Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to 4.2 GHz Band
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
In this document, the Federal Communications Commission (Commission) announces that the Office of Management and Budget (OMB) has approved the information collection requirements under OMB Control Number 3060-1272, as adopted in the Commission's Report and Order, Order of Proposed Modification, and Order on Reconsideration, FCC 26- 46.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 200 (Monday, October 19, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 200 (Monday, October 19, 2026)]
[Rules and Regulations]
[Pages 66010-66011]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-21324]
=======================================================================
-----------------------------------------------------------------------
FEDERAL COMMUNICATIONS COMMISSION
47 CFR Part 27
[GN Docket Nos. 18-122 and 25-59; FCC 26-46; FR ID 372601]
Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to
4.2 GHz Band
AGENCY: Federal Communications Commission.
ACTION: Final rule; announcement of effective date.
-----------------------------------------------------------------------
SUMMARY: In this document, the Federal Communications Commission
(Commission) announces that the Office of Management and Budget (OMB)
has approved the information collection requirements under OMB Control
Number 3060-1272, as adopted in the Commission's Report and Order,
Order of Proposed Modification, and Order on Reconsideration, FCC 26-
46.
DATES: Amendatory instructions 26 (47 CFR 27.1412(e)) and 35 (47 CFR
27.1419), published at 91 FR 48700, July 31, 2026, are effective on
October 19, 2026.
FOR FURTHER INFORMATION CONTACT: Cathy Williams, Office of the Managing
Director, Federal Communications Commission, at (202) 418-2918 or
<a href="/cdn-cgi/l/email-protection#f4b795809c8ddaa39d98989d959987b4929797da939b82"><span class="__cf_email__" data-cfemail="ecaf8d988495c2bb858080858d819fac8a8f8fc28b839a">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION: This document announces that OMB approved
the information collection requirements in 47 CFR 27.1412(e) and
27.1419 on September 21, 2026. The Commission publishes this document
as an announcement of the effective date for these amended rules.
Synopsis
As required by the Paperwork Reduction Act of 1995 (44 U.S.C.
3507), the Commission is notifying the public that it received final
OMB approval on September 21, 2026, for the information collection
requirements contained in 47 CFR 27.1412(e) and 27.1419. Under 5 CFR
part 1320, an agency may not conduct or sponsor a collection of
information unless it displays a current, valid OMB Control Number.
No person shall be subject to any penalty for failing to comply
with a collection of information subject to the Paperwork Reduction Act
that does not display a current, valid OMB Control Number. The OMB
Control Number for this information collection is 3060-1272. The
foregoing notice is required by the Paperwork Reduction Act of 1995,
Public Law 104-13, October 1, 1995, and 44 U.S.C. 3507.
The total annual reporting burdens and costs for the respondents
are as follows:
OMB Control Number: 3060-1272.
Title: 3.7 GHz Band Space Station Operator Transition Plans; 3.7
GHz
[[Page 66011]]
Band Incumbent Earth Station Lump Sum Payment Elections.
OMB Approval Date: September 21, 2026.
OMB Expiration Date: March 31, 2027.
Form Number: N/A.
Respondents: Business or other for-profit entities.
Estimated Number of Respondents and Responses: 3,003 respondents
and 3,003 responses.
Estimated Hours per Response: 2,720 hours per eligible space
station transition plan; 32 hours per incumbent earth station lump sum
payment election.
Frequency of Response: One-time reporting requirement.
Obligation to Respond: Required to obtain or retain benefits.
Statutory authority for this information collection is contained in
sections 1, 2, 4(i), 4(j), 5(c), 201, 302, 303, 304, 307(e), and 309 of
the Communications Act of 1934, as amended, 47 U.S.C. 151, 152, 154(i),
154(j), 155(c), 201, 302, 303, 304, 307(e), and 309.
Total Annual Burden: 104,160 hours.
Total Annual Cost: $540,000.
Needs and Uses
On July 22, 2026, in furtherance of the goal of releasing more mid-
band spectrum into the market to support and enable next-generation
wireless networks, the Federal Communications Commission (Commission)
adopted a Report and Order, FCC 26-46, 91 FR 48700 (Upper C-band R&O),
in which it reformed the use of the 4.0-4.2 GHz portion of the C-Band.
