Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; Application for Permit To Drill (APD, Revised APD), Supplemental APD Information Sheet, and All Supporting Documentation

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
October 16, 2026

Issuing agencies

Interior DepartmentSafety and Environmental Enforcement Bureau

Abstract

In accordance with the Paperwork Reduction Act (PRA) of 1995, the Bureau of Safety and Environmental Enforcement (BSEE) proposes to renew an information collection.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 199 (Friday, October 16, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 199 (Friday, October 16, 2026)]
[Notices]
[Pages 65772-65775]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-21158]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Safety and Environmental Enforcement

[Docket ID BSEE-2025-0299; EEEE500000-256E1700D2-ET1SF0000.EAQ000OMB 
Control Number 1014-0025]


Agency Information Collection Activities; Submission to the 
Office of Management and Budget for Review and Approval; Application 
for Permit To Drill (APD, Revised APD), Supplemental APD Information 
Sheet, and All Supporting Documentation

AGENCY: Bureau of Safety and Environmental Enforcement, Interior.

ACTION: Notice of information collection; request for comment.

-----------------------------------------------------------------------

SUMMARY: In accordance with the Paperwork Reduction Act (PRA) of 1995, 
the Bureau of Safety and Environmental Enforcement (BSEE) proposes to 
renew an information collection.

DATES: Interested persons are invited to submit comments on or before 
November 16, 2026.

ADDRESSES: Written comments and recommendations for the proposed 
information collection should be sent within 30 days of publication of 
this notice to <a href="http://www.reginfo.gov/public/do/PRAMain">www.reginfo.gov/public/do/PRAMain</a>. Find this particular 
information collection by selecting ``Currently under 30-day Review--
Open for Public Comments'' or by using the search function. Please 
provide a copy of your comments to Kelly Odom, Acting BSEE ICCO, 45600 
Woodland Road, Sterling, VA 20166; or by email to <a href="/cdn-cgi/l/email-protection#b1fad4ddddc89ffed5dedcf1d3c2d4d49fd6dec7"><span class="__cf_email__" data-cfemail="d992bcb5b5a0f796bdb6b499bbaabcbcf7beb6af">[email&#160;protected]</span></a>. 
Please reference OMB Control Number 1014-0025 in the subject line of 
your comments.

FOR FURTHER INFORMATION CONTACT: To request additional information 
about this ICR, contact Kelly Odom by email at <a href="/cdn-cgi/l/email-protection#1c577970706532537873715c7e6f7979327b736a"><span class="__cf_email__" data-cfemail="400b252c2c396e0f242f2d00223325256e272f36">[email&#160;protected]</span></a>, or 
by telephone at (703) 787-1775. Individuals in the United States who 
are deaf, deafblind, hard of hearing, or have a speech disability may 
dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay 
services. Individuals outside the United States should use the relay 
services offered within their country to make international calls to 
the point-of-contact in the United States. You may also view the ICR at 
<a href="http://www.reginfo.gov/public/do/PRAMain">http://www.reginfo.gov/public/do/PRAMain</a>.

SUPPLEMENTARY INFORMATION: In accordance with the PRA and 5 CFR 
1320.8(d)(1), we provide the general public and other Federal agencies 
with an opportunity to comment on new, proposed, revised, and 
continuing collections of information. This helps us assess the impact 
of our information collection requirements and minimize the public's 
reporting burden. It also helps the public understand our information 
collection requirements and provide the requested data in the desired 
format.
    A Federal Register notice with a 60-day public comment period 
soliciting comments on this collection of information was published on 
April 24, 2026 (91 FR 22165). BSEE did not receive any comments on this 
notice.
    As part of our continuing effort to reduce paperwork and respondent 
burdens, we are again soliciting comments from the public and other 
Federal agencies on the proposed ICR that is described below. We are 
especially interested in public comment addressing the following:
    (1) Whether or not the collection of information is necessary for 
the proper performance of the functions of the agency, including 
whether or not the information will have practical utility;
    (2) The accuracy of our estimate of the burden for this collection 
of information, including the validity of the methodology and 
assumptions used;
    (3) Ways to enhance the quality, utility, and clarity of the 
information to be collected; and
    (4) How might the agency minimize the burden of the collection of 
information on those who are to respond, including through the use of 
appropriate automated, electronic, mechanical, or other technological 
collection techniques or other forms of information technology, e.g., 
permitting electronic submission of response.
    Comments that you submit in response to this notice are a matter of 
public record. Before including your address, phone number, email 
address, or other personal identifying information in your comment, you 
should be aware that your entire comment--including your personal 
identifying information--may be made publicly available at any time. 
While you can ask us in your comment to withhold your personal 
identifying information from public review, we cannot guarantee that we 
will be able to do so.
    Abstract: The regulations at 30 CFR part 250 pertain to Application 
for Permit to Drill (APD, Revised APD), Supplemental APD Information 
Sheet, and all supporting documentation and are the subject of this 
collection. This request also covers the related Notices to Lessees and 
Operators (NTLs) that BSEE issues to clarify, supplement, or

