Air Plan Approval; Arkansas; Update to Materials Incorporated by Reference
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Arkansas State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by the State of Arkansas and approved by the EPA. This update affects the materials that are available for public inspection at the EPA Regional Office and the National Archives and Records Administration.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 223 (Friday, November 20, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 223 (Friday, November 20, 2026)]
[Rules and Regulations]
[Pages 75219-75228]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-23686]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R06-OAR-2026-8383; FRL-13644-01-R6]
Air Plan Approval; Arkansas; Update to Materials Incorporated by
Reference
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; administrative change.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is updating the
materials that are incorporated by reference (IBR) into the Arkansas
State Implementation Plan (SIP). The regulations affected by this
update have been previously submitted by the State of Arkansas and
approved by the EPA. This update affects the materials that are
available for public inspection at the EPA Regional Office and the
National Archives and Records Administration.
DATES: This rule is effective on November 20, 2026.
[[Page 75220]]
ADDRESSES: The SIP materials for which incorporation by reference into
40 Code of Federal Regulations (CFR) part 52 is finalized through this
action are available for inspection at the following locations:
Environmental Protection Agency, Region 6, 1201 Elm Street, Suite 500,
Dallas, TX 75202; and on the <a href="https://www.regulations.gov">https://www.regulations.gov</a> website at
Docket ID: EPA-R06-OAR-2026-8383.
FOR FURTHER INFORMATION CONTACT: Adina Wiley, EPA Region 6 Office, Air
Permits Section; telephone number: (214) 665-2115; email address:
<a href="/cdn-cgi/l/email-protection#0c7b65606975226d6865626d4c697c6d226b637a"><span class="__cf_email__" data-cfemail="45322c29203c6b24212c2b24052035246b222a33">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION: Throughout this document ``we,'' ``us,'' and
``our'' means the EPA. We use multiple abbreviations and terms in this
proposed rule. While this list may not be exhaustive, for ease of
reading and for reference purposes, the EPA defines the following terms
and acronyms here:
APA--Administrative Procedures Act
CAA--Clean Air Act
CFR--Code of Federal Regulations
IBR--Incorporation by Reference
NAAQS--National Ambient Air Quality Standards
SIP--State Implementation Plan
Table of Contents
I. Executive Summary
A. What action is the EPA taking?
B. What is the legal authority and what are the requirements?
II. Background
III. Incorporation by Reference
IV. Statutory and Executive Order Reviews
I. Executive Summary
A. What action is the EPA taking?
In this action, the EPA is providing notification of an update to
the materials incorporated by reference into the Arkansas SIP as of
September 30, 2026, and identified in 40 CFR 52.170(c) and 40 CFR
52.170(d). This update includes SIP materials submitted by Arkansas and
approved by the EPA since the most recent Arkansas SIP Compilation
completed March 16, 2006.\1\
---------------------------------------------------------------------------
\1\ 71 FR 13543 (Mar. 16, 2006).
---------------------------------------------------------------------------
B. What is the legal authority and what are the requirements?
The EPA has determined that this action falls under the ``good
cause'' exemption in section 553(b)(3)(B) of the Administrative
Procedure Act (APA) which, upon finding ``good cause,'' authorizes
agencies to dispense with public participation and APA section
553(d)(3) which allows an agency to make an action effective
immediately (thereby avoiding the 30-day delayed effective date
otherwise provided for in the APA). This administrative action simply
codifies provisions which are already in effect as a matter of law in
Federal and approved State programs, makes corrections and clarifying
changes to the tables in the CFR, and makes ministerial changes to the
prefatory heading to the tables in the CFR. Under section 553 of the
APA, an agency may find good cause where procedures are
``impracticable, unnecessary, or contrary to the public interest.''
