Rule2026-21622

Virginia: Approval of State Coal Combustion Residuals Permit Program

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
October 22, 2026
Effective
November 23, 2026

Issuing agencies

Environmental Protection Agency

Abstract

The Environmental Protection Agency (EPA or the Agency) is approving Virginia's coal combustion residuals (CCR) permit program under the Resource Conservation and Recovery Act (RCRA). After reviewing the CCR permit program application submitted by the Virginia Department of Environmental Quality (VADEQ), EPA has determined that Virginia's partial CCR permit program meets the standard for approval under RCRA. Virginia's CCR permit program will operate in lieu of the Federal CCR program with the exception of the specific provisions noted below.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 203 (Thursday, October 22, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 203 (Thursday, October 22, 2026)]
[Rules and Regulations]
[Pages 66643-66651]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-21622]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 257

[EPA-HQ-OLEM-2025-3325; FRL-12983-02-OLEM]


Virginia: Approval of State Coal Combustion Residuals Permit 
Program

AGENCY: Environmental Protection Agency (EPA).

ACTION: Availability of final decision.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA or the Agency) is 
approving Virginia's coal combustion residuals (CCR) permit program 
under the Resource Conservation and Recovery Act (RCRA). After 
reviewing the CCR permit program application submitted by the Virginia 
Department of Environmental Quality (VADEQ), EPA has determined that 
Virginia's partial CCR permit program meets the standard for approval 
under RCRA. Virginia's CCR permit program will operate in lieu of the 
Federal CCR program with the exception of the specific provisions noted 
below.

DATES: This action is effective on November 23, 2026.

ADDRESSES: EPA has established a docket for this action under Docket ID 
No. EPA-HQ-OLEM-2025-3325. All documents in the docket are listed on 
the <a href="https://www.regulations.gov">https://www.regulations.gov</a> website. Although listed in the index, 
some information is not publicly available, e.g., Confidential Business 
Information or other information whose disclosure is restricted by 
statute. Certain other material, such as copyrighted material, is not 
placed on the internet and will be publicly available only in hard copy 
form.

FOR FURTHER INFORMATION CONTACT: Michelle Lloyd, Office of Resource 
Conservation and Recovery, Materials Recovery and Waste Management 
Division, U.S. Environmental Protection Agency, 1200 Pennsylvania 
Avenue NW, Washington, DC 20460; telephone number: (202) 566-0560; 
email address: <a href="/cdn-cgi/l/email-protection#b2dededdcbd69cdfdbd1dad7deded7f2d7c2d39cd5ddc4"><span class="__cf_email__" data-cfemail="1b777774627f35767278737e77777e5b7e6b7a357c746d">[email&#160;protected]</span></a>. For more information on this 
document please visit <a href="https://www.epa.gov/coal-combustion-residuals">https://www.epa.gov/coal-combustion-residuals</a>.

SUPPLEMENTARY INFORMATION:

List of Acronyms

DCR Virginia Department of Conservation and Recreation
CCR coal combustion residuals
CFR Code of Federal Regulations
EPA Environmental Protection Agency
MSWLF municipal solid waste landfill
NOI Notice of Intent
OLEM Office of Land and Emergency Management
PEEP Permitting Enhancement and Evaluation Platform
RCRA Resource Conservation and Recovery Act
SHWD Solid and Hazardous Waste Division
STAG State and Tribal Assistance Grant
VAC Virginia Administrative Code
VADEQ Virginia Department of Environmental Quality
VPDES Virginia Pollutant Discharge Elimination System
VSWMR Virginia Solid Waste Management Regulations
VWMA Virginia Waste Management Act
WIIN Water Infrastructure Improvements for the Nation

I. General Information

A. Summary of Final Action

    EPA is taking final action to approve of Virginia's partial CCR 
permit program because the Agency finds that the State's program 
requires each CCR unit in the State to achieve compliance with the 
minimum requirements in the Federal CCR regulations or with alternative 
requirements that EPA has determined to be at least as protective as 
the requirements of the Federal CCR regulations in 40 CFR part 257, 
subpart D, for the reasons set forth in the Proposed Approval (91 FR 
23924, May 4, 2026) and this final action. See, 42 U.S.C. 
6945(d)(1)(B).

B. Background

    CCR are generated from the combustion of coal, including solid 
fuels classified as anthracite, bituminous coal, subbituminous coal, 
and lignite, for the purpose of generating steam to power a generator 
to produce electricity or electricity and other thermal energy by 
electric utilities and independent power producers. CCR, commonly known 
as coal ash, include fly ash, bottom ash, boiler slag, and flue gas 
desulfurization materials. CCR can be sent offsite for disposal or 
beneficial use or disposed of in on-site landfills or surface 
impoundments.
    On April 17, 2015, EPA published a final rule creating 40 CFR part 
257, subpart D, which established a comprehensive set of minimum 
Federal requirements for the disposal of CCR in landfills and surface 
impoundments (80 FR 21302). The rule created a self-implementing 
program that regulates the location, design, operating criteria, and 
groundwater monitoring and corrective action for CCR units, as well as 
the closure and post-closure care of CCR units. It also requires 
recordkeeping and notifications for CCR units. EPA has since amended 40 
CFR part 257, subpart D on August 5, 2016 (81 FR 51802), July 30, 2018 
(83 FR 36435), August 28, 2020 (85 FR 53516), November 12, 2020 (85 FR 
72506), May 8, 2024 (89 FR 38950), November 8, 2024 (89 FR 88650), and 
February 10, 2026 (91 FR 5806). More information on these rules is 
provided in the Technical Support Document in the docket for this 
document.\1\
---------------------------------------------------------------------------

    \1\ Technical Support Document for the Approval of Virginia's 
Coal Combustion Residuals Permit Program. U.S. Environmental 
Protection Agency, Office of Land and Emergency Management (5304T), 
1200 Pennsylvania Avenue NW, Washington, DC 20460. April 2026. EPA-
HQ-OLEM-2025-3325-0026.

---------------------------------------------------------------------------

[[Page 66644]]

C. Statutory Authority

    EPA is issuing this final action pursuant to RCRA sections 4005(d) 
and 7004(b)(1). See 42 U.S.C. 6945(d) and 6974(b)(1). As amended by 
section 2301 of the 2016 WIIN Act, RCRA section 4005(d) instructs EPA 
to establish a Federal permit program similar to those under RCRA 
subtitle C and other environmental statutes and authorizes States to 
develop their own CCR permitting programs that go into effect in lieu 
of the Federal permit program upon approval by EPA. See 42 U.S.C. 
6945(d).
    Under RCRA section 4005(d)(1)(A), 42 U.S.C. 6945(d)(1)(A), States 
seeking approval of a State CCR program must submit to the 
Administrator ``in such form as the Administrator may establish, 
evidence of a permit program or other system of prior approval and 
conditions under state law for regulation by the State of coal 
combustion residuals units that are located in the state.'' The statute 
provides that EPA shall approve a State CCR permit program if the 
Administrator determines that the State program will require each CCR 
unit located in the State to achieve compliance with either: (1) The 
Federal CCR requirements at 40 CFR part 257, subpart D; or (2) Other 
State criteria that the Administrator, after consultation with the 
State, determines to be ``at least as protective as'' the Federal 
requirements. 42 U.S.C. 6945(d)(1)(B). The Administrator must make a 
final determination, after providing for public notice and an 
opportunity for public comment, within 180 days of receiving a State's 
complete submittal of the information specified in RCRA section 
4005(d)(1)(A).\2\ 42 U.S.C. 6945(d)(1)(B). EPA may approve a State CCR 
permit program in whole or in part. Id. Once approved, the State permit 
program operates in lieu of the Federal requirements. 42 U.S.C. 
6945(d)(1)(A). In a State with a partial program, only the State 
requirements that have been approved by EPA operate in lieu of the 
Federal requirements, and facilities remain responsible for compliance 
with all remaining Federal requirements in 40 CFR part 257.
---------------------------------------------------------------------------