The 4.0-4.2 GHz band currently is allocated in the United States
exclusively for non-Federal use on a primary basis for Fixed Satellite
Service (FSS) and Fixed Service.
Domestically, space station operators use the 4.0-4.2 GHz band to
provide downlink signals of various bandwidths to licensed transmit-
receive, registered receive-only, and unregistered receive-only earth
stations throughout the United States. The Upper C-band R&O calls for
the relocation of existing FSS operations in the C-band, making 160
megahertz (3.98-4.14 GHz) available for flexible-use terrestrial
wireless service throughout the contiguous United States through a
Commission-administered public auction of licenses that must be
completed by July 4, 2027, pursuant to a statutory mandate in the One
Big Beautiful Bill Act, Public Law 119-21, section 40002(b)(2).
The Commission adopted a robust transition schedule to achieve an
expeditious clearing and relocation of FSS operations and ensure that a
significant amount of spectrum is made available quickly for next-
generation wireless deployments, while also ensuring effective
accommodation of relocated incumbent users. Pursuant to the Upper C-
band R&O, all incumbent FSS operations in the contiguous United States
must clear the 4.0-4.16 GHz portion of the C-band by December 30, 2030,
or June 30, 2031, to ensure a timely transition process. The December
30 deadline applies to the top 75 Partial Economic Areas (PEAs) and
aligns with the Federal Aviation Administration's first deadline to
retrofit aircraft radio altimeters. The June 30 deadline applies to all
other areas.
The Commission concluded in the Upper C-band R&O that, before the
public auction of new licenses commences, it is appropriate for
potential bidders to: (1) know when they will get access to the
spectrum in the 3.98-4.14 GHz portion of the C-band that is currently
occupied by incumbent FSS space station operators and earth stations;
and (2) have an estimate of how much they may be required to pay for
incumbent relocation costs and incentive payments should they become
Upper C-band wireless licensees. New Upper C-band wireless licensees
are required to pay for the reasonable and necessary relocation costs
of incumbent space station and incumbent earth station operators that
are required to clear the 4.0-4.16 GHz portion of the C-band.
To facilitate the provision of this information to potential
auction bidders, the Commission is seeking approval for a modified
information collection to permit it to collect the following
information from incumbents as adopted in the Upper C-band R&O:
Transition Plans
The Upper C-band R&O requires each eligible space station operator
to submit to the Commission by November 5, 2026, and make available for
public review, a detailed transition plan describing the necessary
steps and estimated costs for the eligible space station operator to
clear its existing operations in the 4.0-4.16 GHz portion of the C-band
in the contiguous United States and its individual timeline for doing
so. An eligible space station operator may make changes to its
transition plan to update certain information or cure any defects that
may be identified by the Commission or by relevant stakeholders during
a public comment window.
Incumbent Earth Station Lump Sum Payment Elections
The Upper C-band R&O provides an incumbent earth station operator
with the option of: (1) accepting reimbursement payments for its
reasonable and necessary relocation costs for the transition; or (2) in
lieu of actual relocation costs, opting out of the formal relocation
process and accepting a lump sum reimbursement payment for its
incumbent earth stations on a per-site basis based on the average,
estimated cost of relocating such incumbent earth stations. The Upper
C-band R&O directs the Wireless Telecommunications Bureau to announce
the lump sum that will be available per incumbent earth station as well
as the process for electing lump sum payments and requires that, no
later than 60 days after the Wireless Telecommunications Bureau
announces the lump sum payment amounts, an incumbent earth station
operator that wishes to receive a lump sum payment make an irrevocable
lump sum payment election that will apply to such earth stations in the
contiguous United States.
This information collection will serve as the starting point for
planning and managing the process of efficiently and expeditiously
clearing the 4.0-4.16 GHz portion of the C-band, so that this spectrum
can be auctioned for flexible-use service licenses.
Federal Communications Commission.
Marlene Dortch,
Secretary, Office of the Secretary.
[FR Doc. 2026-21324 Filed 10-16-26; 8:45 am]
BILLING CODE 6712-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.