Public comment for this administrative action is ``unnecessary'' and
``contrary to the public interest'' since the codification (and
corrections) only reflect existing law. Immediate notice of this action
in the Federal Register benefits the public by providing the public
notification of the updated Arkansas SIP Compilation and notification
of corrections to the Arkansas ``Identification of Plan'' portion of
the CFR. Further, pursuant to APA section 553(d)(3), making this action
immediately effective benefits the public by immediately updating both
the SIP Compilation and the CFR ``Identification of plan'' section
(which includes table entry corrections).
II. Background
Each State has a SIP containing the control measures and strategies
used to attain and maintain the national ambient air quality standards
(NAAQS) and meet other Clean Air Act requirements. The SIP is
extensive, containing such elements as air pollution control
regulations, emission inventories, monitoring networks, attainment
demonstrations, and enforcement mechanisms.
Each State must formally adopt the control measures and strategies
in the SIP after the public has had an opportunity to comment on them
and then submit the proposed SIP revisions to the EPA. Once these
control measures and strategies are approved by the EPA, and after
notice and comment, they are incorporated into the federally approved
SIP and are identified in part 52, ``Approval and Promulgation of
Implementation Plans,'' of title 40 of the Code of Federal Regulations
(40 CFR part 52). The full text of the State regulation approved by the
EPA is not reproduced in its entirety in 40 CFR part 52 but is
``incorporated by reference.'' This means that the EPA has approved a
given State provision or specified changes to the given provision with
a specific effective date. The public is referred to the location of
the full text version should they want to know which measures are
contained in a given SIP. The information provided allows the EPA and
the public to monitor the extent to which a State implements a SIP and
to take enforcement action for violations of the SIP.
The SIP is a living document which the State can revise as
necessary to address the unique air pollution problems in the State.
Therefore, the EPA from time to time must take action on proposed
revisions containing new or revised State regulations. A submission
from a State can revise one or more rules in their entirety, or
portions of rules. The State indicates the changes in the submission
(such as by using redline/strikethrough text) and the EPA then takes
action on the requested changes. The EPA establishes a docket for its
actions using a unique Docket Identification Number, which is listed in
each action. These dockets and the complete submission are available
for viewing on <a href="https://www.regulations.gov">https://www.regulations.gov</a>.
On May 22, 1997 (62 FR 27968), the EPA revised the procedures for
incorporating by reference, into the CFR, materials approved by the EPA
into each SIP. These changes revised the format for the identification
of the SIP in 40 CFR part 52, streamlined the mechanisms for announcing
the EPA approval of revisions to a SIP, and streamlined the mechanisms
for the EPA's updating of the IBR information contained for each SIP in
40 CFR part 52. The revised procedures also called for the EPA to
maintain ``SIP Compilations'' that contain the federally approved
regulations and source specific permits submitted by each State agency.
The EPA generally updates these SIP Compilations every few years.
Under the revised procedures, the EPA must periodically publish an
informational document in the rules section of the Federal Register
notifying the public that updates have been made to a SIP Compilation
for a particular State. The EPA began applying the 1997 revised
procedures to the Arkansas SIP on October 23, 1998 (63 FR 56824). The
most recent SIP Compilation update was approved on March 16, 2006 (71
FR 13543). This update includes SIP materials submitted by Arkansas and
approved by EPA since the March 16, 2006, SIP Compilation update.
III. Incorporation by Reference
In this rule, the EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, the EPA is finalizing the incorporation by reference of
previously EPA-approved regulations promulgated by Arkansas and
federally effective prior to September 30, 2026. The EPA has
[[Page 75221]]
made, and will continue to make, these materials generally available
through <a href="https://www.regulations.gov">https://www.regulations.gov</a> and at the EPA Region 6 Office
(please contact the person identified in the FOR FURTHER INFORMATION
CONTACT section of this preamble for more information).
V. Statutory and Executive Order Reviews
Under the Clean Air Act, the Administrator is required to approve a
SIP submission that complies with the provisions of the Act and
applicable Federal regulations (42 U.S.C. 7410(k); 40 CFR 52.02(a)).