    \2\ USEPA 2017. Coal Combustion Residuals State Permit Program 
Guidance Document; Interim Final. Office of Land and Emergency 
Management, Washington, DC 20460. August. (providing that the 180-
day deadline does not start until EPA determines the application is 
complete).
---------------------------------------------------------------------------

    As noted above, the Federal CCR regulations are self-implementing, 
meaning that CCR landfills and surface impoundments must comply with 
the terms of the regulations prior to obtaining a Federal permit or a 
permit issued by an approved State. Noncompliance with the Federal CCR 
regulations can be the subject of an enforcement action brought 
directly against the facility. Once a final CCR permit is issued by an 
approved State or pursuant to a Federal CCR permit program, however, 
the terms of the permit apply in lieu of the terms of the Federal CCR 
regulations and/or requirements in an approved State program, and RCRA 
section 4005(d)(3) provides a permit shield against direct enforcement 
of the applicable Federal or State CCR regulations (meaning the 
permit's terms become the enforceable requirements for the permittee).
    RCRA section 7004(b), which applies to all RCRA programs, directs 
that ``public participation in the development, revision, 
implementation, and enforcement of any . . . program under this chapter 
shall be provided for, encouraged, and assisted by the Administrator 
and the States.'' 42 U.S.C. 6974(b)(1). Accordingly, EPA considers 
permitting requirements, requirements for compliance monitoring 
authority, requirements for enforcement authority, and requirements for 
intervention in civil enforcement proceedings in evaluating State CCR 
permit program applications.
    Once a State CCR permit program is approved, the Administrator must 
review the approved program no less frequently than every 12 years, no 
later than three years after a revision to an applicable section of 40 
CFR part 257, subpart D, and no later than one year after any 
unauthorized significant release from a CCR unit located in the State. 
EPA also must review an approved State CCR permit program at the 
request of another State alleging that the soil, groundwater, or 
surface water of the requesting State is or is likely to be adversely 
affected by a release from a CCR unit in the approved State. See 42 
U.S.C. 6945(d)(1)(D)(i)(I) through (IV).
    In a State with an approved State CCR permit program, EPA may 
commence administrative or judicial enforcement actions under RCRA 
section 3008, 42 U.S.C. 6928, if the State requests assistance or if 
EPA determines that an EPA enforcement action is likely to be necessary 
to ensure that a CCR unit is operating in accordance with the criteria 
of the State's permit program. 42 U.S.C. 6945(d)(4). EPA can enforce 
any Federal requirements that remain in effect (i.e., those for which 
there is no corresponding approved State provision). EPA may also 
exercise its inspection and information gathering authorities under 
RCRA section 3007 in a State with an approved program. 42 U.S.C. 6927.

II. The Virginia Application

    EPA began working with VADEQ in 2019 as Virginia developed its 
application for a partial CCR permit program. EPA discussed with VADEQ 
the process for EPA to review and approve a State's CCR permit program, 
VADEQ's anticipated timeline for submitting a CCR permit program 
application to EPA, and VADEQ's regulations for issuing permits. In 
2016, 2017, and 2025, the Commonwealth incorporated by reference 40 CFR 
part 257, subpart D promulgated through December 14, 2020. See Virginia 
Register Volume 32, Issue 9, eff. January 27, 2016; amended, Virginia 
Register Volume 33, Issue 16, eff. May 3, 2017; Volume 41, Issue 9, 
eff. January 15, 2025.
    On June 6, 2025, VADEQ submitted its CCR permit program application 
to EPA Region 3 requesting approval of Virginia's partial CCR permit 
program. On September 25, 2025, EPA sent questions to VADEQ and a 
request to supplement the application. On March 4, 2026, VADEQ 
submitted an updated application to EPA Region 3.\3\ On May 4, 2026, 
EPA proposed to approve the Virginia CCR permit program (91 FR 23924).
---------------------------------------------------------------------------

    \3\ The revised Narrative Description, dated March 2026, shall 
be substituted for the original Narrative Description, dated June 
2025, as well as the 40 CFR part 257 Checklist, the Commonwealth of 
Virginia Attorney General certification, and copies of the Virginia 
Statutes, Regulations, and Guidance. All other documents submitted 
as part of the original June 6, 2025 application remain unchanged 
and are available in the docket for this action.
---------------------------------------------------------------------------

III. EPA Analysis of the Virginia Application--Basis for Approval

    RCRA section 4005(d) requires EPA to evaluate two components of a 
State CCR permitting program to determine whether it meets the standard 
for approval: the program itself, and the technical criteria that will 
be included in each permit issued under the State program. This section 
discusses EPA's review of both requirements under RCRA section 4005(d) 
and the criteria EPA uses to conduct this review.
    First, EPA must evaluate the permit program itself (or other system 
of prior approval and conditions). See 42 U.S.C. 6945(d)(1)(A) through 
(B). RCRA section 4005(d)(1)(A) directs the State to provide evidence 
of a State permit program's compliance with RCRA requirements in such 
form as determined by the Administrator. In turn, RCRA section 
4005(d)(1)(B) directs EPA to approve the State program based

[[Page 66645]]

upon a determination that the program ``requires each coal combustion 
residuals unit located in the state to achieve compliance with the 
applicable [Federal or State] criteria.'' In other words, the statute 
directs EPA to determine that the State has sufficient authority to 
require compliance at all CCR units located within the State. See also 
42 U.S.C. 6945(d)(1)(D)(ii)(I). To make this determination, EPA 
evaluates the State's authority to issue permits and impose conditions 
in those permits, as well as the State's authority to conduct 
compliance monitoring and enforcement.
    During this review of the State permit program, EPA also determines 
whether the program contains procedures consistent with the public 
participation directive in RCRA section 7004(b). RCRA section 7004(b), 
which applies to all RCRA programs, directs that ``public participation 
in the development, revision, implementation, and enforcement of any . 
. . program under this chapter shall be provided for, encouraged, and 
assisted by the Administrator and the States.'' 42 U.S.C. 6974(b)(1). 
To make this determination, EPA evaluates the State's public 
participation procedures for issuing permits and for intervention in 
civil enforcement proceedings.
    Although 40 CFR part 239 applies to the approval of State Municipal 
Solid Waste Landfill (MSWLF) programs under RCRA section 4005(c)(1) 
rather than EPA's evaluation of CCR permit programs under RCRA section 
4005(d), the specific criteria outlined in that regulation provide a 
helpful framework to examine the relevant aspects of a State's CCR 
permit program. States are familiar with these criteria because all 
States have MSWLF programs that have been approved pursuant to these 
regulations, and the regulations are generally regarded as protective 
and appropriate.
    Consequently, EPA relied on the four categories of criteria 
outlined in 40 CFR part 239 as guidelines to evaluate the Virginia CCR 
permit program: permitting requirements, requirements for compliance 
monitoring authority, requirements for enforcement authority, and 
requirements for intervention in civil enforcement proceedings.
    Second, EPA must evaluate the technical criteria that will be 
included in each permit issued under the State CCR permit program to 
determine whether they are the same as the Federal criteria, or to the 
extent they differ, whether the modified criteria are ``at least as 
protective as'' the Federal requirements. See 42 U.S.C. 6945(d)(1)(B). 
Only if both components meet the statutory requirements may EPA approve 
the program. See 42 U.S.C. 6945(d)(1). EPA makes this determination by 
comparing the State's technical criteria to the corresponding Federal 
criteria and, where necessary, evaluating whether different State 
criteria are at least as protective as the Federal criteria.
    Upon careful review, and as discussed in more detail below, EPA 
concludes that Virginia's partial CCR permit program includes all the 
necessary elements to be approved as a partial State CCR permit 
program. It also contains all the technical criteria in 40 CFR part 
257, subpart D, except for the provisions specifically discussed below 
that Virginia has not included in its partial CCR permit program. 
Consequently, EPA is approving the majority of Virginia's partial CCR 
permit program application. The State's CCR permit program does not 
encompass the full scope of Federal CCR requirements as presently 
constituted, and the provisions of the Federal CCR regulations that are 
not part of Virginia's approved CCR permit program will remain directly 
applicable to affected CCR units. 42 U.S.C. 6945(d)(1)(B).
    EPA's full analysis of the Virginia CCR permit program, and how the 
Virginia regulations differ from the Federal requirements, can be found 
in the Technical Support Document. EPA determined that the Virginia CCR 
permit program application was complete and notified Virginia of its 
determination by letter.\4\
---------------------------------------------------------------------------