[[Page 65773]]

provide additional guidance on some aspects of our regulations.
    The BSEE uses the information to ensure safe drilling operations 
and to protect the human, marine, and coastal environment. Among other 
things, BSEE specifically uses the information to ensure: the drilling 
unit is fit for the intended purpose; the lessee or operator will not 
encounter geologic conditions that present a hazard to operations; 
equipment is maintained in a state of readiness and meets safety 
standards; each drilling crew is properly trained and able to promptly 
perform well-control activities at any time during well operations; 
compliance with safety standards; and the current regulations will 
provide for safe and proper field or reservoir development, resource 
evaluation, conservation, protection of correlative rights, safety, and 
environmental protection. We also review well records to ascertain 
whether drilling operations have encountered hydrocarbons or H2S and to 
ensure that H2S detection equipment, personnel protective equipment, 
and training of the crew are adequate for safe operations in zones 
known to contain H2S and zones where the presence of H2S is unknown.
    This ICR includes forms BSEE-0123 (APD) and BSEE-0123S 
(Supplemental APD Information Sheet). The BSEE uses the information 
from these forms to determine the conditions of a drilling site to 
avoid hazards inherent in drilling operations. Specifically, we use the 
information to evaluate the adequacy of a lessee's or operator's plan 
and equipment for drilling, sidetracking, or deepening operations. This 
includes the adequacy of the proposed casing design, casing setting 
depths, drilling fluid (mud) programs, cementing programs, and blowout 
preventer (BOP) systems to ascertain that the proposed operations will 
be conducted in an operationally safe manner that provides adequate 
protection for the environment. BSEE also reviews the information to 
ensure conformance with specific provisions of the lease. In addition, 
except for proprietary data, BSEE is required by the OCSLA to make 
available to the public certain information submitted on Forms BSEE-
0123 and BSEE-0123S.
    The forms consist of the following:

BSEE-0123

    Heading: BSEE uses the information to identify the type of proposed 
drilling activity for which approval is requested.
    Well at Total Depth/Surface: Information used to identify the 
location (area, block, lease, latitude and longitude) of the proposed 
drilling activity.
    Significant Markers Anticipated: Identification of significant 
geologic formations, structures and/or horizons that the lessee or 
operator expects to encounter. This information, in conjunction with 
seismic data, is needed to correlate with other wells drilled in the 
area to assess the risks and hazards inherent in drilling operations.
    Question/Information: The information is used to ascertain the 
adequacy of the drilling fluids (mud) program to ensure control of the 
well, the adequacy of the surface casing compliance with EPA offshore 
pollutant discharge requirements and the shut in of adjacent wells to 
ensure safety while moving a rig on and off a drilling location, as 
well that the worst case discharge scenario information reflects the 
well and is updated if applicable. This information is also provided in 
the course of electronically requesting approval of drilling operations 
via eWell.

BSEE-0123S

    Heading: BSEE uses this information to identify the lease operator, 
rig name, rig elevation, water depth, type well (exploratory, 
development), and the presence of H2S and other data which is needed to 
assess operational risks and safety.
    Well Design Information: This engineering data identifies casing 
size, pressure rating, setting depth and current volume, hole size, mud 
weight, BOP and well bore designs, formation and BOP test data, and 
other criteria. The information is used by BSEE engineers to verify 
operational safety and ensure well control to prevent blowouts and 
other hazards to personnel and the environment. This form requests data 
collection for successive sections of the borehole as drilling proceeds 
toward total depth below each intermediate casing point.
    Title of Collection: 30 CFR part 250, Application for Permit to 
Drill (APD, Revised APD), Supplemental APD Information Sheet, and all 
supporting documentation.
    OMB Control Number: 1014-0025.
    Form Number: Forms BSEE-0123 and BSEE-0123S.
    Type of Review: Extension of a currently approved collection.
    Respondents/Affected Public: Potential respondents include Federal 
OCS oil, gas, and sulfur lessees and/or operators and holders of 
pipeline rights-of-way.
    Total Estimated Number of Annual Respondents: Currently there are 
approximately 555 Federal OCS oil, gas, and sulfur lessees and holders 
of pipeline rights-of-way. Not all the potential respondents will 
submit information in any given year, and some may submit multiple 
times.
    Total Estimated Number of Annual Responses: 10,820.
    Estimated Completion Time per Response: Varies from 1 hour to 20 
hours, depending on activity.
    Total Estimated Number of Annual Burden Hours: 49,446.
    Respondent's Obligation: Most responses are mandatory while others 
are to obtain and/or retain a benefit.
    Frequency of Collection: Submitted generally on occasion and as 
required in the regulations.
    Total Estimated Annual Nonhour Burden Cost: $299,876.

