The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise Federal, State, local governmental agencies, and the public and other concerned stakeholders that USACE is withdrawing the Notice of Intent (NOI) for the preparation of an Environmental Impact Statement (EIS) as part of the Port of Iberia (also referred to as `the Port' or `Iberia Port'), Louisiana navigation feasibility study. Since publication of the NOI, study conditions have changed; the USACE has determined that an Environmental Assessment (EA) rather than an EIS is the appropriate level of environmental documentation.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 210 (Monday, November 2, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 210 (Monday, November 2, 2026)]
[Notices]
[Pages 68950-68951]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-22315]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Withdrawal of Notice of Intent To Prepare an Environmental Impact
Statement, Port of Iberia, Louisiana
AGENCY: U.S. Army Corps of Engineers, Department of the Army, DoD.
ACTION: Notice; withdrawal.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers (USACE) is issuing this
notice to advise Federal, State, local governmental agencies, and the
public and other concerned stakeholders that USACE is withdrawing the
Notice of Intent (NOI) for the preparation of an Environmental Impact
Statement (EIS) as part of the Port of Iberia (also referred to as `the
Port' or `Iberia Port'), Louisiana navigation feasibility study. Since
publication of the NOI, study conditions have changed; the USACE has
determined that an Environmental Assessment (EA) rather than an EIS is
the appropriate level of environmental documentation.
DATES: The NOI to prepare an EIS published in the Federal Register on
October 31, 2002 (67 FR 66388), is withdrawn as of November 2, 2026.
ADDRESSES: U.S. Army Corps of Engineers, New Orleans; 7400 Leake Ave.,
New Orleans, Louisiana 70118.
FOR FURTHER INFORMATION CONTACT: Questions about the withdrawal of the
[[Page 68951]]
NOI can be directed to Elizabeth Behrens at (504) 862-2025 or by email
at <a href="/cdn-cgi/l/email-protection#ce8ba2a7b4afacabbaa6e086e08caba6bcaba0bd8ebbbdafadabe0afbca3b7e0a3a7a2"><span class="__cf_email__" data-cfemail="4a0f2623302b282f3e22640264082f22382f24390a3f392b292f642b38273364272326">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION: Section 431 (Iberia Port, Louisiana) of the
Water Resources Development Act (WRDA) of 2000 (Pub. L. 106-541)
authorized ``a study to determine the feasibility of carrying out a
project for navigation, Iberia Port, Louisiana.'' A final Feasibility
Report and EIS were completed in 2006; however, a Record of Decision
for the EIS was not signed. The project was subsequently authorized
under Section 1001(25) of the WRDA 2007, as amended by Section
6004(a)(7) of the Water Resources Reform and Development Act of 2014.
USACE has since assessed the environmental impacts of the proposed
action and determined that there would be no significant adverse
impact(s) on the human and natural environment. Unavoidable impacts to
wetlands will be fully mitigated; and because forecasted impacts from
the proposed action can be fully mitigated, significant adverse effects
are no longer a concern, an EIS is not warranted. The USACE will notify
the public in advance of the availability of EA #611 and draft Finding
of No Significant Impact (FONSI) through public notice. A copy of the
signed FONSI will be made available for viewing and download on the
project website at: <a href="https://www.mvn.usace.army.mil/About/Projects/Port-of-Iberia/">https://www.mvn.usace.army.mil/About/Projects/Port-of-Iberia/</a>. Any future proposed federal action(s) related to the study,
or authorized project if authorized, will comply with the requirements
of the NEPA of 1969, as amended (42 U.S.C. 4321 et seq.), the
Department of War NEPA Implementing Procedures (September 3, 2026), and
other related environmental review requirements.
James A. Bodron,
Programs Director, Mississippi Valley Division.
[FR Doc. 2026-22315 Filed 10-30-26; 8:45 am]
BILLING CODE 3720-58-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.