    \4\ Letter to Michael S. Rolband, Director, Virginia Department 
of Environmental Quality from Lee M. Zeldin, Administrator, USEPA 
regarding a review of the Virginia Coal Combustion Residuals Permit 
Program Application. April 30, 2026. EPA-HQ-OLEM-2025-3325-0048.
---------------------------------------------------------------------------

A. Adequacy of the Virginia Permit Program

    Section 4005(d)(1)(A) of RCRA, 42 U.S.C. 6945(d)(1)(A), requires a 
State seeking State CCR permit program approval to submit to EPA, ``in 
such form as the Administrator may establish, evidence of a permit 
program or other system of prior approval and conditions under State 
law for regulation by the State of coal combustion residuals units that 
are located in the State.'' Although the statute directs EPA to 
establish the form of such evidence, the statute does not require EPA 
to promulgate regulations governing the process or standard for 
determining the adequacy of such State programs. EPA, therefore, 
developed the Coal Combustion Residuals State Permit Program Guidance 
Document; Interim Final (82 FR 38685, August 15, 2017) (the ``Guidance 
Document''). The Guidance Document provides recommendations on a 
process and standards that States may choose to use to apply for EPA 
approval of its CCR permit programs, based on the standards in RCRA 
section 4005(d), existing regulations at 40 CFR part 239, and the 
Agency's experience in reviewing and approving State programs.
    EPA evaluated the Virginia CCR permit program using the process and 
statutory and regulatory standards discussed in sections II.C. and 
IV.A. of this preamble. EPA's findings are summarized below and 
provided in more detail in the Technical Support Document located in 
the docket supporting this proposed determination.
1. Guidelines for Permitting
    In EPA's judgment, an adequate State CCR permit program must ensure 
that: (1) Existing and new facilities are permitted or otherwise 
approved and in compliance with either 40 CFR part 257 or other State 
criteria; (2) The State has the authority to collect all information 
necessary to issue permits that are adequate to ensure compliance with 
relevant 40 CFR part 257, subpart D requirements; and (3) The State has 
the authority to impose requirements for CCR units adequate to ensure 
compliance with either 40 CFR part 257, subpart D, or such other State 
criteria that have been determined and approved by the Administrator to 
be at least as protective as 40 CFR part 257, subpart D.
    The permitting process in Virginia is undertaken by VADEQ's Land 
Protection and Revitalization Division, including staff from each of 
VADEQ's six regional offices. Coordinators within the Central Office 
Land Protection and Revitalization Division Office of Financial 
Responsibility and Waste Programs assist the regional office staff with 
consistency in permitting and compliance efforts. For a more detailed 
description of staff resources, see section IV of the Narrative 
Statement.
a. Permit Required
    Section 10.1-1408.1 A of the Virginia Waste Management Act (VWMA) 
and 9VAC20-81-40 of the Virginia Solid Waste Management Regulations 
(VSWMR) both require that no person shall operate any sanitary landfill 
or other facility for the disposal, treatment, or storage of solid 
waste without a permit from the Director of VADEQ. Applications for 
solid waste permits include three parts: the Notice of Intent (NOI), 
Part A application, and Part B application. Under 9VAC20-81-170.C of 
the VSWMR, permitted facilities

[[Page 66646]]

