City of Aspen; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Maroon Creek Hydroelectric Project
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
October 14, 2026
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 197 (Wednesday, October 14, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 197 (Wednesday, October 14, 2026)]
[Notices]
[Pages 65201-65203]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-20996]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10441-020]
City of Aspen; Notice of Scoping Period Requesting Comments on
Environmental Issues for the Proposed Maroon Creek Hydroelectric
Project
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 10441-020.
c. Date Filed: April 8, 2025.
d. Applicant: City of Aspen.
e. Name of Project: Maroon Creek Hydroelectric Project.
f. Location: On Maroon Creek near the city of Aspen in Pitkin
County, Colorado. The project occupies 0.575 acres of land managed by
the U.S. Forest Service in the White River National Forest.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Phil Overeynder, Utility Director, 427
Rio Grande Place, Aspen, CO 81611, (970) 920-5000,
<a href="/cdn-cgi/l/email-protection#fe8e969792d091889b8c9b87909a9b8cbe9f8d8e9b90d0999188"><span class="__cf_email__" data-cfemail="7e0e1617125011081b0c1b07101a1b0c3e1f0d0e1b1050191108">[email protected]</span></a>.
i. FERC Contact: Jane Dalgliesh, Coordinator, West Branch, Division
of Hydropower Licensing; (503) 552-2718; <a href="/cdn-cgi/l/email-protection#adc7ccc3c883c9ccc1cac1c4c8dec5edcbc8dfce83cac2db"><span class="__cf_email__" data-cfemail="5d373c333873393c313a3134382e351d3b382f3e733a322b">[email protected]</span></a>.
j. The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document that will discuss
the environmental effects of relicensing the Maroon Creek Hydroelectric
Project. The Commission will use this environmental document in its
decision-making process to determine whether to issue a new license for
the project.
k. This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. This notice is intended to advise all
participants as to the potential scope of the National Environmental
Policy Act (NEPA) document and to seek additional information pertinent
to this analysis. Commission staff does not intend to issue a separate
scoping document.
As part of the NEPA review process, the Commission takes into
account concerns the public may have about proposals and the
environmental effects that could result from its action whenever it
considers the issuance of a hydropower license. This gathering of
public input is referred to as ``scoping.'' The main goal of the
scoping process is to focus the analysis in the environmental document
on the important environmental issues.
l. Scoping Comments: By this notice, the Commission requests
written public comments on the scope of issues to address in the
environmental document. To ensure that your comments are timely and
properly recorded, please submit your comments so that the Commission
receives them in Washington, DC by 5:00 p.m. Eastern Time on November
9, 2026.
Comments should focus on the potential environmental effects and
reasonable alternatives. Your input will help the Commission staff
determine what issues they need to evaluate in the environmental
document. Commission staff will consider all written and oral comments
during the preparation of the environmental document.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief
comments up to 10,000 characters, without prior registration, using the
eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For
assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#591f1c0b1a16373530373c0a2c2929362b2d193f3c2b3a773e362f"><span class="__cf_email__" data-cfemail="c0868592838faeaca9aea593b5b0b0afb2b480a6a5b2a3eea7afb6">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659
[[Page 65202]]
(TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Debbie Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. All filings must clearly identify the project name
and docket number on the first page: Maroon Creek Hydroelectric Project
(P-10441-020).
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
m. The application is not ready for environmental analysis at this
time.
n. Project Description: The existing project consists of (a) a 10-
foot-high, 40-foot-long reinforced concrete dam with a crest elevation
of 8,245.75 feet mean sea level (the Maroon Creek diversion dam); (b) a
small impoundment; (c) an intake structure at the dam; (d) a 39-inch-
diameter, 5,563-foot-long buried reinforced concrete penstock; (e) a
27-inch-diameter, 1,317-foot-long buried reinforced concrete penstock
together with a 110-foot section of steel penstock at the plant site;
(f) a powerhouse with a 450-kilowatt (kW) turbine-generator unit; (g) a
200-foot-long trapezoidal open channel tailrace, returning the water to
Maroon Creek; (h) 0.48-kilovolt (kV) generator leading to a three-
phase, 0.48/24.9 kV step-up transformer; (i) an approximately 400-foot-
long, 24.9 kV overhead power line tap connection to the Aspen Highlands
circuit operated by Holy Cross Energy; and (j) appurtenant facilities.
The City of Aspen proposes the addition of up to 50 kW of
generating capacity through two new small turbines, with two new
attached generators placed at the existing diversion dam. These new
units would generate power from the bypass flows released from the
diversion dam without changing the timing or the amount of those
releases. Flows utilized by new generation equipment would be returned
to the same location on the stream immediately below the dam and
headgate.