Thus, in reviewing SIP submissions, the EPA's role is to approve State
choices, provided that they meet the criteria of the Clean Air Act.
Accordingly, this action merely approves State law as meeting Federal
requirements and does not impose additional requirements beyond those
imposed by State law. For that reason, this action:
<bullet> Is not a significant regulatory action subject to review
by the Office of Management and Budget under Executive Order 12866 (58
FR 51735, October 4, 1993);
<bullet> Is not an Executive Order 14192 (90 FR 9065, February 6,
2025) regulatory action because this action is not significant under
Executive Order 12866;
<bullet> Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
<bullet> Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
<bullet> Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
<bullet> Does not have federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
<bullet> Is not subject to Executive Order 13045 (62 FR 19885,
April 23, 1997) because it approves a State program;
<bullet> Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001); and
<bullet> Is not subject to requirements of section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the Clean Air Act.
In addition, the SIP is not approved to apply on any Indian
reservation land or in any other area where the EPA or an Indian Tribe
has demonstrated that a Tribe has jurisdiction. In those areas of
Indian country, the rule does not have Tribal implications and will not
impose substantial direct costs on Tribal governments or preempt Tribal
law as specified by Executive Order 13175 (65 FR 67249, November 9,
2000).
This action is subject to the Congressional Review Act, and the EPA
will submit a rule report to each House of the Congress and to the
Comptroller General of the United States. This action is not a ``major
rule'' as defined by 5 U.S.C. 804(2).
The EPA also believes that the provisions of section 307(b)(1) of
the CAA pertaining to petitions for judicial review are not applicable
to this action. This is because prior EPA rulemaking actions for each
individual component of the Arkansas SIP Compilation previously
afforded interested parties the opportunity to file a petition for
judicial review in the United States Court of Appeals for the
appropriate circuit within 60 days of such rulemaking action. Thus, the
EPA believes judicial review of this action under CAA section 307(b)(1)
is not available.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen
dioxide, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: November 9, 2026.
Walter Mason,
Regional Administrator, Region 6.
For the reasons stated in the preamble, the Environmental
Protection Agency amends 40 CFR part 52 as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart E--Arkansas
0
2. Amend Sec. 52.170 by revising and republishing paragraphs (b)
through (d) to read as follows:
Sec. 52.170 Identification of plan.
* * * * *
(b) Incorporation by reference. (1) Material listed in paragraphs
(c) and (d) of this section with an EPA approval date prior to
September 30, 2026, was approved for incorporation by reference by the
Director of the Federal Register in accordance with 5 U.S.C. 552(a) and
1 CFR part 51. Material is incorporated as it exists on the date of the
approval, and notice of any change in the material will be published in
the Federal Register. Entries in paragraphs (c) and (d) of this section
with EPA approval dates after September 30, 2026, will be incorporated
by reference in the next update to the SIP compilation.
(2) EPA Region 6 certifies that the rules/regulations provided by
the EPA in the SIP compilation at the addresses in paragraph (b)(3) of
this section are an exact duplicate of the officially promulgated State
rules/regulations that have been approved as part of the State
Implementation Plan as of the dates referenced in paragraph (b)(1) of
this section.
(3) Copies of the materials incorporated by reference may be
inspected at the Environmental Protection Agency, Region 6 Office at
1201 Elm Street, Suite 500, Dallas, Texas 75270. If you wish to obtain
material from the EPA Regional Office, please call (214) 665-7346. You
may inspect the material with an EPA approval date prior to September
30, 2026, for Arkansas at the National Archives and Records
Administration (NARA). For information on the availability of this
material at NARA email <a href="/cdn-cgi/l/email-protection#b2d4d7d6c0d7d59cded7d5d3def2dcd3c0d39cd5ddc4"><span class="__cf_email__" data-cfemail="2a4c4f4e584f4d04464f4d4b466a444b584b044d455c">[email protected]</span></a> or go to <a href="https://www.archives.gov/federal-register/cfr/ibr-locations">https://www.archives.gov/federal-register/cfr/ibr-locations</a>.
