procedures for
incorporating by reference, into the CFR, materials approved by the EPA
into each SIP. These changes revised the format for the identification
of the SIP in 40 CFR part 52, streamlined the mechanisms for announcing
the EPA approval of revisions to a SIP, and streamlined the mechanisms
for the EPA's updating of the IBR information contained for each SIP in
40 CFR part 52. The revised procedures also called for the EPA to
maintain ``SIP Compilations'' that contain the federally approved
regulations and source specific permits submitted by each State agency.
The EPA generally updates these SIP Compilations every few years.
Under the revised procedures, the EPA must periodically publish an
informational document in the rules section of the Federal Register
notifying the public that updates have been made to a SIP Compilation
for a particular State. The EPA began applying the 1997 revised
procedures to the Oklahoma SIP on August 2, 2000 (65 FR 47326) and is
providing this notification in accordance with such procedures.
III. Incorporation by Reference
In this rule, the EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, the EPA is finalizing the incorporation by reference of
previously EPA-approved regulations promulgated by Oklahoma as well as
source-specific requirements and federally effective prior to August
31, 2026. The EPA has made, and will continue to make, these materials
generally available through <a href="https://www.regulations.gov">https://www.regulations.gov</a> and at the EPA
Region 6 Office (please contact the person identified in the FOR
FURTHER INFORMATION CONTACT section of this preamble for more
information).
IV. Statutory and Executive Order Reviews
Under the Clean Air Act, the Administrator is required to approve a
SIP submission that complies with the provisions of the Act and
applicable Federal regulations (42 U.S.C. 7410(k); 40 CFR 52.02(a)).
Thus, in reviewing SIP submissions, the EPA's role is to approve State
choices, provided that they meet the criteria of the Clean Air Act.
Accordingly, this action merely approves State law as meeting Federal
requirements and does not impose additional requirements beyond those
imposed by State law. For that reason, this action:
<bullet> Is not a significant regulatory action subject to review
by the Office of Management and Budget under Executive Order 12866 (58
FR 51735, October 4, 1993);
<bullet> Is not an Executive Order 14192 (90 FR 9065, February 6,
2025) regulatory action because this action is not significant under
Executive Order 12866;
<bullet> Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
<bullet> Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
<bullet> Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
<bullet> Does not have federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
<bullet> Is not subject to Executive Order 13045 (62 FR 19885,
April 23, 1997) because it approves a State program;
<bullet> Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001); and
<bullet> Is not subject to requirements of section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the Clean Air Act.
In addition, the SIP is not approved to apply on any Indian
reservation land or in any other area where the EPA or an Indian Tribe
has demonstrated that a Tribe has jurisdiction. In those areas of
Indian country, the rule does not have Tribal implications and will not
impose substantial direct costs on Tribal governments or preempt Tribal
law as specified by Executive Order 13175 (65 FR 67249, November 9,
2000).
This action is subject to the Congressional Review Act, and the EPA
will submit a rule report to each House of the Congress and to the
Comptroller General of the United States. This action is not a ``major
rule'' as defined by 5 U.S.C. 804(2).
The EPA also believes that the provisions of section 307(b)(1) of
the CAA pertaining to petitions for judicial review are not applicable
to this action. This is because prior EPA rulemaking actions for each
individual component of the Oklahoma SIP Compilation
[[Page 75210]]
previously afforded interested parties the opportunity to file a
petition for judicial review in the United States Court of Appeals for
the appropriate circuit within 60 days of such rulemaking action. Thus,
the EPA believes judicial review of this action under CAA section
307(b)(1) is not available.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen
dioxide, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: November 9, 2026.
Walter Mason,
Regional Administrator, Region 6.
For the reasons stated in the preamble, the Environmental
Protection Agency amends 40 CFR part 52 as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart LL--Oklahoma
0
2. Amend Sec. 52.1920 by revising and republishing paragraphs (b)
through (d) to read as follows:
Sec. 52.1920 Identification of plan.
* * * * *
(b) Incorporation by reference. (1) Material listed in paragraphs
(c) and (d) of this section with an EPA approval date prior to August
31, 2026, was approved for incorporation by reference by the Director
of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR
part 51. Material is incorporated as it exists on the date of the
approval, and notice of any change in the material will be published in
the Federal Register. Entries in paragraphs (c) and (d) of this section
with EPA approval dates after August 31, 2026, will be incorporated by
reference in the next update to the SIP compilation.
(2) EPA Region 6 certifies that the rules/regulations provided by
the EPA in the SIP compilation at the addresses in paragraph (b)(3) of
this section are an exact duplicate of the officially promulgated State
rules/regulations that have been approved as part of the State
Implementation Plan as of the dates referenced in paragraph (b)(1) of
this section.
(3) Copies of the materials incorporated by reference may be
inspected at the Environmental Protection Agency, Region 6 Office at
1201 Elm Street, Suite 500, Dallas, Texas 75270. If you wish to obtain
material from the EPA Regional Office, please call (214) 665-7346. You
may inspect the material with an EPA approval date prior to August 31,
2026, for Oklahoma at the National Archives and Records Administration
(NARA). For information on the availability of this material at NARA
email <a href="/cdn-cgi/l/email-protection#bcdad9d8ced9db92d0d9dbddd0fcd2ddcedd92dbd3ca"><span class="__cf_email__" data-cfemail="523437362037357c3e3735333e123c3320337c353d24">[email protected]</span></a> or go to <a href="https://www.archives.gov/federal-register/cfr/ibr-locations">https://www.archives.gov/federal-register/cfr/ibr-locations</a>.
(c) EPA approved regulations.
EPA Approved Regulations in the Oklahoma SIP
----------------------------------------------------------------------------------------------------------------
State
State citation Title/subject effective date EPA approval date Explanation
----------------------------------------------------------------------------------------------------------------
OKLAHOMA ADMINISTRATIVE CODE, TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY
----------------------------------------------------------------------------------------------------------------
CHAPTER 4 (OAC 252:4). RULES OF PRACTICE AND PROCEDURE
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 1. GENERAL PROVISIONS
----------------------------------------------------------------------------------------------------------------
252:4-1-1.................... Purpose and authority 06/11/2001 04/10/2020, 85 FR ....................
20178.
252:4-1-2.................... Definitions.......... 09/15/2016 04/10/2020, 85 FR ....................
20178.
252:4-1-3.................... Organization......... 09/15/2016 04/10/2020, 85 FR ....................
20178.
252:4-1-4.................... Office location and 06/11/2001 04/10/2020, 85 FR ....................
hours; 20178.
communications.
252:4-1-5.................... Availability of a 07/01/2013 04/10/2020, 85 FR ....................
record. 20178.
252:4-1-6.................... Administrative fees.. 06/15/2005 04/10/2020, 85 FR ....................
20178.
252:4-1-7.................... Fee credits for 06/11/2001 04/10/2020, 85 FR ....................
regulatory fees. 20178.