remain subject to a permit through and until completion of post-closure 
care requirements.
b. Permitting Authority
    VADEQ, under the Land Protection and Revitalization Division, is 
the lead agency for the permitting and oversight for the CCR permit 
program. VADEQ, under the Water Permitting Division, is also 
responsible for issuing Virginia Pollutant Discharge Elimination System 
(VPDES) permits that include calculated permit limits to ensure that 
discharges comply with water quality standards. As noted in section IV 
of VADEQ's CCR Permit Program Narrative Description, Virginia's 
Department of Conservation and Recreation (DCR) Dam Safety Program is 
responsible for oversight of impounding structures associated with 
surface impoundments.
c. Permit Requirements and Permitting Process
    Virginia adopted 40 CFR part 257, subpart D by reference (9VAC20-
81-800) and established permitting procedures for CCR landfills and CCR 
surface impoundments (9VAC20-81-450). Applications for solid waste 
permits include three parts: the NOI, Part A application, and Part B 
application. The NOI initiates the permit application and consists of 
documents centered on local government approvals. The Part A 
application, often submitted with the NOI, includes an assessment of 
site suitability of the proposed facility, as well as a permit 
application letter which defines the physical boundaries (waste 
management boundary, maximum and minimum design elevations, and total 
disposal capacity) acceptable for waste management activities 
determined after taking into consideration all siting requirements. The 
Part B application includes the proposed design, operation, monitoring, 
closure, and postclosure care plans for the proposed facility. The 
resulting permit sets limits on site design, wastes accepted, 
recordkeeping and reporting, financial assurance, and incorporates any 
necessary schedules of compliance. The permit issuance grants approval 
to build the disposal facility; however, a Certificate to Operate is 
required to begin accepting waste. See 9VAC20-81-490. The permit is 
issued for the life of the facility (through termination of postclosure 
care) and must be modified over time to remain current and/or to adjust 
for modifications to design, operation, monitoring, closure, and 
postclosure care.
    EPA determined that the Virginia approach to CCR permit 
applications and approvals is adequate, and that this aspect of the 
Virginia CCR permit program meets the standard for program approval.
2. Guidelines for Public Participation
    Based on RCRA section 7004, 42 U.S.C. 6974, it is EPA's judgment 
that an adequate State CCR permit program will ensure that: (1) 
Documents for permit determinations are made available for public 
review and comment; (2) Final determinations on permit applications are 
made known to the public; and (3) Public comments on permit 
determinations are considered and significant comments are responded to 
in the permit record. EPA's review of Virginia's CCR permit program 
indicates that the State has adopted public participation procedures 
that allow interested parties to talk openly and frankly about permit 
issues and search for mutually agreeable solutions to differences in 
views. An overview of Virginia's public participation provisions is 
provided below.
a. Public Notice and Participation in the CCR Permit Application 
Process
    Applications for new CCR permits are treated as a new solid waste 
permit, in accordance with 9VAC20-81-450 E. If the application is found 
to be technically adequate and in full compliance with the VSWMR, a 
draft permit is developed. The draft permit is available for public 
review at the local VADEQ regional office, and it is VADEQ practice to 
place a digital or hard copy of the application in a local library. 
Announcement of the availability of the draft permit, public comment 
period, and date, time, and location of a public hearing are made in a 
public notice published in a local newspaper and posted on VADEQ's 
website and the Virginia Regulatory Town Hall website. The regulation 
requires a public comment period of no less than 45 days due to the 
public hearing being scheduled at least 30 days following the public 
notice and the public comment period extending at least 15 days after 
the public hearing.
    Following the close of the public comment period, VADEQ reviews all 
comments (verbal and written); makes a decision to issue a permit, to 
deny a permit, or to modify the draft permit (9VAC20-81-450 E 7); and 
prepares a response to comments. The response to comments document is 
sent to the applicant and all persons who provided comments during the 
comment period. In accordance with 9VAC20-81-450 E 8, the response to 
comments document is sent out when the final permit decision is issued.
    For new permits covering existing and inactive CCR surface 
impoundments, VADEQ requires solid waste permits under 9VAC20-81-810 B 
and D. These follow the full public participation procedures for new 
solid waste permits stated above, including public notice, a public 
comment period, and a public hearing. Due to public interest in these 
draft permit actions, VADEQ maintains a Coal Ash Solid Waste Permit 
Actions web page with links to facility-specific web pages that provide 
brief summaries, application submittals, VADEQ correspondence, and the 
draft permit; after a final decision, the final permit and a response 
to comments are posted.
    For major permit modifications, when the Director proposes to 
approve a modification, VADEQ uses the same permit issuance procedures 
as for new permits pursuant to 9VAC20-81-600 F 3 d and 9VAC20-81-450 E, 
but a public hearing is not required for every major modification. If 
the modification would expand a facility or increase capacity, the 
process follows the same public participation procedures as outlined 
above for new solid waste permits. For other major modifications, at 
least a 30-day public comment period is required. When there is 
significant public interest, VADEQ may hold a public hearing and extend 
the comment period to 45 days under 9VAC20-81-450 E 4 and E 5.
    Existing CCR landfills already permitted as industrial landfills 
were required to modify their permits to incorporate CCR rule 
requirements under 9VAC20-81-810 A. These were processed as major 
modifications without mandatory hearings in accordance with 9VAC20-81-
450 E 4, reflecting that the landfills were already operating under the 
VSWMR and the CCR provisions were self-implementing. VADEQ supported 
public participation by maintaining a web page for each power station 
with summaries, submitted applications, VADEQ correspondence, draft 
permits, public comment information, and, after decisions, final 
permits and responses to comments. These web pages continue to provide 
summary information about the website and solid waste permit status. To 
facilitate permitting transparency (effective September 2023), the 
public, applicants, and their consultants can obtain information about 
the critical steps and schedules for VADEQ solid waste permitting 
actions through the Permitting Enhancement and Evaluation Platform 
(PEEP) and monitor permitting across multiple State agencies on permit 
status and timelines via the Virginia Permit Transparency (VPT) 
website.

[[Page 66647]]

b. Challenges to Permit Decisions
    Final permit decisions are subject to appeal in accordance with the 
Administrative Process Act, Chapter 40 of the Code of Virginia 
(Sec. Sec.  2.2-4000 through 2.2-4033). A major modification to a CCR 
unit permit is subject to appeal through the same process described 
above.
    EPA determined that the Virginia approach to public participation 
requirements provides adequate opportunities for public participation 
in the permitting process sufficient to meet the standard for program 
approval. The provisions described above meet the three criteria listed 
at the beginning of this section by providing several means by which 
documents for draft and final permit determinations are made available 
for public review and comment, as well as ensuring that public comments 
on permit determinations are considered and significant comments are 
responded to in the permit record.
3. Guidelines for Compliance Monitoring Authority
    An adequate permit program must provide the State with the 
authority to gather information about compliance, perform inspections, 
and ensure that the information it gathers is suitable for enforcement. 
Section 10.1-1456 of the Code of Virginia authorizes the Director of 
VADEQ, or his designee, the right to conduct inspections ``to determine 
whether the provisions of any law administered by the Board, Director 
or Department, any regulations of the Board, any order of the Board or 
Director or any conditions in a permit, license or certificate issued 
by the Board or Director are being complied with.''
    The State has authorities and guidelines for inspections, analysis 
and monitoring, which allow the State to: (1) Verify the accuracy of 
information submitted by owners or operators of the CCR unit; (2) 
Verify the adequacy of methods (including sampling) used by owners or 
operators in developing that information; (3) Produce evidence 
admissible in an enforcement proceeding; and (4) Receive and ensure 
proper consideration of information submitted by the public. Compliance 
with permit conditions and associated documents will be assessed by 
VADEQ inspectors and permitting staff. Virginia's laws and regulations, 
both Sec.  10.1-1409 B 4 of the Code of Virginia and 9VAC20-81-600, 
authorize the Director to amend permits to meet applicable regulatory 
requirements. Both permits issued and regulations promulgated by the 
Board are enforceable under Virginia State law (Sec.  10.1-1455 C of 
the Code of Virginia).
    It is VADEQ regional staff's practice to inspect these facilities 
at least once each year. VADEQ has maintained a summary Coal Ash Solid 
Waste Permit Actions web page. 9VAC20-81-10 et seq. This page contains 
links to CCR facility-specific web pages for CCR sites with current 
permitting actions, with each page containing a brief facility summary, 
application submittals, VADEQ correspondence, the draft permit, and, 
following a final permit decision, the final permit and response to 
comments.
    Accordingly, EPA determined that these compliance monitoring 
authorities are adequate, and that this aspect of the Virginia CCR 
permit program meets the standard for program approval.
4. Guidelines for Enforcement Authority
    An adequate State CCR permit program must provide the State with 
adequate enforcement authority to administer its State CCR permit 
program, including the authority to: (1) Restrain any person from 
engaging in activity which may damage human health or the environment, 
(2) Sue to enjoin prohibited activity, and (3) Sue to recover civil 
penalties for prohibited activity.
    Administrative and judicial enforcement capabilities to ensure 
compliance, including enforcement of orders and permit conditions and 
imposition of penalties, are provided by Sec.  10.1-1455 of the Code of 
Virginia. Section 10.1-1402 of the Code of Virginia authorizes and 
directs the Board to adopt solid waste management regulations and 
standards necessary to protect public health and environment and issue 
permits and orders.
    Based on the foregoing, EPA determined that this aspect of the 
Virginia CCR permit program meets the standard for program approval.
5. Intervention in Civil Enforcement Proceedings
    Based on RCRA section 7004, an adequate CCR State permit program 
must provide an opportunity for citizen intervention in civil 
enforcement proceedings. Specifically, the State must either: (1) 
Provide for citizen intervention as a matter of right; or (2) Have in 
place a process to: (a) Provide notice and opportunity for public 
involvement in civil enforcement actions, (b) Investigate and provide 
responses to citizen complaints about violations, and (c) Not oppose 
citizen intervention when permissive intervention is allowed by 
statute, rule, or regulation.
    Public participation in the compliance evaluation and enforcement 
programs is encouraged by VADEQ under 9VAC20-81-70 of the VSWMR. It is 
the department's practice to: (1) Investigate all citizen complaints 
and provide written responses to all signed, written complaints from 
citizens, concerning matters within the Virginia Waste Management 
Board's purview; (2) Not oppose intervention by any citizen in a suit 
brought before a court by the department as a result of the enforcement 
action; and (3) Provide notice on the department's internet website; 
and provide at least 30 days of public comment on proposed settlements 
of civil enforcement actions except where the settlement requires some 
immediate action. Where a public comment period is not held prior to 
the settlement of an enforcement action, public notice will still be 
provided following the settlement. 9VAC20-81-70.
    EPA determined that these authorities provide for an adequate level 
of citizen involvement in the enforcement process, and that this aspect 
of the Virginia CCR permit program meets the standard for program 
approval.