In addition, the City of Aspen proposes to continue implementing
the following measures that are a part of the current license: (1)
maintain a minimum flow of 6 cfs in the project's bypass reach, as
measured immediately downstream from the confluence with Willow Creek,
located a fourth of a mile downstream from the project's diversion dam,
or maintain the natural flow in Maroon Creek downstream of the
confluence with Willow Creek, whichever is less; (2) maintain
streamflow gages to monitor minimum flow; (3) maintain the fish
screening structure at the powerhouse intake; (4) use best management
practices to minimize dust, noise, and traffic impacts to residents
during delivery of equipment and construction; (5) revegetate any
disturbed land surfaces; and (6) consult with Colorado Parks and
Wildlife during the final design of the project.
o. A copy of the application, with details of the proposed project,
can be viewed on the Commission's website at <a href="https://www.ferc.gov">https://www.ferc.gov</a> using
the ``eLibrary'' link. Enter the project's docket number excluding the
last three digits in the docket number field to access the document (P-
10441-020). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#80c6c5d2c3cfeeece9eee5d3f5f0f0eff2f4c0e6e5f2e3aee7eff6"><span class="__cf_email__" data-cfemail="4f090a1d0c00212326212a1c3a3f3f203d3b0f292a3d2c61282039">[email protected]</span></a>,
(866) 208-3676 (toll free), or (202) 502-8659 (TTY).
p. NEPA Process and the Environmental Document: Any environmental
document issued by the Commission will discuss effects that could occur
as a result of the project's relicensing under the relevant general
resource areas, such as:
<bullet> geology and soils;
<bullet> aquatic resources;
<bullet> terrestrial resources;
<bullet> threatened and endangered species;
<bullet> recreation, land use, and aesthetic resources;
<bullet> cultural resources; and
<bullet> developmental resources.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project and make recommendations on
how to lessen or avoid effects on the various resource areas. Your
comments will help Commission staff identify and focus on the issues
that might have an effect on the human environment and potentially
eliminate others from further discussion in the environmental document.
Following this scoping period, Commission staff will determine
whether to prepare an Environmental Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or EIS will present Commission staff's
independent analysis of the issues. If Commission staff prepares an EA,
a Notice of Intent to Prepare an Environmental Assessment will be
issued. The EA may be issued for an allotted public comment period. The
Commission would consider timely comments on the EA before making its
decision regarding the proposed project. If Commission staff prepares
an EIS, a Notice of Intent to Prepare an Environmental Impact Statement
will be issued. Staff will then prepare a draft EIS which will be
issued for public comment. Commission staff will consider all timely
comments received during the comment period on the draft EIS and revise
the document, as necessary, before issuing a final EIS. Any EA or draft
and final EIS will be available in electronic format in the public
record through eLibrary. If eSubscribed, you will receive instant email
notification when the environmental document is issued (see paragraph
(s) of this notice for instructions on using eSubscription).
q. For public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, contact the Office
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#c08f909080a6a5b2a3eea7afb6"><span class="__cf_email__" data-cfemail="efa0bfbfaf898a9d8cc1888099">[email protected]</span></a>.
r. This notice is being distributed to the Commission's official
mailing list for the project and any additional entities on the
applicant's distribution list. You can access the Commission's official
mailing list for this project at Mailing List/Recipients By State. If
you want to receive future mailings for the project and are not
included on the Commission's official mailing list, or if you wish to
be removed from the Commission's official mailing list, please send
your request by email to <a href="/cdn-cgi/l/email-protection#f8bebdaabbb7969491969dab8d8888978a8cb89e9d8a9bd69f978e"><span class="__cf_email__" data-cfemail="65232037262a0b090c0b00361015150a171125030017064b020a13">[email protected]</span></a>. In lieu of an
email request, you may submit a paper request. Submissions sent via the
U.S. Postal Service must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. All
written or emailed requests must specify your wish to be added to or
removed from the mailing list and must clearly identify the following
on the first page: Maroon Creek Hydroelectric Project No. 10441-020.
Additionally, the Commission offers a free service called
eSubscription, which makes it easy to stay informed of all issuances
and submittals regarding the
[[Page 65203]]
dockets/projects to which you subscribe. These instant email
notifications are the fastest way to receive notification and provide a
link to the document files which can reduce the amount of time you
spend researching proceedings. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to register for eSubscription.
In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via
the internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>)
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document (P-
10441-020). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#da9c9f889995b4b6b3b4bf89afaaaab5a8ae9abcbfa8b9f4bdb5ac"><span class="__cf_email__" data-cfemail="e7a1a2b5a4a8898b8e8982b4929797889593a781829584c9808891">[email protected]</span></a>,
(866) 208-3676 (toll free), or (202) 502-8659 (TTY).
(Authority: 18 CFR 2.1)
Dated: October 8, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-20996 Filed 10-13-26; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on October 14, 2026.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.