(c) EPA approved regulations.
[[Page 75222]]
EPA-Approved Regulations in the Arkansas SIP
----------------------------------------------------------------------------------------------------------------
State
State citation Title/subject submittal/ EPA approval date Explanation
effective date
----------------------------------------------------------------------------------------------------------------
Title 8. Environmental Law
----------------------------------------------------------------------------------------------------------------
Chapter I. Arkansas Pollution Control and Ecology Commission, Department of Energy and Environment
----------------------------------------------------------------------------------------------------------------
Subchapter B. Administration
----------------------------------------------------------------------------------------------------------------
Part 12. Permit Fee Rules
----------------------------------------------------------------------------------------------------------------
Subpart 1. General Provisions
----------------------------------------------------------------------------------------------------------------
8 CAR Section 12-101............. Title.............. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-102............. Purpose............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-103............. Definitions........ 02/04/2025 01/26/2026, 91 FR The Arkansas SIP
3037. does NOT include
the definitions of
``Category'',
``Certificate'',
``Confined Animal
Operation'',
``Discretionary
Major Facility'',
``Evaluation'',
``Laboratory'',
``Major Municipal
Facility'', ``Non-
Municipal Major
Facility'',
``Parameter'', and
``Program''.
8 CAR Section 12-104............. Applicability...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-105............. Severability....... 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
Subpart 2. Permit Fee Payment
----------------------------------------------------------------------------------------------------------------
8 CAR Section 12-201............. Permit fee payment. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-202............. Refunds............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
Subpart 4. Air Permit Fees
----------------------------------------------------------------------------------------------------------------
8 CAR Section 12-401............. Applicability...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-402............. Terms used in fee 02/04/2025 01/26/2026, 91 FR ...................
formulas. 3037.
8 CAR Section 12-403............. Initial fees....... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-404............. Annual fees........ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-405............. Modification fees.. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-406............. Administrative 02/04/2025 01/26/2026, 91 FR ...................
permit amendments 3037.
and renewal
permits.
8 CAR Section 12-407............. General permits.... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-408............. Permit fees for 02/04/2025 01/26/2026, 91 FR ...................
certain small 3037.
business subject
to part 70
permitting
requirements.
----------------------------------------------------------------------------------------------------------------
Subpart 8. Administrative Procedures
----------------------------------------------------------------------------------------------------------------
8 CAR Section 12-801............. Division review of 02/04/2025 01/26/2026, 91 FR ...................
fees. 3037.
8 CAR Section 12-802............. Appeals............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 12-803............. Effective date..... 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
[[Page 75223]]
Subchapter D. Air Quality
----------------------------------------------------------------------------------------------------------------
Part 41. Rules of the Arkansas Plan of Implementation for Air Pollution Control
----------------------------------------------------------------------------------------------------------------
Subpart 1. Title, Intent and Purpose--Definitions
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-101............. Title.............. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-102............. Applicability...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-103............. Intent and 02/04/2025 01/26/2026, 91 FR ...................
construction. 3037.
8 CAR Section 41-104............. Severability....... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-105............. Incorporation by 02/04/2025 01/26/2026, 91 FR ...................
reference. 3037.
8 CAR Section 41-106............. Definitions........ 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
Subpart 2. Protection of the National Ambient Air Quality Standards
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-201............. Purpose............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-202............. Division 02/04/2025 01/26/2026, 91 FR ...................
responsibilities. 3037.
8 CAR Section 41-203............. Regulated sources 02/04/2025 01/26/2026, 91 FR ...................
responsibilities. 3037.
8 CAR Section 41-204............. Delegated federal 02/04/2025 01/26/2026, 91 FR ...................
programs. 3037.
----------------------------------------------------------------------------------------------------------------
Subpart 3. Minor Source Review
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-301............. General 02/04/2025 01/26/2026, 91 FR ...................
applicability. 3037.