----------------------------------------------------------------------------------------------------------------
                                                                                                        Annual
 Citation 30 CFR 250;  Application         Reporting or                          Average number  of     burden
    for  Permit to Drill (APD)      recordkeeping requirement    Hour  burden         responses          hours
                                                *                                                      (rounded)
----------------------------------------------------------------------------------------------------------------
                                                                              Non-hour cost burden
----------------------------------------------------------------------------------------------------------------
Subparts A, C, D, E, G............  Apply for permit to        1..............  122 applications....         122
                                     drill, sidetrack,
                                     bypass, or deepen a well
                                     submitted via Forms BSEE-
                                     0123 (APD) and BSEE-
                                     0123S (Supplemental
                                     APD). (This burden
                                     represents only the
                                     filling out of the
                                     forms, the requirements
                                     are listed separately
                                     below.).
                                                              --------------------------------------------------
                                                                          $2,458 fee x 122 = $299,876.
                                                              --------------------------------------------------
Subparts D, E, G..................  Obtain approval to revise  1..............  677 submittals......         677
                                     your drilling plan or
                                     change major drilling
                                     equipment by submitting
                                     a Revised APD and
                                     Supplemental APD [no
                                     cost recovery fee for
                                     Revised APDs]. (This
                                     burden represents only
                                     the filling out of the
                                     forms, the requirements
                                     are listed separately
                                     below).
----------------------------------------------------------------------------------------------------------------

[[Page 65774]]