B. Adequacy of Technical Criteria

    EPA conducted an analysis of the Virginia CCR permit program 
application, including a thorough analysis of Virginia statutory 
authorities at Sec.  10.1-1402 of the Code of Virginia for the CCR 
program, as well as its regulations at 9VAC20-81-10 et seq. As noted 
above, Virginia has requested approval of a partial CCR permit program.
1. Virginia CCR Units and Resources
    VADEQ has identified 25 CCR units (7 landfills and 18 surface 
impoundments) at 8 facilities in Virginia.\5\ The VADEQ demonstrated 
that it has the personnel to administer a permit program that is at 
least as protective as the Federal requirements.\6\ VADEQ indicates 
that the Virginia program is funded by Virginia general funds 
appropriated to VADEQ. In addition, VADEQ applied for EPA's State and 
Tribal Assistance Grants (STAG) funding for Fiscal Years 2023 through 
2025. In total, VADEQ has received $571,396.00 in funding to develop 
its CCR permit program. If EPA

[[Page 66648]]

receives future appropriations, if approved, VADEQ will be eligible to 
receive funds for implementation of its CCR permit program. EPA 
determined that the VADEQ staffing and funding are adequate for VADEQ 
to administer the CCR permit program.
---------------------------------------------------------------------------

    \5\ For more information on the specific facilities covered by 
the Virginia CCR Permit Program, see pages 8-9 of the Narrative 
Description, which is included in the docket for this action.
    \6\ The discussion on State personnel is included in sections 
II, IV, and VI of the Narrative Description, which is included in 
the docket for this action, and is described further in the 
Technical Support Document.
---------------------------------------------------------------------------

2. Virginia CCR Regulations
    EPA determined that the portions of the Virginia CCR permit program 
that were submitted for approval meet the standard for approval under 
RCRA section 4005(d)(1)(B)(i), 42 U.S.C. 6945(d)(1)(B)(i). To make this 
determination, EPA compared the technical requirements in the Virginia 
CCR regulations at 9VAC20-81-800 et seq. to the Federal CCR regulations 
at 40 CFR part 257 to determine whether they differed from the Federal 
requirements, and if so, whether those differences met the standard in 
RCRA sections 4005(d)(1)(B)(ii) and (C), 42 U.S.C. 6945(d)(1)(B)(ii) 
and (C).
    Prior to incorporation of the Federal CCR regulations, the VSWMR 
regulated CCR landfills as industrial landfills. Under the VSWMR, 
industrial landfills are required to have solid waste permits and 
conform to siting, design/construction, operation, monitoring, closure, 
and postclosure care requirements specific to industrial landfills. 
Following incorporation of the Federal CCR requirements, CCR landfills 
are designated as a subset of industrial landfills under the VSWMR and 
the landfills will be subject to both existing requirements for 
industrial landfills and newly incorporated requirements for CCR 
landfills. CCR surface impoundments were previously regulated under the 
State Water Control Law, which allowed closure of impoundments in 
accordance with water pollution control regulations.
    Virginia incorporated 40 CFR part 257, subpart D into the VSWMR by 
reference effective January 27, 2016 (9VAC20-81-800). Virginia also 
incorporated amendments to 40 CFR part 257, subpart D as a result of 
the 2016 direct final rule (81 FR 51802, August 5, 2016) into the VSWMR 
by reference, effective May 3, 2017. Since 2016, EPA has made 
additional amendments to the 2015 CCR rule. Virginia incorporated all 
amendments of 40 CFR part 257, subpart D promulgated through December 
14, 2020, into the VSWMR by reference, effective January 15, 2025.
    The regulatory incorporation by reference of the Federal CCR 
regulations does not incorporate the Participating State Director 
approval option; reserves 40 CFR 257.50(e); does not incorporate the 
vacated six-inch vegetative height requirement in 40 CFR 257.73 and 
257.74; and does not incorporate 40 CFR 257.90(g). The only changes to 
the CCR rule language that Virginia changed as part of incorporation 
were to note that the term ``Director'' shall supplant ``State 
Director'' wherever it appears and that ``qualified professional 
engineer'' or ``engineer'' means a ``professional engineer'' certified 
to practice in the Commonwealth of Virginia as defined in 9VAC20-81-10.
3. Virginia Partial Program
    VADEQ is seeking approval of its partial CCR permit program 
pursuant to RCRA section 4005(d). Virginia's CCR regulations reflect 40 
CFR part 257, subpart D, as amended through December 14, 2020; however, 
the Federal CCR regulations have changed since then as a result of 
ongoing developments, the Legacy CCR surface impoundments and CCR 
management units final rule (89 FR 38985, May 8, 2024) (the 2024 Legacy 
Rule), and the CCR Management Unit Deadline Extension Rule (91 FR 5806, 
February 10, 2026). VADEQ has not adopted regulations reflecting the 
2024 or 2026 changes. Therefore, VADEQ has not sought approval of any 
State regulations that would operate in lieu of these amendments. EPA 
is approving only those aspects of Virginia's CCR program that were 
submitted for approval.
    In the 2024 Legacy Rule, EPA amended certain terms and provisions 
that apply to all CCR units. It is EPA's understanding that VADEQ 
interprets the provisions in 9VAC20-81-800 the same as EPA interprets 
the corresponding provisions in 40 CFR part 257, subpart D. Therefore, 
EPA is approving the State's version of the following requirements:
    1. Throughout 40 CFR part 257, subpart D, the regulations were 
amended by removing the phrase ``Web site'' and adding in its place the 
word ``website'' wherever it appears.
    2. 40 CFR 257.50(c); this amendment revises the scope of 
applicability to specify that it includes inactive CCR surface 
impoundments at utilities or power producers regardless of how 
electricity is currently being produced at the facility.
    3. 40 CFR 257.51; this section was reserved, as the effective date 
of 40 CFR part 257, subpart D, October 19, 2015, has passed.
    4. 40 CFR 257.52; this amendment clarifies that all CCR units are 
subject to the requirement to comply with all other Federal, State, 
Tribal, or local laws or other requirements. In addition, all CCR units 
continue to be subject to 40 CFR 257.3-1, 257.3-2, and 257.3-3.
    5. ``Active facility or active electric utilities or independent 
power producers''; this amendment to 40 CFR 257.53 clarifies that the 
relevant operational date for any active facility or active electric 
utilities or independent power producers is on or after October 19, 
2015.
    6. ``CCR landfill or landfill''; this amendment to 40 CFR 257.53 
clarifies that a CCR landfill means an area of land or an excavation 
that ``contains'', rather than ``receives'', CCR, and meets the other 
criteria of the definition.
    7. ``CCR surface impoundment or impoundment''; this amendment to 40 
CFR 257.53 deleted the words ``which is''.
    8. ``CCR unit''; this amendment to 40 CFR 257.53 clarifies that 
this term includes legacy CCR surface impoundments and CCRMU.
    9. ``Contains both CCR and liquids''; this additional definition in 
40 CFR 257.53 is consistent with the term's plain meaning and 
dictionary definitions as this term used in the closure performance 
standard in 40 CFR 257.102(d)(2)(i) for CCR surface impoundments.
    10. ``Inactive CCR surface impoundment'', this amendment to 40 CFR 
257.53 clarifies that this term is applicable to such CCR surface 
impoundments ``located at an active facility.''
    11. ``Infiltration''; this additional definition in 40 CFR 257.53 
is consistent with the term's plain meaning and dictionary definitions 
to assist in the application of closure performance standards for CCR 
units.
    12. ``Liquids''; this additional definition in 40 CFR 257.53 is 
consistent with the term's plain meaning and dictionary definitions to 
assist in the applicability for CCR surface impoundments and the 
application of closure performance standards for CCR units.
    13. ``State director''; this amendment to 40 CFR 257.53 clarifies 
that the State director is the chief administrative officer of the lead 
State agency responsible for implementing the State program regulating 
disposal in all CCR units.
    14. ``Technically feasible or feasible''; this amendment to 40 CFR 
257.53 clarifies that certain requirements of 40 CFR part 257, subpart 
D refer only to feasible rather than technically feasible. The 
amendment ensures that these terms are interpreted in the same way.
    15. ``Technically infeasible or infeasible''; this amendment to 40 
CFR 257.53 clarifies that certain requirements of 40 CFR part 257, 
subpart D refer only to infeasible rather