252:4-1-8.................... Board and councils... 06/11/2001 04/10/2020, 85 FR ....................
20178.
252:4-1-9.................... Severability......... 06/11/2001 04/10/2020, 85 FR ....................
20178.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 3. MEETINGS AND PUBLIC FORUMS
----------------------------------------------------------------------------------------------------------------
252:4-3-1.................... Meetings............. 06/15/2007 04/10/2020, 85 FR ....................
20178.
252:4-3-2.................... Public forums........ 06/11/2001 12/29/2008, 73 FR ....................
79400.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 5. RULEMAKING
----------------------------------------------------------------------------------------------------------------
252:4-5-1.................... Adoption and 06/11/2001 12/29/2008, 73 FR ....................
revocation. 79400.
252:4-5-2.................... Rule development..... 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-5-3.................... Petitions for 06/11/2001 12/29/2008, 73 FR ....................
rulemaking. 79400.
252:4-5-4.................... Notice of permanent 06/11/2001 12/29/2008, 73 FR ....................
rulemaking. 79400.
252:4-5-5.................... Rulemaking hearings.. 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-5-6.................... Council actions...... 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-5-7.................... Presentation to Board 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-5-8.................... Board actions........ 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-5-9.................... Rulemaking record.... 06/11/2001 12/29/2008, 73 FR ....................
79400.
----------------------------------------------------------------------------------------------------------------
[[Page 75211]]
SUBCHAPTER 7. ENVIRONMENTAL PERMIT PROCESS
----------------------------------------------------------------------------------------------------------------
PART 1. THE PROCESS
----------------------------------------------------------------------------------------------------------------
252:4-7-1.................... Authority............ 06/11/2001 07/02/2026, 91 FR ....................
40409.
252:4-7-2.................... Preamble............. 06/11/2001 07/02/2026, 91 FR ....................
40409.
252:4-7-3.................... Compliance........... 06/11/2001 07/02/2026, 91 FR ....................
40409.
252:4-7-4.................... Filing an application 06/11/2001 07/02/2026, 91 FR ....................
40409.
252:4-7-5.................... Fees and fee refunds. 09/15/2017 07/02/2026, 91 FR ....................
40409.
252:4-7-6.................... Receipt of 06/11/2001 07/02/2026, 91 FR ....................
applications. 40409.
252:4-7-7.................... Administrative 06/11/2001 07/02/2026, 91 FR ....................
completeness review. 40409.
252:4-7-8.................... Technical review..... 06/11/2001 07/02/2026, 91 FR ....................
40409.
252:4-7-9.................... When review times 06/11/2001 07/02/2026, 91 FR ....................
stop. 40409.
252:4-7-10................... Supplemental time.... 06/11/2001 07/02/2026, 91 FR ....................
40409.
252:4-7-11................... Extensions........... 06/11/2001 07/02/2026, 91 FR ....................
40409.
252:4-7-12................... Failure to meet 06/11/2001 07/02/2026, 91 FR ....................
deadline. 40409.
252:4-7-13................... Notices.............. 09/15/2021 07/02/2026, 91 FR The SIP does NOT
40409. include (e) or (f).
252:4-7-14................... Withdrawing 06/11/2001 07/02/2026, 91 FR ....................
applications. 40409.
252:4-7-15................... Permit issuance or 07/01/2013 07/02/2026, 91 FR ....................
denial. 40409.
252:4-7-16................... Tier II and III 06/11/2001 07/02/2026, 91 FR ....................
modifications. 40409.
252:4-7-17................... Permit decision- 06/11/2001 07/02/2026, 91 FR ....................
making authority. 40409.
252:4-7-18................... Pre-issuance permit 07/01/2013 07/02/2026, 91 FR ....................
review and 40409.
correction.
252:4-7-19................... Consolidation of 06/11/2001 07/02/2026, 91 FR ....................
permitting process. 40409.
252:4-7-20................... Agency review of 07/01/2013 04/10/2020, 85 FR ....................
final permit 20178.
decisions.
----------------------------------------------------------------------------------------------------------------
PART 3. AIR QUALITY DIVISION TIERS AND TIME LINES
----------------------------------------------------------------------------------------------------------------
252:4-7-31................... Air quality time 06/11/2001 07/02/2026, 91 FR ....................
lines. 40409.
252:4-7-32................... Air quality 09/15/2021 07/02/2026, 91 FR ....................
applications--Tier I. 40409.
252:4-7-33................... Air quality 09/15/2021 07/02/2026, 91 FR SIP does NOT include
applications--Tier 40409. (c)(4).
II.
252:4-7-34................... Air quality 06/11/2001 11/26/2010, 75 FR ....................
applications--Tier 72695.
III.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 9. ADMINISTRATIVE PROCEEDINGS
----------------------------------------------------------------------------------------------------------------
PART 1. ENFORCEMENT
----------------------------------------------------------------------------------------------------------------
252:4-9-1.................... Notice of Violation 06/11/2001 12/29/2008, 73 FR ....................
(``NOV''). 79400.
252:4-9-2.................... Administrative 06/11/2001 12/29/2008, 73 FR ....................
compliance orders. 79400.
252:4-9-3.................... Determining penalty.. 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-4.................... Assessment orders.... 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-5.................... Considerations for 06/11/2001 12/29/2008, 73 FR ....................
self-reporting of 79400.
noncompliance.
----------------------------------------------------------------------------------------------------------------
PART 3. INDIVIDUAL PROCEEDINGS
----------------------------------------------------------------------------------------------------------------
252:4-9-31................... Individual 06/11/2001 12/29/2008, 73 FR ....................
proceedings filed by 79400.
DEQ.
252:4-9-32................... Individual 07/01/2013 04/10/2020, 85 FR ....................
proceedings filed by 20178.
others.
252:4-9-33................... Scheduling and notice 06/11/2001 12/29/2008, 73 FR ....................
of hearings. 79400.
252:4-9-34................... Administrative Law 06/11/2001 12/29/2008, 73 FR ....................
Judges and Clerks. 79400.
252:4-9-35................... Service.............. 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-36................... Responsive pleading.. 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-37................... Prehearing 06/11/2001 12/29/2008, 73 FR ....................
conferences. 79400.
252:4-9-38................... Discovery............ 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-39................... Subpoenas............ 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-40................... Record............... 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-41................... Motions.............. 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-42................... Continuances......... 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-43................... Summary judgment..... 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-44................... Default.............. 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-45................... Withdrawal and 06/11/2001 12/29/2008, 73 FR ....................
dismissal. 79400.
252:4-9-46................... Orders in 06/11/2001 12/29/2008, 73 FR ....................
administrative 79400.
hearings.
----------------------------------------------------------------------------------------------------------------
[[Page 75212]]
PART 5. AIR QUALITY ADVISORY COUNCIL HEARINGS
----------------------------------------------------------------------------------------------------------------
252:4-9-51................... In general........... 06/01/2004 04/10/2020, 85 FR ....................