 
    Subtotal..................................................................  799 responses.......         799
                                   -----------------------------------------------------------------------------
                                          $299,876 non-hour cost burdens.
----------------------------------------------------------------------------------------------------------------
                                                    Subpart A
----------------------------------------------------------------------------------------------------------------
125...............................  Submit evidence of your    Exempt under 5 CFR 1320.3(h)(1).                0
                                     fee for services receipt.
197...............................  Written confidentiality    Exempt under 5 CFR 1320.5(d)(2).                0
                                     agreement.
----------------------------------------------------------------------------------------------------------------
                                                    Subpart C
----------------------------------------------------------------------------------------------------------------
300(b)(1), (2)....................  Obtain approval to add     R-1............  1 request...........           1
                                     petroleum-based
                                     substance to drilling
                                     mud system or approval
                                     for method of disposal
                                     of drill cuttings, sand,
                                     & other well solids,
                                     including those
                                     containing NORM.
----------------------------------------------------------------------------------------------------------------
    Subtotal for C............................................................  1 response..........           1
----------------------------------------------------------------------------------------------------------------
                                                    Subpart D
----------------------------------------------------------------------------------------------------------------
408; 414(h).......................  Request approval of        Burden covered under subpart A, 1014-           0
                                     alternate procedures or    0022.
                                     equipment during
                                     drilling operations.
                                                              ---------------------------------------
409...............................  Request departure          R-5............  370 approvals.......       1,850
                                     approval from the
                                     drilling requirements
                                     specified in this
                                     subpart; identify and
                                     discuss.
410(b); 713.......................  Reference well and site-   R-10...........  1 submittal.........          10
                                     specific information in
                                     case it is not approved
                                     in your Exploration
                                     Plan, Development and
                                     Production Plan,
                                     Development Operations
                                     Coordination Document
                                     Burdens pertaining to
                                     EPs, DPPs, DOCDs are
                                     covered under BOEM 1010-
                                     0151.
410(d)............................  Submit to the District     R-3............  380 submittals......       1,140
                                     Manager: An original and
                                     two complete copies of
                                     APD and Supplemental
                                     APD; separate public
                                     information copy of
                                     forms per Sec.   250186.
411; 412..........................  Submit plat showing        R-3............  380 submittals......       1,140
                                     location of the proposed
                                     well and all the plat
                                     requirements associated
                                     with this section.
411; 413; 414; 415; 420...........  Submit design criteria     R-12...........  707 submittals......       8,484
                                     used and all description
                                     requirements; drilling
                                     prognosis with
                                     description of the
                                     procedures you will
                                     follow; and casing and
                                     cementing program
                                     requirements.
411; 416; 731.....................  Submit diverter and BOP    R-5............  380 submittals......       1,900
                                     systems descriptions and
                                     all the regulatory
                                     requirements associated
                                     with this section.
411; 713..........................  Provide information for    10.............  682 submittals......       6,820
                                     using a MODU and all the
                                     regulatory requirements
                                     associated with this
                                     section.
411; 418..........................  Additional information     R-5............  380 submittals......       1,900
                                     required when providing
                                     an APD include, but not
                                     limited to, rated
                                     capacities of drilling
                                     rig and equipment if not
                                     already on file;
                                     drilling fluids program,
                                     including weight
                                     materials; directional
                                     plot; H2S contingency
                                     plan; welding plan; and
                                     information we may
                                     require per
                                     requirements, etc.
414(c)............................  Request preapproval to     R-3............  15 requests.........          45
                                     use alternative
                                     equivalent downhole mud
                                     weight prior to
                                     submitting APD.
420(a)(7).........................  Include signed registered  R-1............  1,034 certifications       1,034
                                     professional engineer
                                     certification and
                                     related information.
423(c)............................  Submit for approval        3..............  527 procedures &           1,581
                                     casing pressure test                        criteria.
                                     procedures and criteria
                                     On casing seal assembly
                                     ensure proper
                                     installation of casing
                                     or liner (subsea BOP's
                                     only).
428(b)............................  Submit to District         R-8............  1 submittal.........           8
                                     Manager for approval
                                     revised casing setting
                                     depths or hole interval
                                     drilling depth; include
                                     certification by PE.
428(k)............................  Submit a description of    R-1............  1 submittal.........           1
                                     the plan to use a
                                     valve(s) on the drive
                                     pipe during cementing
                                     operations for the
                                     conductor casing,
                                     surface casing, or liner.
432...............................  Request departure from     1..............  R-53 requests.......          53
                                     diverter requirements;
                                     with discussion and
                                     receive approval.
460(a)............................  Include your projected     R-4............  2 plans.............           8
                                     plans if well testing
                                     along with the required
                                     information.
462(c)............................  Submit a description of    R-8............  1 submittal.........           8
                                     your source control and
                                     containment capabilities
                                     to the Regional
                                     Supervisor and receive
                                     approval; all required
                                     information.
490(c)............................  Request to classify an     R-2............  91 requests.........         182
                                     area for the presence of
                                     H2S.
                                    Support request with       R-10...........  73 submittals.......         730
                                     available information
                                     such as G&G data, well
                                     logs, formation tests,
                                     cores and analysis of
                                     formation fluids.
                                    Submit a request for       2..............  4 requests..........           8
                                     reclassification of a
                                     zone when a different
                                     classification is needed.
Alaska Region: 410; 412 through     Due to the difficulties    0..............  1 request...........           0
 418; 420; 456; 470; 472.            of drilling in Alaska,
                                     along with the shortened
                                     time window allowed for
                                     drilling, Alaska hours
                                     are done here as stand-
                                     alone requirements Also,
                                     note that these specific
                                     hours are based on the
                                     first APD in Alaska in
                                     more than 10 years.
----------------------------------------------------------------------------------------------------------------
    Subpart D subtotal........................................................  5,083 responses.....      26,902
----------------------------------------------------------------------------------------------------------------
                                                    Subpart E
----------------------------------------------------------------------------------------------------------------
513...............................  Obtain written approval    R-20...........  R-289 requests......       5,780
                                     to begin well completion
                                     operations. If
                                     completion is planned
                                     and the data are
                                     available you may submit
                                     on forms.
                                    Submit description of      R-10...........  295 submittals......       2,950
                                     well-completion,
                                     schematics, logs, any
                                     H2S.
----------------------------------------------------------------------------------------------------------------
    Subpart E subtotal........................................................  584 responses.......       8,730
----------------------------------------------------------------------------------------------------------------
                                                    Subpart G
----------------------------------------------------------------------------------------------------------------
701...............................  Identify and discuss your  Burden covered under subpart A, 1014-           0
                                     proposed alternate         0022.
                                     procedures or equipment.