[[Page 66649]]

than technically infeasible. The amendment ensures that these terms are 
interpreted in the same way.
    16. 40 CFR 257.61(a); this amendment updates a reference to 40 CFR 
230.41(a), as the previously referenced provision has since been 
amended.
    17. 40 CFR 257.80(a); this amendment clarifies that all CCR units 
are subject to the fugitive dust requirements.
    18. 40 CFR 257.90(a); this amendment clarifies that all CCR units 
are subject to the groundwater monitoring and corrective action 
requirements. In addition, it corrects a typographical error.
    19. 40 CFR 257.100(a)(1); this amendment clarifies that inactive 
CCR surface impoundments, regardless of how the facility produces 
electricity through non-fuels, are subject to the same compliance 
deadlines applicable to existing CCR surface impoundments, subject to 
certain requirements.
    20. 40 CFR 257.104(a); this amendment clarifies that all owners or 
operators of CCR units that are subject to 40 CFR 257.102 are subject 
to the post-closure care requirements, except for those owners and 
operators of a CCR unit that elect to close the CCR unit by removing 
CCR.
    The following list identifies amendments to the requirements in 40 
CFR part 257, subpart D that were not included in Virginia's 
application. First, these Federal CCR regulations will continue to 
apply directly to, and remain Federally enforceable for, each CCR unit 
in Virginia. This means that the requirements in 9VAC20-81-800 that do 
not meet the standard for approval as of the date of the Proposed 
Approval, as enumerated below, are not being approved:
    1. 40 CFR 257.73(a)(4), 257.73(d)(1)(iv), 257.74(a)(4), and 
257.74(d)(1)(iv) for vegetative cover for slope stability;
    2. 40 CFR 257.90(g) for suspension of groundwater monitoring; and
    3. 40 CFR 257.95(h)(2) for groundwater protection standards for 
constituents in appendix IV having no Maximum Contaminant Levels. VADEQ 
sought approval for this provision, but it was challenged in court and 
is under reconsideration by the Agency; therefore, EPA is not able to 
approve this provision;
    Second, EPA amended certain provisions of the Federal CCR 
regulations in the 2024 Legacy Rule that apply to all CCR units and are 
more prescriptive than the requirements in the 2015 CCR Rule. VADEQ did 
not adopt these amendments and did not seek approval of these 
provisions. Thus, the following Federal provisions will be applicable 
to CCR units in Virginia:
    1. ``Operator''; this amendment to 40 CFR 257.53 specifies the 
definition of operator to include certain other person(s) including 
those responsible for disposal or otherwise actively engaged in the 
solid waste management of CCR and person(s) responsible for directing 
or overseeing groundwater monitoring, closure or post-closure 
activities at a CCR unit.
    2. ``Owner''; this amendment to 40 CFR 257.53 broadened the 
definition of owner to include person(s) who own a facility, whether in 
full or in part.
    3. 40 CFR 257.80(b)(6); this amendment specifies that the owner or 
operator must amend the written fugitive dust control plan no later 
than 30 days whenever there are certain changes in condition.
    4. 40 CFR 257.102(c)(2); this amendment specifies the criteria for 
complete removal and decontamination activities during the active life 
and post-closure care period of a CCR unit.
    5. 40 CFR 257.102(d)(2); this amendment specifies that the closure 
performance standards for drainage and stabilization of a unit when 
leaving CCR in place apply to all CCR units, including CCR management 
units (CCRMU) and CCR landfills, where free liquids remain in the unit.
    6. 40 CFR 257.102(f)(2)(ii)(C) and(D); these amendments specify 
that CCR landfills that intersect with groundwater are eligible for the 
closure time extensions available to CCR surface impoundments, subject 
to certain requirements.
    7. 40 CFR 257.104(a)(2), (c)(1) and (3); these amendments specify 
that an owner or operator closing a CCR unit pursuant to the closure by 
removal and decontamination standards during the active life and post-
closure care period, 40 CFR 257.102(c)(2), must complete groundwater 
corrective action.
    8. 40 CFR 257.104(g); this amendment specifies that a deed 
notation, required pursuant to 40 CFR 257.102(i), may be removed after 
the owner or operator demonstrates that groundwater monitoring 
concentrations no longer exceed any protection standard (i.e., the unit 
must be in detection monitoring) and certain notifications of 
completion of post-closure care are completed.
    9. 40 CFR 257.105(a); this amendment specifies that each file in 
the operating record must indicate the date the file was placed in the 
record.
    10. 40 CFR 257.105(e); (f)(1) through (14); (f)(19); (g); (h)(1) 
through (4); (h)(10) through (11); (h)(13) through (14); (i)(4) through 
(20); these amendments extend the retention times for certain documents 
maintained in the operating record.
    11. 40 CFR 257.107(b); this amendment specifies that owners and 
operators using one website to meet the requirements of multiple 
environmental rules must delineate the postings for each regulatory 
program under a separate heading on the combined website.
    12. 40 CFR 257.107(e); (f)(1) through (4); (f)(6) through (13); 
(f)(18); (g); (h)(1) through (3); (h)(8); (h)(10) through (11); (i)(4) 
through (20); these amendments extend the retention times for certain 
documents maintained on the facility's CCR website.
    Third, in the 2024 Legacy Rule, EPA added requirements for legacy 
CCR surface impoundments and amended certain requirements in the 2026 
CCR Management Unit Deadline Extension Rule. VADEQ did not adopt these 
amendments. Thus, any legacy CCR surface impoundments in Virginia will 
remain subject to the following Federal CCR regulations:
    1. 40 CFR 257.50(e); this amended provision specifies that 40 CFR 
part 257, subpart D applies to electric utilities or independent power 
producers that ceased producing electricity prior to October 19, 2015, 
and have a legacy CCR surface impoundment onsite.
    2. ``Inactive facility or inactive electric utility or independent 
power producer''; this added definition to 40 CFR 257.53 specifies the 
facility where legacy CCR surface impoundments are located.
    3. ``Legacy CCR surface impoundment''; this added definition to 40 
CFR 257.53 specifies a new type of CCR unit that meets certain 
criteria.
    4. 40 CFR 257.100(a)(2); EPA amended 40 CFR 257.100(a) to add 
paragraph (2), which specifies that legacy CCR surface impoundments are 
subject to all of the requirements applicable to existing CCR surface 
impoundments, except for the requirements in 40 CFR 257.60 through 
257.64 and 257.71.
    5. 40 CFR 257.100(f) through (j); these additional provisions 
include reporting and technical requirements for legacy CCR surface 
impoundments.
    6. 40 CFR 257.101(e); this added provision specifies the deadlines 
when owners or operators of legacy CCR surface impoundments must 
initiate closure.
    7. 40 CFR 257.101(g); this added provision specifies requirements 
for deferral to permitting for closures conducted under substantially 
equivalent regulatory authority.
    8. 40 CFR 257.102(e)(4)(vi) and (vii); these amended provisions 
clarify that legacy CCR surface impoundments and

