Wireless Telecommunications Bureau Seeks Comment on Preliminary Cost Catalog for Upper C-Band Incumbent Transition
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
In this document, the Wireless Telecommunications Bureau (Bureau) invites interested parties to comment on the Upper C-band Transition Preliminary Cost Catalog (Cost Catalog), which is attached as Attachment A. The Cost Catalog contains preliminary estimates of reasonable and necessary transition costs that eligible space station operators and incumbent earth station operators (collectively, incumbents) may incur as they transition out of 4.0-4.16 GHz to make 160 megahertz of mid-band spectrum available to 3.7 GHz Service licensees for flexible use throughout the contiguous United States. The Cost Catalog also includes the payment categories for incumbent earth station operators that elect lump sum reimbursement in lieu of actual cost reimbursement. In Upper C-band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to 4.2 GHz Band, GN Docket Nos. 25-59 and 18-122, Report and Order, Order of Proposed Modification, and Order on Reconsideration, FCC 26-46 (July 24, 2026) (Upper C-band R&O), the Commission established that new 3.7 GHz Service licensees will reimburse incumbents for their reasonable and necessary relocation costs to transition out of 4.0-4.16 GHz and directed the Bureau to develop the Cost Catalog.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 200 (Monday, October 19, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 200 (Monday, October 19, 2026)]
[Notices]
[Pages 66139-66141]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-21321]
-----------------------------------------------------------------------
FEDERAL COMMUNICATIONS COMMISSION
[GN Docket No. 25-59; DA 26-1049; FR ID: 372721]
Wireless Telecommunications Bureau Seeks Comment on Preliminary
Cost Catalog for Upper C-Band Incumbent Transition
AGENCY: Federal Communications Commission.
ACTION: Notice; solicitation of comment.
-----------------------------------------------------------------------
SUMMARY: In this document, the Wireless Telecommunications Bureau
(Bureau) invites interested parties to comment on the Upper C-band
Transition Preliminary Cost Catalog (Cost Catalog), which is attached
as
[[Page 66140]]
Attachment A. The Cost Catalog contains preliminary estimates of
reasonable and necessary transition costs that eligible space station
operators and incumbent earth station operators (collectively,
incumbents) may incur as they transition out of 4.0-4.16 GHz to make
160 megahertz of mid-band spectrum available to 3.7 GHz Service
licensees for flexible use throughout the contiguous United States. The
Cost Catalog also includes the payment categories for incumbent earth
station operators that elect lump sum reimbursement in lieu of actual
cost reimbursement. In Upper C-band (3.98-4.2 GHz); Expanding Flexible
Use of the 3.7 to 4.2 GHz Band, GN Docket Nos. 25-59 and 18-122, Report
and Order, Order of Proposed Modification, and Order on
Reconsideration, FCC 26-46 (July 24, 2026) (Upper C-band R&O), the
Commission established that new 3.7 GHz Service licensees will
reimburse incumbents for their reasonable and necessary relocation
costs to transition out of 4.0-4.16 GHz and directed the Bureau to
develop the Cost Catalog.
DATES: Comments are due on or before October 20, 2026; reply comments
are due on or before November 9, 2026.
ADDRESSES: You may submit comments, identified by GN Docket No. 25-59,
by any of the following methods:
[ssquf] Federal Communications Commission's Website: <a href="https://www.fcc.gov/ecfs/filings/standard">https://www.fcc.gov/ecfs/filings/standard</a>. Follow the instructions for
submitting comments.
[ssquf] People with Disabilities: Contact the FCC to request
reasonable accommodations (accessible format documents, sign language
interpreters, CART, etc.) via email at <a href="/cdn-cgi/l/email-protection#672124245257532701040449000811"><span class="__cf_email__" data-cfemail="ce888d8dfbfefa8ea8adade0a9a1b8">[email protected]</span></a> or telephone at
(202) 418-0530.