20178.
252:4-9-52................... Individual 06/01/2004 04/10/2020, 85 FR ....................
proceedings. 20178.
252:4-9-53................... Variance............. 06/11/2001 12/29/2008, 73 FR ....................
79400.
252:4-9-54................... State implementation 06/11/2001 12/29/2008, 73 FR NOT in SIP: in the
plan hearings. 79400. first sentence, the
phrase ``under
252:100-11'' and
the last sentence
which begins with
``Additional
requirements for a
SIP hearing * *
*.''
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 17. ELECTRONIC REPORTING
----------------------------------------------------------------------------------------------------------------
252:4-17-1................... Purpose, authority 06/15/2007 04/10/2020, 85 FR ....................
and applicability. 20178.
252:4-17-2................... Definitions.......... 09/15/2016 04/10/2020, 85 FR ....................
20178.
252:4-17-3................... Use of electronic 06/15/2007 04/10/2020, 85 FR ....................
document receiving 20178.
system.
252:4-17-4................... Electronic signature 09/15/2016 04/10/2020, 85 FR ....................
agreement. 20178.
252:4-17-5................... Valid electronic 06/15/2007 04/10/2020, 85 FR ....................
signature. 20178.
252:4-17-6................... Effect of electronic 06/15/2007 04/10/2020, 85 FR ....................
signature. 20178.
252:4-17-7................... Enforcement.......... 06/15/2007 04/10/2020, 85 FR ....................
20178.
----------------------------------------------------------------------------------------------------------------
APPENDICES FOR OAC 252: CHAPTER 4
----------------------------------------------------------------------------------------------------------------
252:4, Appendix A............ Petition for 06/11/2001 12/29/2008, 73 FR ....................
Rulemaking Before 79400.
the Environmental
Quality Board.
252:4, Appendix B............ Petition for 06/11/2001 12/29/2008, 73 FR ....................
Declaratory Ruling. 79400.
252:4, Appendix C............ Permitting Process 09/15/2021 07/02/2026, 91 FR ....................
Summary. 40409.
252:4, Appendix D............ Style of the Case in 06/11/2001 12/29/2008, 73 FR ....................
an Individual 79400.
Proceeding.
----------------------------------------------------------------------------------------------------------------
CHAPTER 100 (OAC 252:100). AIR POLLUTION CONTROL
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 1. GENERAL PROVISIONS
----------------------------------------------------------------------------------------------------------------
252:100-1-1.................. Purpose.............. 06/12/2003 09/28/2016, 81 FR ....................
66535.
252:100-1-2.................. Statutory definitions 09/15/2020 07/02/2026, 91 FR ....................
40409.
252:100-1-3.................. Definitions.......... 09/15/2022 07/02/2026, 91 FR ....................
40409.
252:100-1-4.................. Units, abbreviations 09/15/2021 07/02/2026, 91 FR ....................
and acronyms. 40409.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 2: INCORPORATION BY REFERENCE
----------------------------------------------------------------------------------------------------------------
252:100-2-1.................. Purpose.............. 07/01/2012 09/28/2016, 81 FR ....................
66535.
252:100-2-3.................. Incorporation by 09/16/2024 07/02/2026, 91 FR ....................
reference. 40409.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 3. AIR QUALITY STANDARDS AND INCREMENTS
----------------------------------------------------------------------------------------------------------------
252:100-3-1.................. Purpose.............. 05/26/1994 11/03/1999, 64 FR ....................
59629.
252:100-3-2.................. Primary standards.... 05/26/1994 11/03/1999, 64 FR ....................
59629.
252:100-3-3.................. Secondary standards.. 05/26/1994 11/03/1999, 64 FR ....................
59629.
252:100-3-4.................. Significant 07/01/2011 09/28/2016, 81 FR ....................
deterioration 66535.
increments.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 5: REGISTRATION, EMISSION INVENTORY AND ANNUAL OPERATING FEES
----------------------------------------------------------------------------------------------------------------
252:100-5-1.................. Purpose.............. 06/12/2000 04/10/2020, 85 FR ....................
20178.
252:100-5-1.1................ Definitions.......... 07/01/2009 07/02/2026, 91 FR ....................
40409.
252:100-5-2.................. Registration of 09/12/2014 08/30/2018, 83 FR ....................
potential sources of 44236.
air contaminants.
252:100-5-2.1................ Emission inventory... 09/15/2016 08/30/2018, 83 FR ....................
44236.
252:100-5-3.................. Confidentiality of 09/12/2014 08/30/2018, 83 FR ....................
proprietary 44236.
information.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 7. PERMITS FOR MINOR FACILITIES
----------------------------------------------------------------------------------------------------------------
PART 1. GENERAL PROVISIONS
----------------------------------------------------------------------------------------------------------------
252:100-7-1.................. Purpose.............. 06/25/1998 05/15/2017, 82 FR ....................
22281.
252:100-7-1.1................ Definitions.......... 09/15/2022 07/02/2026, 91 FR ....................
40409.
252:100-7-2.................. Requirement for 09/15/2022 07/02/2026, 91 FR ....................
permits for minor 40409.
facilities.
----------------------------------------------------------------------------------------------------------------
[[Page 75213]]
PART 3. CONSTRUCTION PERMITS
----------------------------------------------------------------------------------------------------------------
252:100-7-15................. Construction permit.. 09/15/2022 07/02/2026, 91 FR ....................
40409.
----------------------------------------------------------------------------------------------------------------
PART 4. OPERATING PERMITS
----------------------------------------------------------------------------------------------------------------
252:100-7-17................. Relocation permits 06/25/1998 05/15/2017, 82 FR ....................
for portable sources. 22281.
252:100-7-18................. Operating permit..... 09/15/2021 07/02/2026, 91 FR ....................
40409.
----------------------------------------------------------------------------------------------------------------
PART 9. PERMITS BY RULE
----------------------------------------------------------------------------------------------------------------
252:100-7-60................. Permit by rule....... 09/12/2014 07/02/2026, 91 FR ....................
40409.
252:100-7-60.1............... Cotton gins.......... 06/11/1999 05/15/2017, 82 FR ....................
22281.
252:100-7-60.2............... Grain elevators...... 06/11/1999 05/15/2017, 82 FR ....................
22281.
252:100-7-60.6............... Emergency engine 09/15/2016 07/02/2026, 91 FR ....................
facilities. 40409.
252:100-7-60.7............... Gasoline dispensing 09/15/2018 07/02/2026, 91 FR ....................
facilities and 40409.
gasoline dispensing
facilities with
emergency engines.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 8. PERMITS FOR PART 70 SOURCES
----------------------------------------------------------------------------------------------------------------
PART 1. GENERAL PROVISIONS
----------------------------------------------------------------------------------------------------------------
252:100-8-1.................. Purpose.............. 06/25/1998 11/26/2010, 75 FR ....................
72695.