[[Page 66650]]

CCRMU are not eligible for the idling provisions under the criteria for 
conducting closure or retrofit of CCR units in 40 CFR 257.102(e).
    9. 40 CFR 257.102(f)(1)(ii); this amended the closure provisions to 
include legacy CCR surface impoundments to the list of CCR units that 
are provided five years to complete closure.
    10. 40 CFR 257.105(k), 257.106(k), and 257.107(k); these added 
provisions specify recordkeeping, notification, and CCR website posting 
requirements for legacy CCR surface impoundments.
    Fourth, in the 2024 Legacy Rule, EPA also added requirements for 
CCR management units and amended certain requirements in the 2026 CCR 
Management Unit Deadline Extension Rule. VADEQ did not adopt these 
provisions. Thus, any CCR management units in Virginia will remain 
subject to the following Federal CCR regulations:
    1. 40 CFR 257.50(d); this amended provision specifies the scope of 
CCRMU requirements.
    2. ``CCR management unit''; this additional definition in 40 CFR 
257.53 is for a new type of CCR unit.
    3. ``Closed prior to October 19, 2015''; this additional definition 
in 40 CFR 257.53 specifies the applicability of CCR landfills or 
surface impoundments that completed closure of the unit in accordance 
with State law prior to October 19, 2015.
    4. ``Critical infrastructure''; this additional definition in 40 
CFR 257.53 specifies infrastructure, large buildings, or other 
structures vital to the success or continuation of current site 
operations or activities for the public welfare. Under the Federal CCR 
regulations, CCRMU located under critical infrastructure have the 
option to defer certain requirements to permitting.
    5. ``Inactive CCR landfill''; this additional definition in 40 CFR 
257.53 is for a new type of CCR unit related to CCRMU.
    6. ``Regulated CCR unit''; this additional definition in 40 CFR 
257.53 is a conforming change, which means any new CCR landfill, 
existing CCR landfill, new CCR surface impoundment, existing CCR 
surface impoundment, inactive CCR surface impoundment, or legacy CCR 
surface impoundment. This term specifies that CCRMU are not considered 
regulated CCR units.
    7. 40 CFR 257.75; this additional section includes requirements for 
identifying CCRMU.
    8. 40 CFR 257.90(b)(3); this additional provision specifies a 
deadline for the owners and operators of CCRMU to comply with certain 
groundwater monitoring requirements.
    9. 40 CFR 257.90(e); EPA amended one sentence in this provision to 
add an annual groundwater monitoring and corrective action report 
deadline for CCRMU. VADEQ has not adopted this amendment, see 9VAC20-
81-800. Therefore, the majority of this provision, as adopted by VADEQ 
based on the December 14, 2020 version of 40 CFR 257.90(e), is approved 
for VADEQ to administer, but the added deadline for CCRMU will remain 
the applicable criteria for CCRMU in Virginia and any CCRMU in Virginia 
will remain subject to the Federal CCR regulations.
    10. 40 CFR 257.95(b); this amended provision adds a deadline for 
CCRMU to sample and analyze the groundwater for all constituents in 40 
CFR part 257, appendix IV.
    11. 40 CFR 257.101(f); this additional provision specifies the 
deadlines when CCRMU must initiate closure.
    12. 40 CFR 257.101(g) and (h); these include additional 
requirements for deferral to permitting for closures conducted under 
substantially equivalent regulatory authority and under critical 
infrastructure.
    13. 40 CFR 257.102(b)(2)(iii) and (v); these amended provisions 
renumber paragraph (b)(2)(iii) to (iv) and add new paragraphs 
(b)(2)(iii) and (v). The added provisions are only applicable to CCRMU.
    14. 40 CFR 257.102(f)(1)(iii); this additional provision specifies 
when CCR management units must complete closure activities.
    15. 40 CFR 257.102(f)(2)(ii)(E) and (F); these additional 
provisions specify when CCR management units may extend the complete 
closure activities.
    16. 40 CFR 257.104(d)(2)(iii); these amended provisions renumber 
paragraph (d)(2)(iii) to (iv) and add a new paragraph (d)(2)(iii). This 
added provision is only applicable to CCRMU.
    17. 40 CFR 257.105(f)(25) and (26), 40 CFR 257.106(f)(24) and (25), 
40 CFR 257.107(f)(24) and (25); these include additional recordkeeping, 
notification, and CCR website posting provisions for CCRMU.
    EPA determined that the Virginia CCR regulations contain all of the 
technical elements of the Federal CCR regulations, including 
requirements for location restrictions, design and operating criteria, 
groundwater monitoring and corrective action, closure requirements and 
post-closure care, recordkeeping, notification, and CCR website posting 
requirements. The Virginia CCR permit program also contains State-
specific language, references, definitions, and State-specific 
requirements that differ from the Federal CCR regulations, but which 
EPA has determined to be ``at least as protective as'' the Federal 
criteria. These State-specific requirements are also discussed further 
in sections III.1. and V. of the Technical Support Document.
    The effect of approving a State CCR permit program is that, except 
for the provisions for which EPA has not granted approval, the Virginia 
CCR permit program will apply in lieu of the Federal CCR regulations.