For detailed instructions for submitting comments and additional
information on the rulemaking process, see the SUPPLEMENTARY
INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Andrew McArdell, Wireless
Telecommunications Bureau, via telephone at (202) 418-1576 or via email
at <a href="/cdn-cgi/l/email-protection#3a7b545e485f4d1477597b485e5f56567a5c5959145d554c"><span class="__cf_email__" data-cfemail="44052a203621336a0927053620212828042227276a232b32">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION: This is a summary of the Commission's
document (Public Notice), in GN Docket No. 25-59, DA 26-1049, released
on September 30, 2026. The Public Notice includes the following
attachment: Attachment A, Upper C-band Transition Preliminary Cost
Catalog of Potential Expenses and Estimate Costs. The complete text of
the Public Notice, including the attachment, is available on the
Commission's website at <a href="https://docs.fcc.gov/public/attachments/DA-26-1049A1.pdf">https://docs.fcc.gov/public/attachments/DA-26-1049A1.pdf</a> or by using the search function for GN Docket No. 25-59 on
the Commission's ECFS web page at <a href="https://www.fcc.gov/ecfs/">https://www.fcc.gov/ecfs/</a>.
Pursuant to 1.415 and 1.419 of the Commission's rules, 47 CFR
1.415, 1.419, interested parties may file comments and reply comments
on or before the dates indicated on the first page of the Public
Notice.
Ex Parte Rules: The proceeding shall be treated as a ``permit-but-
disclose'' proceeding in accordance with the Commission's ex parte
rules. Persons making ex parte presentations must file a copy of any
written presentation or a memorandum summarizing any oral presentation
within two business days after the presentation (unless a different
deadline applicable to the Sunshine period applies). Persons making
oral ex parte presentations are reminded that memoranda summarizing the
presentation must: (1) list all persons attending or otherwise
participating in the meeting at which the ex parte presentation was
made, and (2) summarize all data presented and arguments made during
the presentation. If the presentation consisted in whole or in part of
the presentation of data or arguments already reflected in the
presenter's written comments, memoranda, or other filings in the
proceeding, the presenter may provide citations to such data or
arguments in his or her prior comments, memoranda, or other filings
(specifying the relevant page and/or paragraph numbers where such data
or arguments can be found) in lieu of summarizing them. Documents shown
or given to Commission staff during ex parte meetings are deemed to be
written ex parte presentations and must be filed consistent with Sec.
1.1206(b) of the Commission's rules. In proceedings governed by Sec.
1.49(f) of the Commission's rules or for which the Commission has made
available a method of electronic filing, written ex parte presentations
and memoranda summarizing oral ex parte presentations, and all
attachments thereto, must be filed through the electronic comment
filing system available for that proceeding, and must be filed in their
native format (e.g., .doc, .xml, .ppt, searchable .pdf). Participants
in this proceeding should familiarize themselves with the Commission's
ex parte rules (47 CFR 1.1200 et seq.).
Synopsis
With this Public Notice, the Bureau invites interested parties to
comment on the Cost Catalog contained in Attachment A. In the Upper C-
band R&O (91 FR 55281 (Aug. 27, 2026)), the Commission adopted rules to
make 160 megahertz of mid-band spectrum available for flexible use
throughout the contiguous United States by transitioning incumbent
Fixed Satellite Service (FSS) operations out of 4.0-4.16 GHz. The Upper
C-band R&O established that new Upper C-band wireless licensees in the
3.7 GHz Service will reimburse the reasonable and necessary transition
costs of incumbents to transition out of the reconfigured portion of
the band. The Upper C-band R&O further gives incumbent earth station
operators the option to elect on a per-site basis a lump sum payment in
lieu of actual cost reimbursement. The lump sum election is
irrevocable, and any incumbent earth station operators that select the
lump sum will have opted out of the formal transition process, will be
responsible for their own transition work for the relevant sites from
that point forward, and must comply with the relevant Transition
Deadline for the partial economic area (PEA) where they are located.