252:100-8-1.1................ Definitions.......... 07/01/2008 07/02/2026, 91 FR ....................
40409.
252:100-8-1.2................ General information.. 06/25/1998 11/26/2010, 75 FR ....................
72695.
252:100-8-1.3................ Duty to comply....... 06/25/1998 11/26/2010, 75 FR ....................
72695.
252:100-8-1.4................ Cancellation or 06/01/2001 11/26/2010, 75 FR ....................
extension of a 72695.
construction permit
or authorization
under a general
construction permit.
252:100-8-1.5................ Stack height 06/01/2001 11/26/2010, 75 FR ....................
limitations. 72695.
----------------------------------------------------------------------------------------------------------------
PART 5. PERMITS FOR PART 70 SOURCES
----------------------------------------------------------------------------------------------------------------
252:100-8-2.................. Definitions.......... 09/15/2021 07/02/2026, 91 FR NOT in SIP:
40409. ``affected
source,''
``affected unit,''
paragraph (E) of
``applicable
requirement,''
``designated
representative,''
``small unit,'' and
``unit''.
252:100-8-3.................. Applicability........ 06/01/2001 11/26/2010, 75 FR ....................
72695.
252:100-8-4.................. Requirements for 09/15/2022 07/02/2026, 91 FR NOT in SIP: OAC
construction and 40409. 252:100-8-4(b)(9).
operating permits.
252:100-8-5.................. Permit applications.. 09/15/2021 07/02/2026, 91 FR ....................
40409.
252:100-8-6.................. Permit content....... 06/15/2005 07/02/2026, 91 FR NOT in SIP: OAC
40409. 252:100-8-6(a)(5).
252:100-8-6.1................ General permits...... 06/15/2005 07/02/2026, 91 FR ....................
40409.
252:100-8-6.2................ Temporary sources.... 06/25/1998 11/26/2010, 75 FR ....................
72695.
252:100-8-7.................. Permit issuance...... 06/15/2005 07/02/2026, 91 FR ....................
40409.
252:100-8-7.1................ Permit renewal and 06/25/1998 11/26/2010, 75 FR ....................
expiration. 72695.
252:100-8-7.2................ Administrative permit 09/15/2021 07/02/2026, 91 FR ....................
amendments and 40409.
permit modifications.
252:100-8-7.3................ Reopening of 06/25/1998 11/26/2010, 75 FR ....................
operating permits 72695.
for cause.
252:100-8-7.4................ Revocations of 06/25/1998 11/26/2010, 75 FR ....................
operating permits. 72695.
252:100-8-7.5................ Judicial review...... 06/25/1998 11/26/2010, 75 FR ....................
72695.
252:100-8-8.................. Permit review by EPA 09/15/2021 07/02/2026, 91 FR ....................
and affected states. 40409.
----------------------------------------------------------------------------------------------------------------
PART 7. PREVENTION OF SIGNIFICANT DETERIORATION (PSD) REQUIREMENTS FOR ATTAINMENT AREAS
----------------------------------------------------------------------------------------------------------------
252:100-8-30................. Applicability........ 07/01/2009 09/28/2016, 81 FR ....................
66535.
252:100-8-31................. Definitions.......... 09/15/2017 04/10/2020, 85 FR ....................
20178.
252:100-8-32.1............... Ambient air 06/15/2006 09/28/2016, 81 FR ....................
increments and 66535.
ceilings.
252:100-8-32.2............... Exclusion from 06/15/2006 09/28/2016, 81 FR ....................
increment 66535.
consumption.
252:100-8-32.3............... Stack heights........ 06/15/2006 09/28/2016, 81 FR ....................
66535.
252:100-8-33................. Exemptions........... 09/15/2017 04/10/2020, 85 FR ....................
20178.
252:100-8-34................. Control technology 06/15/2006 09/28/2016, 81 FR ....................
review. 66535.
252:100-8-35................. Air quality impact 9/15/2018 04/10/2020, 85 FR ....................
evaluation. 20178.
[[Page 75214]]
252:100-8-35.1............... Source information... 06/15/2006 09/28/2016, 81 FR ....................
66535.
252:100-8-35.2............... Additional impact 06/15/2006 09/28/2016, 81 FR ....................
analyses. 66535.
252:100-8-36................. Source impacting 06/15/2006 09/28/2016, 81 FR ....................
Class I areas. 66535.
252:100-8-36.1............... Public participation. 09/15/2022 07/02/2026, 91 FR ....................
40409.
252:100-8-36.2............... Source obligation.... 09/15/2022 07/02/2026, 91 FR ....................
40409.
252:100-8-37................. Innovative control 07/01/2009 09/28/2016, 81 FR ....................
technology. 66535.
252:100-8-38................. Actuals PALs......... 07/01/2009 09/28/2016, 81 FR ....................
66535.
252:100-8-39................. Severability......... 06/15/2006 09/28/2016, 81 FR ....................
66535.
----------------------------------------------------------------------------------------------------------------
PART 9. MAJOR SOURCES AFFECTING NONATTAINMENT AREAS
----------------------------------------------------------------------------------------------------------------
252:100-8-50................. Applicability........ 07/01/2009 09/28/2016, 81 FR ....................
66535.
252:100-8-50.1............... Incorporation by 07/01/2011 09/28/2016, 81 FR ....................
reference. 66535.
252:100-8-51................. Definitions.......... 07/01/2011 09/28/2016, 81 FR ....................
66535.
252:100-8-51.1............... Emission reductions 09/15/2017 04/10/2020, 85 FR ....................
and offsets. 20178.
252:100-8-52................. Applicability 07/01/2011 09/28/2016, 81 FR ....................
determination for 66535.
sources in
attainment areas
causing or
contributing to
NAAQS violations.
252:100-8-53................. Exemptions........... 07/01/2009 09/28/2016, 81 FR ....................
66535.
252:100-8-54................. Requirements for 06/15/2006 09/28/2016, 81 FR ....................
sources located in 66535.
nonattainment areas.
252:100-8-54.1............... Ozone and PM-10 07/01/2009 09/28/2016, 81 FR ....................
precursors. 66535.
252:100-8-55................. Source obligation.... 07/01/2009 09/28/2016, 81 FR ....................
66535.
252:100-8-56................. Actuals PAL.......... 07/01/2009 09/28/2016, 81 FR ....................
66535.
252:100-8-57................. Severability......... 06/15/2006 09/28/2016, 81 FR ....................
66535.
----------------------------------------------------------------------------------------------------------------
PART 11. VISIBILITY PROTECTION STANDARDS
----------------------------------------------------------------------------------------------------------------
252:100-8-70................. Applicability........ 06/15/2007 12/28/2011, 76 FR ....................
81728.
252:100-8-71................. Definitions.......... 06/15/2007 12/28/2011, 76 FR ....................
81728.
252:100-8-72................. Incorporation by 06/15/2007 12/28/2011, 76 FR ....................
reference. 81728.