[[Page 65775]]

 
702...............................  Identify and discuss       Burden covered under subpart A, 1014-           0
                                     departure requests..       0022.
                                                              ---------------------------------------
713(b)............................  Submit plat of the rig's   R-1............  1 submittal.........           1
                                     anchor pattern for a
                                     moored rig approved in
                                     your EP, DPP, or DOCD.
713(e)............................  Provide contingency plan   R-5............  682 submittals......       3,410
                                     for using dynamically
                                     positioned MODU and all
                                     the regulatory
                                     requirements associated
                                     with this section.
713(g)............................  Describe specific current  R-8............  1 submittal.........           8
                                     speeds when implementing
                                     rig shutdown and/or move-
                                     off procedures for water
                                     depths >400 meters;
                                     discussion of specific
                                     measures you will take
                                     to curtail rig
                                     operations/move-off
                                     location.
720(b)............................  Request approval to        R-2............  518 approval               1,036
                                     displace kill-weight                        requests.
                                     fluid; include reasons
                                     why along with step-by-
                                     step procedures.
721(g)(4).........................  Submit test procedures     R-2............  355 submittals......         710
                                     and criteria for a
                                     successful negative
                                     pressure test for
                                     approval. If any change,
                                     submit changes for
                                     approval.
731...............................  Submit complete            R-10...........  129.................       1,290
                                     description of BOP
                                     system and components;
                                     schematic drawings;
                                     certification by ITP
                                     (additional I3P if BOP
                                     is subsea, in HTHP, or
                                     surface on floating
                                     facility); autoshear,
                                     deadman, EDS systems;
733(b)............................  Describe annulus           R-2............  1 submittal.........           2
                                     monitoring plan; and how
                                     the well will be secured
                                     if leak is detected.
734(b)............................  Submit verification        R-4............  1 report............           4
                                     report from ITP
                                     documenting repairs &
                                     that BOP is fit for
                                     service.
734(c)............................  Submit revision,           R-3............  1 submittal.........           3
                                     including all
                                     verifications required,
                                     before drilling out
                                     surface casing.
737(a)............................  Request approval from      R-4............  358 casing/liner           1,432
                                     District Manager to omit                    info.
                                     BOP pressure test
                                     Indicate which casing
                                     strings and liners meet
                                     the criteria for this
                                     request.
737(b)(2).........................  Request approval of test   2..............  353 requests........         706
                                     pressures (RAM BOPs).
737(b)(3).........................  Request approval of        2..............  380 requests........         760
                                     pressure test (annular
                                     BOPs).
737(d)(2).........................  Submit test procedures     R-3............  507 submittals......       1,521
                                     for approval for surface
                                     BOP.
737(d)(3); (d)(4).................  Submit test procedures,    2..............  507 submittals......       1,014
                                     including how you will
                                     test each ROV
                                     intervention function,
                                     for approval (subsea
                                     BOPs only).
737(d)(12)........................  Submit test procedures     R-2............  507 submittals......       1,014
                                     (autoshear and deadman
                                     systems) for approval
                                     Include documentation of
                                     the controls/circuitry
                                     system used for each
                                     test; describe how the
                                     ROV will be used during
                                     this operation.
738(b)............................  Submit a revised permit    2..............  50 submittals.......         100
                                     with a written statement
                                     from an independent
                                     third party documenting
                                     the repairs,
                                     replacement, or
                                     reconfiguration and
                                     certifying that the
                                     previous certification
                                     in Sec.   250731(c)
                                     remains valid.
738(m)............................  Request approval to use    R-1............  1 request...........           1
                                     additional well control
                                     equipment, including
                                     BAVO report; as well as
                                     other information
                                     required by District
                                     Manager.
738(n)............................  Submit which pipe/         R-2............  1 submittal.........           2
                                     variable bore rams have
                                     no current utility or
                                     well control purposes.
----------------------------------------------------------------------------------------------------------------
    Subpart G subtotal........................................................  4,353 response......      13,014
----------------------------------------------------------------------------------------------------------------
        Total Burden..........................................................  10,820 responses....      49,446
                                   -----------------------------------------------------------------------------
                                          $299,876 Non Hour Cost Burden.
----------------------------------------------------------------------------------------------------------------

    An agency may not conduct, or sponsor and a person is not required 
to respond to a collection of information unless it displays a 
currently valid OMB control number.
    The authority for this action is the Paperwork Reduction Act of 
1995 (44 U.S.C. 3501 et seq.).

Kirk Malstrom,
Chief, Regulations and Standards Branch.
[FR Doc. 2026-21158 Filed 10-15-26; 8:45 am]
BILLING CODE 4310-VH-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on October 16, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.