Actual Cost Reimbursement. To provide additional guidance on
compensable costs in connection with actual cost reimbursements, the
Commission directed the Bureau to develop a Cost Catalog and instructed
the Upper C-band Clearinghouse, which will administer the financial
aspects of the transition, to presume as reasonable all reimbursement
claims that fall within the estimated range of costs that the Cost
Catalog identifies. To this end, the Commission engaged a contractor,
Teltrium, Inc. (Teltrium), to assist with developing the Preliminary
Cost Catalog in Attachment A, which contains draft categories for the
most common anticipated transition tasks and related ranges of
presumptively reasonable expenses that incumbents may incur as they
clear operations out of 4.0-4.16 GHz. This Preliminary Cost Catalog is
based in part upon the Final Cost Catalog that was developed in 2020
for the Lower C-band transition (85 FR 47209), with adjustments for
inflation, but it also includes proposed new categories tailored to the
different anticipated transition steps implicated by the Upper C-band
transition. To compile the information needed for the Preliminary Cost
Catalog, Teltrium considered comments and filings in the underlying
record in GN Docket No. 25-59, publicly available pricing and technical
information, and information obtained from confidential interviews with
vendors and other targeted stakeholders, including satellite
[[Page 66141]]
operators and earth station operators, about their anticipated
transition work.
We seek comment on the Preliminary Cost Catalog, including whether
the draft categories and estimated range of expenses for each category
are reasonable. As mentioned, this Preliminary Cost Catalog is based in
part on the Lower C-band Final Cost Catalog, and we seek comment
whether additional updates are necessary to better suit the specific
circumstances of the Upper C-band transition. If so, what additional
transition tasks and categories should we include? We note that the
Cost Catalog is only intended to cover the most common anticipated
transition tasks and is not a comprehensive list of every possible
relocation action whose costs may ultimately be deemed reimbursable.
Claimants may still submit claims for items not included in the final
Cost Catalog, and those claims will be subject to review and
disposition by the Upper C-band Clearinghouse as part of its remit to
prevent fraud, waste, and abuse. Further, in formulating this list as a
guidance resource, we do not intend for it to constrain the Upper C-
band Clearinghouse from exercising its independent judgment on what
claims or elements thereof constitute optional upgrades or non-
compensable costs as it assesses the specific merits of individual
claims. For the initial categories set forth in the Preliminary Cost
Catalog, and for any additions that commenters may suggest, commenters
seeking adjustments are encouraged to provide specific pricing
information for individual items as well as more general information on
the costs that incumbents expect to incur.
Incumbent Earth Station Lump Sum Payments. The Preliminary Cost
Catalog sets forth specific lump sum categories and amounts for
incumbent earth station operators seeking to opt out of the formal
transition process led by the eligible space station operators. This
mechanism will afford lump sum electees the option to: (1) perform
their own transition work to maintain FSS service; (2) migrate to an
alternative distribution technology, such as an IP-delivered service;
or (3) discontinue service altogether. While the decision to opt for
the lump sum payment in lieu of actual cost reimbursement is
irrevocable, incumbent earth station operators may elect lump sum
payments on a per-site basis to enable operators with a mix of
facilities in urban and rural areas to opt for the type of transition
that best meets their long-term needs. We reiterate that any incumbent
earth station operators electing the lump sum will be responsible for
their own transition work for the relevant sites from that point
forward and must comply with the relevant Transition Deadline for the
PEA where they are located.
We seek comment on the preliminary lump sum categories and amounts
provided in Appendix A, which, as directed by the Commission in the
Upper C-band R&O, are based upon the average estimated, reasonable
costs of transitioning those facilities out of 4.0-4.16 GHz, including
costs related to the potential migration of service or links to the Ku-
band. We also seek comment on the proposed lump sum amount for each
category and the methodology used to arrive at those amounts. Does the
methodology described in Appendix A and these amounts reflect the
appropriate lump-sum inputs for each class of earth station? Should we
make any adjustments to account for other factors? We also seek comment
on the specific filing and certification procedures used in connection
with the Lower C-band transition and whether to repurpose them here or
adjust them, given the shift to a per-site lump sum approach in the
instant transition.
Federal Communications Commission.
Marlene Dortch,
Secretary, Office of the Secretary.
[FR Doc. 2026-21321 Filed 10-16-26; 8:45 am]
BILLING CODE 6712-01-P