8 CAR Section 41-302............. Approval criteria.. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-303............. Owner/operator's 02/04/2025 01/26/2026, 91 FR ...................
responsibilities. 3037.
8 CAR Section 41-304............. Required 02/04/2025 01/26/2026, 91 FR ...................
information. 3037.
8 CAR Section 41-305............. Action on 02/04/2025 01/26/2026, 91 FR ...................
application. 3037.
8 CAR Section 41-306............. Public 02/04/2025 01/26/2026, 91 FR ...................
participation. 3037.
8 CAR Section 41-307............. Permit amendments.. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-308............. Exemption from 02/04/2025 01/26/2026, 91 FR ...................
permitting. 3037.
8 CAR Section 41-309............. [Reserved]......... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-310............. Permit revocation 02/04/2025 01/26/2026, 91 FR ...................
and cancellation. 3037.
8 CAR Section 41-311............. General permits.... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-312............. Dispersion modeling 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-313............. Confidentiality.... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-314............. Operational 02/04/2025 01/26/2026, 91 FR ...................
flexibility--Appli 3037.
cant's duty to
apply for
alternative
scenarios.
8 CAR Section 41-315............. Changes resulting 02/04/2025 01/26/2026, 91 FR ...................
in no emissions 3037.
increases.
8 CAR Section 41-316............. Permit flexibility. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-317............. Registration....... 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
[[Page 75224]]
Subpart 4. General Emissions Limitations Applicable to Equipment
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-401............. Purpose............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-402............. General rules...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-403............. Visible emission 02/04/2025 01/26/2026, 91 FR ...................
rules. 3037.
8 CAR Section 41-404............. Stack height/ 02/04/2025 01/26/2026, 91 FR ...................
dispersion rules. 3037.
8 CAR Section 41-405............. Revised emissions 02/04/2025 01/26/2026, 91 FR ...................
limitation. 3037.
----------------------------------------------------------------------------------------------------------------
Subpart 5. Upset and Emergency Conditions
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-501............. Upset conditions... 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
Subpart 6. Sampling, Monitoring, and Reporting Requirements
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-601............. Purpose............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-602............. Air emissions 02/04/2025 01/26/2026, 91 FR ...................
sampling. 3037.
8 CAR Section 41-603............. Continuous 02/04/2025 01/26/2026, 91 FR ...................
emissions 3037.
monitoring.
8 CAR Section 41-604............. Notice of 02/04/2025 01/26/2026, 91 FR ...................
completion. 3037.
8 CAR Section 41-605............. Recordkeeping and 02/04/2025 01/26/2026, 91 FR ...................
reporting 3037.
requirements.
8 CAR Section 41-606............. Public availability 02/04/2025 01/26/2026, 91 FR ...................
of emissions data. 3037.
----------------------------------------------------------------------------------------------------------------
Subpart 8. Prevention of Significant Deterioration Rules of the Arkansas Plan of Implementation for Air
Pollution Control
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-801............. Title.............. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-802............. Purposes........... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-803............. Definitions........ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-804............. Adoption of rules.. 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
Subpart 9. Rules for the Control of Volatile Organic Compounds in Pulaski County
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-901............. Title.............. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-902............. Purpose............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-903............. Definitions........ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-904............. [Reserved]......... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-905............. Provisions for 02/04/2025 01/26/2026, 91 FR ...................
specific processes. 3037.
----------------------------------------------------------------------------------------------------------------
Subpart 10. Major Source Permitting Requirements
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-1001............ Permitting 02/04/2025 01/26/2026, 91 FR ...................
procedure for part 3037.
70 source.
----------------------------------------------------------------------------------------------------------------
Subpart 12. Stage 1 Vapor Recovery
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-1201............ Purpose............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-1202............ Applicability...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-1203............ Definitions........ 02/04/2025 01/26/2026, 91 FR ...................
3037.