252:100-8-73................. BART applicability... 06/15/2007 12/28/2011, 76 FR ....................
81728.
252:100-8-74................. Exemption from BART 06/15/2007 12/28/2011, 76 FR ....................
requirements. 81728.
252:100-8-75................. Visibility standards 06/15/2007 12/28/2011, 76 FR ....................
for existing 81728.
stationary
facilities.
252:100-8-76................. Permit requirements.. 06/15/2007 12/28/2011, 76 FR ....................
81728.
252:100-8-77................. Cap and/or trade 06/15/2007 12/28/2011, 76 FR ....................
program. 81728.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 13. OPEN BURNING
----------------------------------------------------------------------------------------------------------------
252:100-13-1................. Purpose.............. 06/12/2000 12/29/2008, 73 FR ....................
79400.
252:100-13-2................. Definitions.......... 09/15/2020 04/25/2023, 88 FR ....................
24918.
252:100-13-5................. Open burning 09/15/2020 04/25/2023, 88 FR ....................
prohibited. 24918.
252:100-13-7................. Allowed open burning. 09/15/2022 01/26/2026, 91 FR ....................
3046.
252:100-13-8................. Use of air curtain 09/15/2022 01/26/2026, 91 FR ....................
incinerators. 3046.
252:100-13-8.1............... Transported material. 09/15/2022 01/26/2026, 91 FR ....................
3046.
252:100-13-9................. General conditions 09/15/2020 04/25/2023, 88 FR ....................
and requirements for 24918.
allowed open burning.
252:100-13-10................ Disaster relief...... 06/12/2000 12/29/2008, 73 FR ....................
79400.
252:100-13-11................ Responsibility for 06/12/2000 12/29/2008, 73 FR ....................
consequences of open 79400.
burning.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 17. INCINERATORS
----------------------------------------------------------------------------------------------------------------
PART 1. GENERAL PROVISIONS
----------------------------------------------------------------------------------------------------------------
252:100-17-1................. Purpose.............. 07/11/2010 11/03/2015, 80 FR ....................
67647.
252:100-17-1.1............... Reference to 40 CFR.. 07/11/2010 11/03/2015, 80 FR ....................
67647.
252:100-17-1.3............... Incinerators and fuel- 07/11/2010 11/03/2015, 80 FR ....................
burning equipment or 67647.
units.
----------------------------------------------------------------------------------------------------------------
PART 3. GENERAL PURPOSE INCINERATORS
----------------------------------------------------------------------------------------------------------------
252:100-17-2................. Applicability........ 09/12/2014 08/01/2019, 84 FR ....................
37579.
252:100-17-2.1............... Exemptions........... 07/11/2010 11/03/2015, 80 FR ....................
67647.
252:100-17-2.2............... Definitions.......... 07/11/2010 11/03/2015, 80 FR ....................
67647.
252:100-17-3................. Opacity.............. 06/25/1998 12/29/2008, 73 FR ....................
79400.
252:100-17-4................. Particulate matter... 07/11/2010 11/03/2015, 80 FR ....................
67647.
252:100-17-5................. Incinerator design 07/11/2010 11/03/2015, 80 FR ....................
and operation 67647.
requirements.
[[Page 75215]]
252:100-17-5.1............... Alternative 07/11/2010 11/03/2015, 80 FR ....................
incinerator design 67647.
requirements.
252:100-17-7................. Test methods......... 07/11/2010 11/03/2015, 80 FR ....................
67647.
----------------------------------------------------------------------------------------------------------------
PART 4. BIOMEDICAL WASTE INCINERATORS
----------------------------------------------------------------------------------------------------------------
252:100-17-8................. Applicability........ 07/01/2011 11/03/2015, 80 FR ....................
67647.
252:100-17-9................. Definitions.......... 07/01/2011 11/03/2015, 80 FR ....................
67647.
252:100-17-10................ Design and operation. 07/01/2011 11/03/2015, 80 FR ....................
67647.
252:100-17-11................ Emission limits...... 07/01/2011 11/03/2015, 80 FR ....................
67647.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 19. CONTROL OF EMISSION OF PARTICULATE MATTER
----------------------------------------------------------------------------------------------------------------
252:100-19-1................. Purpose.............. 06/01/2000 12/29/2008, 73 FR ....................
79400.
252:100-19-1.1............... Definitions.......... 07/01/2009 11/03/2015, 80 FR ....................
67647.
252:100-19-4................. Allowable particulate 06/01/2000 12/29/2008, 73 FR ....................
matter emission 79400.
rates from fuel-
burning units.
252:100-19-10................ Allowable particulate 06/01/2000 12/29/2008, 73 FR ....................
matter emission 79400.
rates from
indirectly fired
wood fuel-burning
units.
252:100-19-11................ Allowable particulate 07/01/2009 11/03/2015, 80 FR ....................
matter emission 67647.
rates from combined
wood fuel and fossil
fuel fired steam
generating units.
252:100-19-12................ Allowable particulate 06/01/2000 12/29/2008, 73 FR ....................
matter emission 79400.
rates from directly
fired fuel-burning
units and industrial
processes.
252:100-19-13................ Permit by rule....... 06/01/2000 12/29/2008, 73 FR ....................
79400.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 23. CONTROL OF EMISSIONS FROM COTTON GINS
----------------------------------------------------------------------------------------------------------------
252:100-23-1................. Purpose.............. 06/01/1999 12/29/2008, 73 FR ....................
79400.
252:100-23-2................. Definitions.......... 06/01/1999 12/29/2008, 73 FR ....................
79400.
252:100-23-3................. Applicability, 09/16/2024 07/02/2026, 91 FR NOT in SIP:
general requirements. 40409. paragraph (b)(2).
252:100-23-4................. Visible emissions 06/01/1999 12/29/2008, 73 FR ....................
(opacity) and 79400.
particulates.
252:100-23-5................. Emission control 06/01/1999 12/29/2008, 73 FR ....................
equipment. 79400.
252:100-23-6................. Fugitive dust 06/01/1999 12/29/2008, 73 FR ....................
controls. 79400.
252:100-23-7................. Permit by rule....... 06/01/1999 12/29/2008, 73 FR ....................
79400.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 24. PARTICULATE MATTER EMISSIONS FROM GRAIN, FEED OR SEED OPERATIONS
----------------------------------------------------------------------------------------------------------------
252:100-24-1................. Purpose.............. 06/01/1999 12/29/2008, 73 FR ....................
79400.
252:100-24-2................. Definitions.......... 06/01/1999 12/29/2008, 73 FR ....................
79400.
252:100-24-3................. Applicability, 06/01/2000 12/29/2008, 73 FR NOT in SIP:
general requirements. 79400. paragraph (b)(2).
252:100-24-4................. Visible emissions 06/01/1999 12/29/2008, 73 FR ....................
(opacity) limit. 79400.
252:100-24-5................. Certification........ 06/01/1999 12/29/2008, 73 FR ....................
