Notice2026-22355
International Falls Power Company; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
November 3, 2026
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 211 (Tuesday, November 3, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 211 (Tuesday, November 3, 2026)]
[Notices]
[Page 69247]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-22355]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5223-040]
International Falls Power Company; Notice of Application Accepted
for Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: 5223-040.
c. Date filed: November 24, 2025.
d. Applicant: International Falls Power Company.
e. Name of Project: International Falls Hydroelectric Project
(project).
f. Location: On the Rainy River, in Koochiching and St. Louis
Counties, Minnesota.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Robert Pflederer Assistant
Superintendent--Power/Recovery PCA--International Falls, MN 400 2nd
Street International Falls, MN 56649; telephone:218-324-3931; or
email:<a href="/cdn-cgi/l/email-protection#e7b58885829593b7818b828382958295a79786848c86808e898084889597c984888a"><span class="__cf_email__" data-cfemail="b6e4d9d4d3c4c2e6d0dad3d2d3c4d3c4f6c6d7d5ddd7d1dfd8d1d5d9c4c698d5d9db">[email protected]</span></a>.
i. FERC Contact: Colleen Corballis, Project Coordinator, Midwest
Branch, Division of Hydropower Licensing; telephone at (202) 502-8598;
email at <a href="/cdn-cgi/l/email-protection#2e4d4142424b4b40004d415c4c4f4242475d6e484b5c4d00494158"><span class="__cf_email__" data-cfemail="c4a7aba8a8a1a1aaeaa7abb6a6a5a8a8adb784a2a1b6a7eaa3abb2">[email protected]</span></a>.
j. Deadline for filing motions to intervene and protests: On or
before 5:00 p.m. Eastern Time on December 28, 2026.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests using the Commission's eFiling system
at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit
brief comments up to 10,000 characters, without prior registration,
using the eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For assistance, please contact FERC Online Support
at <a href="/cdn-cgi/l/email-protection#2d6b687f6e6243414443487e585d5d425f596d4b485f4e034a425b"><span class="__cf_email__" data-cfemail="c78182958488a9abaea9a294b2b7b7a8b5b387a1a2b5a4e9a0a8b1">[email protected]</span></a>, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
via U.S. Postal Service to: Debbie-Anne A. Reese, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any other carrier must be addressed to:
Debbie Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any
filing should include docket number P-5223-040.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. The project consists of: (1) a 48,296.3-acre impoundment (Rainy
Lake) having a storage capacity of 1,545,482 acre-feet at elevation
1,108.1 feet mean sea level; (2) a 170-foot-long masonry overflow
gravity section; (3) a 215-foot-long powerhouse integral with the dam
containing seven turbine-generator units with a total installed
capacity of 14.45 megawatts; (4) 6.9-kilovolt generator leads
connecting the project to the non-project International Falls Mill; and
(5) appurtenant facilities. The project dam spans between the U.S.A.
and Canada, but the project boundary only encompasses the U.S.A. side
of the dam.
International Falls Power Company proposes to continue to operate
the project in accordance with the 2018 rule curve regulating the level
of Rainy Lake as prescribed by the International Joint Commission,
established by the Boundary Waters Treaty of 1909 between the United
States of America (U.S.A) and Canada.
m. A copy of the application may be viewed on the Commission's
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support.
You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. For public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, contact the Office
of Public Participation at (202)502-6595 or <a href="/cdn-cgi/l/email-protection#19564949597f7c6b7a377e766f"><span class="__cf_email__" data-cfemail="db948b8b9bbdbea9b8f5bcb4ad">[email protected]</span></a>.
o. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name of the person
protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain
copies of the application directly from the applicant. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application.
p. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate
Issue Scoping Notice--November 2026.
Request Additional Information (if necessary)--November 2026.
Scoping Comments Due--December 2026.
(Authority: 18 CFR 2.1.)
Dated: October 28, 2026.
Carlos D. Clay,
Deputy Secretary.
[FR Doc. 2026-22355 Filed 11-2-26; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on November 3, 2026.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.