[[Page 75225]]
8 CAR Section 41-1204............ Exemptions......... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-1205............ Prohibited 02/04/2025 01/26/2026, 91 FR ...................
activities. 3037.
8 CAR Section 41-1206............ Recordkeeping...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-1207............ Inspections........ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-1208............ Vapor recovery 02/04/2025 01/26/2026, 91 FR ...................
systems. 3037.
8 CAR Section 41-1209............ Gasoline delivery 02/04/2025 01/26/2026, 91 FR ...................
vessels. 3037.
8 CAR Section 41-1210............ Owner/operator 02/04/2025 01/26/2026, 91 FR ...................
responsibility. 3037.
8 CAR Section 41-1211............ Test methods....... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-1212............ Effective date..... 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
Subpart 13. [Reserved]
----------------------------------------------------------------------------------------------------------------
Subpart 14. Best Available Retrofit Technology
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-1401............ Purpose............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-1402............ Definitions........ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-1403............ [Reserved]......... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 41-1404............ [Reserved]......... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Sectio 41-1405............. Best available 02/04/2025 01/26/2026, 91 FR ...................
retrofit 3037.
technology
requirements.
8 CAR Section 41-1406............ Compliance 02/04/2025 01/26/2026, 91 FR ...................
provisions. 3037.
----------------------------------------------------------------------------------------------------------------
Subpart 15. [Reserved]
----------------------------------------------------------------------------------------------------------------
Subpart 17. Effective Date
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41-1701............ Effective Date..... 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
Appendix A. Insignificant Activities List
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41, Appendix A..... Insignificant 02/04/2025 01/26/2026, 91 FR ...................
Activities List. 3037.
----------------------------------------------------------------------------------------------------------------
Appendix B. National Ambient Air Quality Standards List
----------------------------------------------------------------------------------------------------------------
8 CAR Section 41, Appendix B..... National Ambient 02/04/2025 01/26/2026, 91 FR ...................
Air Quality 3037.
Standards List.
----------------------------------------------------------------------------------------------------------------
Part 42. Rules of the Arkansas Operating Air Permit Program
----------------------------------------------------------------------------------------------------------------
Subpart 2. Requirement for a Permit--Applicability
----------------------------------------------------------------------------------------------------------------
8 CAR Section 42-201............. Requirement for a 02/04/2025 01/26/2026, 91 FR ...................
permit. 3037.
8 CAR Section 42-202............. Sources subject to 02/04/2025 01/26/2026, 91 FR ...................
permitting. 3037.
----------------------------------------------------------------------------------------------------------------
Subpart 3. Applications for Permits
----------------------------------------------------------------------------------------------------------------
8 CAR Section 42-301............. Duty to apply...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 42-302............. Standard 02/04/2025 01/26/2026, 91 FR ...................
application form 3037.
and required
information.
8 CAR Section 42-307............. Complete 02/04/2025 01/26/2026, 91 FR ...................
application. 3037.
[[Page 75226]]
8 CAR Section 42-309............. Applicant's duty to 02/04/2025 01/26/2026, 91 FR ...................
supplement or 3037.
correct
application.
8 CAR Section 42-310............. Certification by 02/04/2025 01/26/2026, 91 FR ...................
responsible 3037.
official.
----------------------------------------------------------------------------------------------------------------
Subpart 4. Action on Applications
----------------------------------------------------------------------------------------------------------------
8 CAR Section 42-401............. Action on part 70 02/04/2025 01/26/2026, 91 FR ...................
permit 3037.
applications.
8 CAR Section 42-402............. Final action on 02/04/2025 01/26/2026, 91 FR ...................
permit application. 3037.
----------------------------------------------------------------------------------------------------------------
Subpart 5. Permit Review by the Public, Affected States, and the Environmental Protection Agency
----------------------------------------------------------------------------------------------------------------
8 CAR 42-501..................... Applicability...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 42-502............. Public 02/04/2025 01/26/2026, 91 FR ...................
participation. 3037.