79400.
252:100-24-6................. Fugitive dust 06/01/1999 12/29/2008, 73 FR ....................
controls. 79400.
252:100-24-7................. Permit by rule....... 06/01/1999 12/29/2008, 73 FR ....................
79400.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 25. VISIBLE EMISSIONS AND PARTICULATES
----------------------------------------------------------------------------------------------------------------
252:100-25-1................. Purpose.............. 06/01/1999 12/29/2008, 73 FR ....................
79400.
252:100-25-2................. General prohibition.. 06/01/1999 12/29/2008, 73 FR ....................
79400.
252:100-25-2.1............... Definitions.......... 06/01/1999 12/29/2008, 73 FR ....................
79400.
252:100-25-3................. Opacity limit........ 07/01/2009 11/03/2015, 80 FR ....................
67647.
252:100-25-4................. Alternative for 06/01/1999 12/29/2008, 73 FR ....................
particulates. 79400.
252:100-25-5................. Continuous emission 07/01/2013 08/01/2019, 84 FR ....................
monitoring for 37579.
opacity.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 29. CONTROL OF FUGITIVE DUST
----------------------------------------------------------------------------------------------------------------
252:100-29-1................. Purpose.............. 05/26/1994 11/03/1999, 64 FR ....................
59629.
252:100-29-2................. General provisions... 06/01/2001 12/29/2008, 73 FR ....................
79400.
252:100-29-3................. Precautions required 06/01/2001 12/29/2008, 73 FR ....................
in maintenance or 79400.
nonattainment areas.
252:100-29-4................. Exception for 05/26/1994 11/03/1999, 64 FR ....................
agricultural 59629.
purposes.
----------------------------------------------------------------------------------------------------------------
[[Page 75216]]
SUBCHAPTER 31. CONTROL OF EMISSION OF SULFUR COMPOUNDS
----------------------------------------------------------------------------------------------------------------
PART 1. GENERAL PROVISIONS
----------------------------------------------------------------------------------------------------------------
252:100-31-1................. Purpose.............. 07/01/2012 08/01/2019, 84 FR ....................
37579.
252:100-31-2................. Definitions.......... 07/01/2012 08/01/2019, 84 FR ....................
37579.
----------------------------------------------------------------------------------------------------------------
PART 2. AMBIENT AIR CONCENTRATION LIMITS OR IMPACTS FOR NEW AND EXISTING EQUIPMENT, SOURCES, OR FACILITIES
----------------------------------------------------------------------------------------------------------------
252:100-31-7................. Allowable hydrogen 07/01/2012 08/01/2019, 84 FR ....................
sulfide (H2S) 37579.
ambient air
concentrations for
new and existing
sources.
----------------------------------------------------------------------------------------------------------------
PART 3. EXISTING EQUIPMENT STANDARDS
----------------------------------------------------------------------------------------------------------------
252:100-31-13................ Requirements for 07/01/2012 08/01/2019, 84 FR ....................
existing sulfuric 37579.
acid plants.
252:100-31-15................ Requirements for 07/01/2012 08/01/2019, 84 FR ....................
existing kraft pulp 37579.
mills.
252:100-31-16................ Requirements for 07/01/2012 08/01/2019, 84 FR ....................
existing fossil fuel- 37579.
fired steam
generators.
----------------------------------------------------------------------------------------------------------------
Part 5. New Equipment Standards
----------------------------------------------------------------------------------------------------------------
252:100-31-25................ Requirements for new 07/01/2013 08/01/2019, 84 FR ....................
fuel-burning 37579.
equipment.
252:100-31-26................ Requirements for new 07/01/2012 08/01/2019, 84 FR ....................
petroleum and 37579.
natural gas
processes.
----------------------------------------------------------------------------------------------------------------
Subchapter 33. Control of Emission of Nitrogen Oxides
----------------------------------------------------------------------------------------------------------------
252:100-33-1................. Purpose.............. 05/26/1994 11/03/1999, 64 FR ....................
59629.
252:100-33-1.1............... Definitions.......... 06/01/2001 12/29/2008, 73 FR ....................
79400.
252:100-33-1.2............... Applicability........ 06/01/2001 12/29/2008, 73 FR ....................
79400.
252:100-33-2................. Emission limits...... 06/01/2001 12/29/2008, 73 FR ....................
79400.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 35. CONTROL OF EMISSION OF CARBON MONOXIDE
----------------------------------------------------------------------------------------------------------------
252:100-35-1................. Purpose.............. 09/16/2024 07/02/2026, 91 FR ....................
40409.
252:100-35-1.1............... Definitions.......... 06/01/2000 12/29/2008, 73 FR ....................
79400.
252:100-35-2................. Emission limits...... 06/01/2000 12/29/2008, 73 FR ....................
79400.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 37. CONTROL OF EMISSION OF VOLATILE ORGANIC COMPOUNDS (VOCS)
----------------------------------------------------------------------------------------------------------------
PART 1. GENERAL PROVISIONS
----------------------------------------------------------------------------------------------------------------
252:100-37-1................. Purpose.............. 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-37-2................. Definitions.......... 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-37-3................. Applicability and 06/11/1999 12/29/2008, 73 FR ....................
compliance. 79400.
252:100-37-4................. Exemptions........... 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-37-5................. Operation and 06/11/1999 12/29/2008, 73 FR ....................
maintenance. 79400.
----------------------------------------------------------------------------------------------------------------
PART 3. CONTROL OF VOCS IN STORAGE AND LOADING OPERATIONS
----------------------------------------------------------------------------------------------------------------
252:100-37-15................ Storage of VOCs...... 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-37-16................ Loading of VOCs...... 09/15/2022 12/28/2023, 88 FR ....................
89589.
----------------------------------------------------------------------------------------------------------------
PART 5. CONTROL OF VOCS IN COATING OPERATIONS
----------------------------------------------------------------------------------------------------------------
252:100-37-25................ Coating of parts and 06/11/1999 12/29/2008, 73 FR ....................
products. 79400.
252:100-37-26................ Clean up with VOCs... 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-37-27................ Control of emission 09/15/2020 04/25/2023, 88 FR ....................
of VOCs from 24918.
aerospace industries
coatings operations.
----------------------------------------------------------------------------------------------------------------
PART 7. CONTROL OF SPECIFIC PROCESSES
----------------------------------------------------------------------------------------------------------------
252:100-37-35................ Waste gas disposal... 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-37-36................ Fuel-burning and 06/11/1999 12/29/2008, 73 FR ....................
refuse-burning 79400.
equipment.
252:100-37-37................ Effluent water 06/11/1999 12/29/2008, 73 FR ....................
separators. 79400.
[[Page 75217]]
252:100-37-38................ Pumps and compressors 06/11/1999 12/29/2008, 73 FR ....................
79400.