C. Virginia CCR Permits

    Pursuant to Virginia's CCR regulations, the owner or operator of 
existing CCR landfills and impoundments will comply with State 
regulations that incorporate 40 CFR part 257, subpart D. 9VAC20-81-810. 
This section required owners and operators of all CCR units to submit 
permit applications to VADEQ by October 17, 2017. All owners and 
operators of CCR units within the Commonwealth applied for a modified 
permit. Subsequently, VADEQ issued permits to the owners and/or 
operators of all CCR units in the Commonwealth.
1. Virginia's Permits Issued Under the Commonwealth CCR Regulations Are 
Not Part of the Permit Program Evidence Under Review
    On June 6, 2025, VADEQ submitted its partial CCR permit program 
application and requested approval of Virginia's partial CCR permit 
program. On September 25, 2025, EPA sent comments to VADEQ and 
requested that VADEQ ``Please prepare, in writing, a statement 
indicating if Virginia DEQ would like EPA to review any previously 
issued or pending CCR landfill or CCR surface impoundment permits to 
ensure the permits align with the Federal requirements. EPA can review 
the existing permits as part of this program review or can review them 
as part of a future program review. See 42 U.S.C. 6945(d)(1)(A), and 
(d)(1)(B).''
    On March 4, 2026, VADEQ submitted a revised partial CCR permit 
program application that indicated to EPA that it does not seek to have 
its existing permits approved as part of its partial program. On page 7 
of the Narrative Description, VADEQ stated that, ``While DEQ has issued 
solid waste permits . . . at this time DEQ is only requesting EPA's 
review and partial approval of the CCR permitting program . . . and 
that EPA review DEQ issued permits as part of a future program review . 
. . Upon federal approval of Virginia's CCR permit program, DEQ will 
initiate a review of existing solid waste permits for CCR facilities 
and modify permits

[[Page 66651]]

following the applicable procedures outlined herein.''
    VADEQ committed to review and modify these permits to ensure 
compliance with the Federally approved program, after EPA issues its 
final determination of adequacy. Therefore, EPA has treated these 
existing permits as outside the program evidence submitted for EPA 
review and thus not relevant to the present decision on the partial 
permit program. See 42 U.S.C. 6945(d)(1)(A), and (d)(1)(B). EPA is 
basing its proposed decision on information in the program application 
package, as outlined in EPA's 2017 Guidance Document,\7\ submitted by 
VADEQ on June 6, 2025, and revised on March 4, 2026.
---------------------------------------------------------------------------

    \7\ See Chapter 4--Permit Program Application Checklist.
---------------------------------------------------------------------------

2. Status of Virginia's Previously-Issued Permits Issued Under the 
Commonwealth CCR Regulations
    Because Virginia has chosen to exclude its previously-issued 
permits from the scope of its permit program application, those permits 
also would not become effective under RCRA as a consequence of this 
final approval. Thus, any permits issued prior to EPA's approval of 
Virginia's partial program will not provide facilities with the Federal 
permit shield in RCRA sections 4005(d)(3) and (d)(6). 42 U.S.C. 
6945(d)(3) and (d)(6). Instead, these permits will only become a part 
of Virginia's approved program and give rise to the Federal permit 
shield after a major modification is completed ``in accordance with'' 
the approved program, including providing a public notice and comment 
period on the entirety of each CCR permit. 42 U.S.C. 6945(d)(6)(A). 
Similarly, RCRA section 4005(d)(3)(A) makes clear that in the absence 
of a permit ``under'' an approved State program, facilities must comply 
with the Federal CCR regulations. EPA intends to review the modified 
permits in conjunction with the program review required by RCRA section 
4005(d)(1)(D)(i) and 4005(d)(1)(D)(ii). 42 U.S.C. 6945(d)(1)(D)(i) and 
(ii).

IV. EPA Responses to Comments on the Proposed Determination

    EPA announced its proposal to approve Virginia's partial CCR permit 
program, and a 60-day public comment period on May 4, 2026 (91 FR 
23924). EPA also held a public hearing on June 24, 2026. The public 
hearing provided interested persons the opportunity to present 
information, views, or arguments concerning EPA's proposal.\8\ EPA 
received 14 written public comments and no additional comments during 
the public hearing.
---------------------------------------------------------------------------

    \8\ Public Hearing on Proposed Approval of the Virginia CCR 
Permit Program (Via VTC Platform/Webinar). June 24, 2026. EPA-HQ-
OLEM-2025-3325-0049.
---------------------------------------------------------------------------

    EPA received several comments that support approval of Virginia's 
CCR permit program and VADEQ's ability to administer the program. The 
comments encouraged continued expedited approval of state programs by 
focusing on the program and not evaluating already issued permits. Some 
commenters want VADEQ to rapidly adopt new revisions as they become 
available. Several commenters argued that EPA must consider the 
performance of VADEQ in administering the program. The commenters 
allege that VADEQ has demonstrated that it cannot be relied upon to 
adequately implement the program. These comments rely on language from 
the 2024 Alabama Program Denial (89 FR 48774, June 7, 2024) and 
judicial opinions on certain CCR court cases to support their position. 
The commenters provided detailed concerns about CCR facilities in 
Virginia. Commenters also raised questions regarding certain 
definitions that are different from the federal regulations and the 
adequacy of public participation. EPA also received several comments 
expressing concerns over CCR contamination of the environment, concerns 
that VADEQ would not properly implement the program. EPA's responses to 
individual comments are provided in the Response to Comments document 
included in the docket for this Action.\9\
---------------------------------------------------------------------------

    \9\ Comment Summary and Response Document, Virginia Coal 
Combustion Residuals State Permit Program Approval. October 2026. 
EPA-HQ-OLEM-2025-3325.
---------------------------------------------------------------------------

V. Approval of the Virginia CCR Permit Program

    The partial Virginia CCR permit program, as described in its 
Application and Units II and III of this preamble, is approved. Because 
this is a partial program approval, only the State requirements that 
have been approved will operate in lieu of the analogous Federal 
requirements. Accordingly, owners and operators of CCR units in 
Virginia will remain responsible for compliance with all applicable 
requirements in 40 CFR part 257 for which Virginia did not seek 
approval that are listed in Unit III.B. EPA will implement these 
provisions under the Federal CCR program, until and unless Virginia 
submits a revised CCR permit program application and receives approval 
for these provisions. A permit issued by a State is not a shield for 
noncompliance with these 40 CFR part 257 provisions. For all CCR units 
in the State, the Federal regulations at 40 CFR part 257 will remain in 
effect until such time that VADEQ permits those units under its 
approved CCR permit program after providing an opportunity to comment 
on the entire permit consistent with the process required for new 
permits.
    RCRA section 4005(d)(1)(D) specifies that EPA will review a State 
CCR permit program:
    <bullet> From time to time, as the Administrator determines 
necessary, but not less frequently than once every 12 years;
    <bullet> Not later than three years after the date on which the 
Administrator revises the applicable criteria for CCR units under part 
257 of title 40, CFR (or successor regulations promulgated pursuant to 
RCRA sections 1008(a)(3) and 4004(a));
    <bullet> Not later than one year after the date of a significant 
release (as defined by the Administrator), that was not authorized at 
the time the release occurred, from a CCR unit located in the State; 
and
    <bullet> In request of any other State that asserts that the soil, 
groundwater, or surface water of the State is or is likely to be 
adversely affected by a release or potential release from a CCR unit 
located in the State for which the program was approved.
    RCRA section 4005(d)(4)(B) also provides that in a State with an 
approved CCR permitting program, the Administrator may commence an 
administrative or judicial enforcement action under RCRA section 3008 
if:
    <bullet> The State requests that the Administrator provide 
assistance in the performance of an enforcement action; or
    <bullet> After consideration of any other administrative or 
judicial enforcement action involving the CCR unit, the Administrator 
determines that an enforcement action is likely to be necessary to 
ensure that the CCR unit is operating in accordance with the criteria 
established under the State's permit program.

VI. Final Action

    In accordance with 42 U.S.C. 6945(d), EPA is approving the Virginia 
partial CCR permit program.

Lee Zeldin,
Administrator.
[FR Doc. 2026-21622 Filed 10-21-26; 8:45 am]
BILLING CODE 6560-50-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on October 22, 2026.