8 CAR Section 42-503............. Transmission of 02/04/2025 01/26/2026, 91 FR ...................
permit information 3037.
to the
Administrator of
the Environmental
Protection Agency.
8 CAR 42-504..................... Review of draft 02/04/2025 01/26/2026, 91 FR ...................
permit by affected 3037.
states.
----------------------------------------------------------------------------------------------------------------
Part 43. Nonattainment New Source Review Requirements
----------------------------------------------------------------------------------------------------------------
Subpart 1. General Provisions
----------------------------------------------------------------------------------------------------------------
8 CAR Section 43-101............. Title.............. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-102............. Applicability...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-103............. Severability....... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-104............. Definitions........ 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
Subpart 2. Preconstruction Review
----------------------------------------------------------------------------------------------------------------
8 CAR Section 43-201............. Requirement for a 02/04/2025 01/26/2026, 91 FR ...................
permit. 3037.
8 CAR Section 43-202............. Required 02/04/2025 01/26/2026, 91 FR ...................
information. 3037.
8 CAR Section 43-203............. Approval criteria.. 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-204............. Offsets............ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-205............. Zones targeted for 02/04/2025 01/26/2026, 91 FR ...................
economic 3037.
development.
8 CAR Section 43-206............. Control technology 02/04/2025 01/26/2026, 91 FR ...................
information. 3037.
8 CAR Section 43-207............. Approval to 02/04/2025 01/26/2026, 91 FR ...................
construct. 3037.
8 CAR Section 43-208............. Applicability to 02/04/2025 01/26/2026, 91 FR ...................
attainment or 3037.
unclassifiable
areas.
8 CAR Section 43-209............. Applicability of 02/04/2025 01/26/2026, 91 FR ...................
other rules. 3037.
----------------------------------------------------------------------------------------------------------------
Subpart 3. Applicability Tests
----------------------------------------------------------------------------------------------------------------
8 CAR Section 43-301............. Actual-to-projected 02/04/2025 01/26/2026, 91 FR ...................
actual 3037.
applicability test.
8 CAR Section 43-302............. Actual-to-potential 02/04/2025 01/26/2026, 91 FR ...................
test. 3037.
8 CAR Section 43-303............. [Reserved]......... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-304............. [Reserved]......... 02/04/2025 01/26/2026, 91 FR ...................
3037.
[[Page 75227]]
8 CAR Section 43-305............. Emission baseline 02/04/2025 01/26/2026, 91 FR ...................
credits. 3037.
8 CAR Section 43-306............. Relaxation of 02/04/2025 01/26/2026, 91 FR ...................
limitations. 3037.
8 CAR Section 43-307............. Modification to 02/04/2025 01/26/2026, 91 FR ...................
existing units. 3037.
8 CAR Section 43-308............. Public availability 02/04/2025 01/26/2026, 91 FR ...................
of information. 3037.
8 CAR Section 43-309............. Applicability to 02/04/2025 01/26/2026, 91 FR ...................
nitrogen oxides. 3037.
8 CAR Section 43-310............. Offset requirements 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-311............. PM10 precursors.... 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
Subpart 4. [Reserved]
----------------------------------------------------------------------------------------------------------------
Subpart 5. [Reserved]
----------------------------------------------------------------------------------------------------------------
Subpart 6. [Reserved]
----------------------------------------------------------------------------------------------------------------
Subpart 7. Actual PALs
----------------------------------------------------------------------------------------------------------------
8 CAR Section 43-701............. Applicability...... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-702............. Definitions........ 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-703............. Permit application 02/04/2025 01/26/2026, 91 FR ...................
requirements. 3037.
8 CAR Section 43-704............. General 02/04/2025 01/26/2026, 91 FR ...................
requirements for 3037.
establishing PALs.
8 CAR Section 43-705............. Public 02/04/2025 01/26/2026, 91 FR ...................
participation 3037.
requirement for
PALs.