----------------------------------------------------------------------------------------------------------------
PART 9. PERMIT BY RULE FOR VOC STORAGE AND LOADING FACILITIES
----------------------------------------------------------------------------------------------------------------
252:100-37-41................ Applicability........ 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-37-42................ Permit-by-rule 06/11/1999 12/29/2008, 73 FR ....................
requirements. 79400.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 39. EMISSION OF VOLATILE ORGANIC COMPOUNDS (VOCS) IN NONATTAINMENT AREAS AND FORMER NONATTAINMENT
AREAS
----------------------------------------------------------------------------------------------------------------
PART 1. GENERAL PROVISIONS
----------------------------------------------------------------------------------------------------------------
252:100-39-1................. Purpose.............. 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-39-2................. Definitions.......... 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-39-3................. General applicability 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-39-4................. Exemptions........... 09/15/2019 07/29/2022, 87 FR ....................
45654.
----------------------------------------------------------------------------------------------------------------
PART 3. PETROLEUM REFINERY OPERATIONS
----------------------------------------------------------------------------------------------------------------
252:100-39-15................ Petroleum refinery 06/11/1999 12/29/2008, 73 FR ....................
equipment leaks. 79400.
252:100-39-16................ Petroleum refinery 09/15/2019 7/29/2022, 87 FR ....................
process unit 45654.
turnaround.
252:100-39-17................ Petroleum refinery 06/11/1999 12/29/2008, 73 FR ....................
vacuum producing 79400.
system.
252:100-39-18................ Petroleum refinery 06/11/1999 12/29/2008, 73 FR ....................
effluent water 79400.
separators.
----------------------------------------------------------------------------------------------------------------
PART 5. PETROLEUM PROCESSING AND STORAGE
----------------------------------------------------------------------------------------------------------------
252:100-39-30................ Petroleum liquid 06/11/1999 12/29/2008, 73 FR ....................
storage in vessels 79400.
with external
floating roofs.
----------------------------------------------------------------------------------------------------------------
PART 7. SPECIFIC OPERATIONS
----------------------------------------------------------------------------------------------------------------
252:100-39-40................ Cutback asphalt 09/15/2019 07/29/2022, 87 FR ....................
(paving). 45654.
252:100-39-41................ Storage, loading and 09/15/2019 07/29/2022, 87 FR ....................
transport/delivery 45654.
of VOCs.
252:100-39-42................ Metal cleaning....... 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-39-43................ Graphic arts systems. 06/11/1999 12/29/2008, 73 FR ....................
79400.
252:100-39-44................ Manufacture of 06/11/1999 12/29/2008, 73 FR ....................
pneumatic rubber 79400.
tires.
252:100-39-45................ Petroleum (solvent) 09/15/2022 12/28/2023, 88 FR ....................
dry cleaning. 89589.
252:100-39-46................ Coating of parts and 06/11/1999 12/29/2008, 73 FR ....................
products. 79400.
252:100-39-47................ Control of VOC 09/15/2020 04/25/2023, 88 FR ....................
emissions from 24918.
aerospace industries
coatings operations.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 43. SAMPLING AND TESTING METHODS
----------------------------------------------------------------------------------------------------------------
PART 1. GENERAL PROVISIONS
----------------------------------------------------------------------------------------------------------------
252:100-43-1................. Purpose.............. 05/26/1994 11/03/1999, 64 FR ....................
59629.
252:100-43-2................. Test procedures...... 05/26/1994 11/03/1999, 64 FR ....................
59629.
252:100-43-3................. Conduct of tests..... 05/26/1994 11/03/1999, 64 FR ....................
59629.
----------------------------------------------------------------------------------------------------------------
PART 3. SPECIFIC METHODS
----------------------------------------------------------------------------------------------------------------
252:100-43-15................ Gasoline vapor leak 05/26/1994 11/03/1999, 64 FR ....................
detection procedure 59629.
by combustible gas
detector.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 45. MONITORING OF EMISSIONS
----------------------------------------------------------------------------------------------------------------
252:100-45-1................. Purpose.............. 05/26/1994 11/03/1999, 64 FR ....................
59629.
252:100-45-2................. Monitoring equipment 05/26/1994 11/03/1999, 64 FR ....................
required. 59629.
252:100-45-3................. Records required..... 05/26/1994 11/03/1999, 64 FR ....................
59629.
252:100-45-4................. Compliance 07/01/1995 12/29/2008, 73 FR ....................
certifications. 79400.
252:100-45-5................. Enforceability....... 07/01/1995 12/29/2008, 73 FR ....................
79400.
----------------------------------------------------------------------------------------------------------------
[[Page 75218]]
APPENDICES FOR OAC 252: CHAPTER 100
----------------------------------------------------------------------------------------------------------------
252:100, Appendix A.......... Allowable Particulate 07/01/2011 11/03/2015, 80 FR ....................
Matter Emission Rate 67647.
for Incinerators.
252:100, Appendix C.......... Allowable Particulate 07/01/2009 11/03/2015, 80 FR ....................
Matter Emission 67647.
Rates for Indirectly
Fired Fuel-Burning
Units.
252:100, Appendix D.......... Allowable Particulate 07/01/2009 11/03/2015, 80 FR ....................
Matter Emission 67647.
Rates for Indirectly
Fired Wood Fuel-
Burning Units.
252:100, Appendix E.......... Primary Ambient Air 09/15/2016 08/01/2019, 84 FR ....................
Quality Standards. 37579.
252:100, Appendix F.......... Secondary Ambient Air 09/15/2016 08/01/2019, 84 FR ....................
Quality Standards. 37579.
252:100, Appendix G.......... Allowable Particulate 07/01/2009 11/03/2015, 80 FR ....................
Matter Emission 67647.
Rates for Directly
Fired Fuel-Burning
Units and Industrial
Process.
252:100, Appendix H.......... De minimis Facilities 06/25/1998 05/15/2017, 82 FR NOT in SIP: ``and/or
22281. toxic.''
252:100, Appendix L.......... PM-10 Emission 06/01/1999 12/29/2008, 73 FR ....................
Factors for Permit 79400.
by Rule for Grain
Elevators.
252:100, Appendix N.......... Specialty Coatings 09/15/2020 04/25/2023, 88 FR ....................
VOC Content Limits. 24918.
252:100, Appendix P.......... Regulated Air 06/15/2007 09/28/2016, 81 FR ....................
Pollutants. 66535.
252:100, Appendix Q.......... Incorporation by 09/16/2024 07/02/2026, 91 FR ....................
reference. 40409.
----------------------------------------------------------------------------------------------------------------
OKLAHOMA ADMINISTRATIVE CODE, TITLE 595. DEPARTMENT OF PUBLIC SAFETY, CHAPTER 20 (OAC 595:20). INSPECTION AND
EQUIPMENT FOR MOTOR VEHICLES
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 3. EMISSION AND MECHANICAL INSPECTION OF VEHICLES
----------------------------------------------------------------------------------------------------------------
595:20-3-1................... General instructions. 05/26/1994 02/29/1996, 61 FR Subsection (2) only.
7709.
595:20-3-3................... When emission anti- 05/26/1994 02/29/1996, 61 FR ....................
tampering inspection 7709.
required where
population less than
500,000.
595:20-3-5................... Emission inspection 05/26/1994 02/29/1996, 61 FR ....................
areas. 7709.
595:20-3-6................... Documentation for 05/26/1994 02/29/1996, 61 FR ....................
every inspection. 7709.
595:20-3-12.................. Inspection required 05/26/1994 02/29/1996, 61 FR ....................
each year. 7709.
595:20-3-25.................. Motorcycle or motor- 05/26/1994 02/29/1996, 61 FR ....................
driven cycles (Class 7709.
``B'').
595:20-3-26.................. Trailer and 05/26/1994 02/29/1996, 61 FR ....................
semitrailer trucks, 7709.
(Class ``C'').
595:20-3-27.................. School Buses (Class 05/26/1994 02/29/1996, 61 FR ....................
``D''). 7709.
595:20-3-41.................. Supervisory 05/26/1994 02/29/1996, 61 FR Subsection (o) only.
responsibility of 7709.
inspection station
owners and operators.
595:20-3-42.................. Responsibility for 05/26/1994 02/29/1996, 61 FR ....................
signs, forms, etc. 7709.
595:20-3-46.................. Security measures.... 05/26/1994 02/29/1996, 61 FR Subsections (a) and
7709. (b) only.
595:20-3-61.................. Refund of unused 05/26/1994 02/29/1996, 61 FR Subsections (a),
stickers. 7709. (b), (e), and (f)
only.
595:20-3-63.................. Rejected vehicles.... 05/26/1994 02/29/1996, 61 FR Subsections (b) and
7709. (g) only.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 7. INSPECTION STICKERS AND MONTHLY TAB INSERTS FOR WINDSHIELD AND TRAILER/MOTORCYCLE
----------------------------------------------------------------------------------------------------------------
595:20-7-1................... General.............. 05/26/1994 02/29/1996, 61 FR Subsections (c) and
7709. (f) only.
595:20-7-2................... Inspection 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
certificate. 7709.
595:20-7-3................... Rejection receipt-- 05/26/1994 02/29/1996, 61 FR ....................
Form VID 44. 7709.
595:20-7-4................... Station monthly 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
report--Form VID 21. 7709.
595:20-7-5................... Signature card--Form 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
VID 17. 7709.
595:20-7-6................... Request for 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
inspection stickers-- 7709.
Form VID 19.
595:20-7-7................... Request for refund-- 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
Form VID 25. 7709.
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 9. CLASS AE INSPECTION STATION, VEHICLE EMISSION ANTI-TAMPERING INSPECTION
----------------------------------------------------------------------------------------------------------------
595:20-9-1................... General.............. 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
7709.
[[Page 75219]]
595:20-9-3................... Vehicle emission 05/26/1994 02/29/1996, 61 FR Subsections (l) and
inspection. 7709. (m) only.
595:20-9-7................... Catalytic Converter 05/26/1994 02/29/1996, 61 FR ....................
System (C.A.T.). 7709.
595:20-9-10.................. Evaporative emission 05/26/1994 02/29/1996, 61 FR Subsections (a),
control system 7709. (b), and (c) only.
(E.N.P.).
595:20-9-11.................. Air injection system 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
(A.I.S. or A.I.R.). 7709.
595:20-9-12.................. Positive crankcase 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
ventilation system 7709.
(P.C.V. Valve).
595:20-9-13.................. Oxygen sensor........ 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
7709.
595:20-9-14.................. Thermostatic air 05/26/1994 02/29/1996, 61 FR Subsections (a) and
intake system 7709. (b) only.
(T.A.C).
595:20-9-15.................. Exhaust gas 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
recirculation system 7709.
(E.G.R.).
----------------------------------------------------------------------------------------------------------------
SUBCHAPTER 11. ANNUAL MOTOR VEHICLE INSPECTION AND EMISSION ANTI-TAMPERING INSPECTION RECORDS AND REPORTS
----------------------------------------------------------------------------------------------------------------
595:20-11-1.................. General.............. 05/26/1994 02/29/1996, 61 FR ....................
7709.
595:20-11-2.................. Inspection 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
certificate--VEC-1. 7709.
595:20-11-3.................. Rejection 05/26/1994 02/29/1996, 61 FR Subsection (a) only.
certificate--VIID-44. 7709.
595:20-11-4.................. Appeal procedure..... 05/26/1994 02/29/1996, 61 FR ....................
7709.
----------------------------------------------------------------------------------------------------------------
(d) EPA approved State source-specific requirements.
EPA Approved Oklahoma Source-Specific Requirements
----------------------------------------------------------------------------------------------------------------
State approval/
Name of source Permit or order No. effective EPA approval date Comments
date
----------------------------------------------------------------------------------------------------------------
General Motors, Oklahoma City: ................... 03/28/1977 12/20/1977, 42 FR Ref:
Addendum I to Chapter 4, 63781. 52.1960(c)(10).
Emissions Offset Agreement for
Permit Application.
McAlester Army Ammunition Plant Variance........... 09/21/1979 5/26/1981, 46 FR Ref:
McAlester, OK. 28159. 52.1960(c)(21).
Mesa Petroleum Company........... Variance........... 02/06/1984 7/27/1984, 49 FR Ref:
30184. 52.1960(c)(31).
Rockwell International, Tulsa.... Alternate RACT..... 03/09/1990 6/12/1990, 55 FR Ref:
23730. 52.1960(c)(36).
McDonald Douglas, Tulsa.......... Alternate RACT..... 03/09/1990 6/12/1990, 55 FR Ref:
23730. 52.1960(c)(36).
American Airlines, Tulsa......... Alternate RACT..... 03/09/1990 6/12/1990, 55 FR Ref:
23730. 52.1960(c)(36).
Nordam Lansing Street facility, Alternate RACT..... 03/09/1990 6/12/1990, 55 FR Ref:
Tulsa. 23730. 52.1960(c)(36).
Conoco Refinery, Ponca City...... 88-116-C........... 11/07/1989 03/06/1992, 57 FR Ref:
08077. 52.1960(c)(42).
Conoco Refinery, Ponca City...... 88-117-O........... 11/07/1989 03/06/1992, 57 FR Ref:
08077. 52.1960(c)(42).
Units 3 and 4 of the American PSO Regional Haze 06/20/2013 3/7/2014, 79 FR ...................
Electric Power/Public Service Agreement, Case 12953.
Company of Oklahoma (AEP/PSO) No. 10-025
Northeastern plant. (February 2010)
and Amended
Regional Haze
Agreement, DEQ
Case No. 10-025
(March 2013).
----------------------------------------------------------------------------------------------------------------
* * * * *
[FR Doc. 2026-23690 Filed 11-19-26; 8:45 am]
BILLING CODE 6560-50-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.