8 CAR Section 43-706............. Setting the ten- 02/04/2025 01/26/2026, 91 FR ...................
year actuals PAL 3037.
level.
8 CAR Section 43-707............. Contents of the PAL 02/04/2025 01/26/2026, 91 FR ...................
permit. 3037.
8 CAR Section 43-708............. Reopening of the 02/04/2025 01/26/2026, 91 FR ...................
PAL permit. 3037.
8 CAR Section 43-709............. PAL effective 02/04/2025 01/26/2026, 91 FR ...................
period. 3037.
8 CAR Section 43-710............. Expiration of a PAL 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-711............. Renewal of a PAL... 02/04/2025 01/26/2026, 91 FR ...................
3037.
8 CAR Section 43-712............. Increasing a PAL 02/04/2025 01/26/2026, 91 FR ...................
during the PAL 3037.
effective period.
8 CAR Section 43-713............. Monitoring 02/04/2025 01/26/2026, 91 FR ...................
requirements for 3037.
PALs.
8 CAR Section 43-714............. Recordkeeping 02/04/2025 01/26/2026, 91 FR ...................
requirements. 3037.
8 CAR Section 43-715............. Reporting and 02/04/2025 01/26/2026, 91 FR ...................
notification 3037.
requirements.
8 CAR Section 43-716............. Transition 02/04/2025 01/26/2026, 91 FR ...................
requirements. 3037.
----------------------------------------------------------------------------------------------------------------
Subpart 8. Effective Date
----------------------------------------------------------------------------------------------------------------
8 CAR Section 43-801............. Effective Date..... 02/04/2025 01/26/2026, 91 FR ...................
3037.
----------------------------------------------------------------------------------------------------------------
(d) EPA-approved State source-specific requirements.
[[Page 75228]]
EPA-Approved Arkansas Source-Specific Requirements
----------------------------------------------------------------------------------------------------------------
State approval/
Name of source Permit or order No. effective EPA approval date Comments
date
----------------------------------------------------------------------------------------------------------------
Arkansas Electric Cooperative Administrative 08/07/2018 09/27/2019, 84 FR Unit 1.
Corporation Carl E. Bailey Order LIS No. 18- 51033.
Generating Station. 071.
Arkansas Electric Cooperative Administrative 08/07/2018 09/27/2019, 84 FR Unit 1.
Corporation John L. McClellan Order LIS No. 18- 51033.
Generating Station. 071.
Southwestern Electric Power Administrative 08/07/2018 09/27/2019, 84 FR Unit 1.
Company Flint Creek Power Plant. Order LIS No. 18- 51033.
072.
Entergy Arkansas, Inc. Lake Administrative 08/07/2018 09/27/2019, 84 FR Unit 4.
Catherine Plant. Order LIS No. 18- 51033.
073.
Entergy Arkansas, Inc. White Administrative 08/07/2018 09/27/2019, 84 FR Units 1, 2, and
Bluff Plant. Order LIS No. 18- 51033. Auxiliary Boiler.
073.
Entergy Arkansas, Inc. Administrative 08/07/2018 09/27/2019, 84 FR Units 1 and 2.
Independence Plant. Order LIS No. 18- 51033.
073.
Domtar Ashdown Mill.............. Permit #0287-AOP- 08/01/2019 03/22/2021, 86 FR Approval of
R22. 15104. plantwide
conditions 32 to
43 of section VI
from the permit,
addressing
emission limits
for SO2, NOX, and
PM10 and
conditions for
implementing the
BART alternative
for Power Boilers
No. 1 and 2.
FutureFuel Chemical Company...... Administrative 08/03/2022 08/27/2026, 91 FR Three boiler system
Order LIS No. 22- 55268. (SN:6M01-01).
085.
----------------------------------------------------------------------------------------------------------------
* * * * *
[FR Doc. 2026-23686 Filed 11-19-26; 8:45 am]
BILLING CODE 6560-50-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.