Deepwater Horizon Natural Resource Damage Assessment Louisiana Trustee Implementation Group Final Phase 2 Restoration Plan/Environmental Assessment #8.1: East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project and Finding of No Significant Impact
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The Deepwater Horizon (DWH) natural resource Trustees for the Louisiana Trustee Implementation Group (Louisiana TIG) have prepared the Final Phase 2 Restoration Plan/Environmental Assessment #8.1: East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project (RP/EA #8.1) and Finding of No Significant Impact (FONSI). The Final RP/EA #8.1 considers alternatives to help restore wetlands, coastal, and nearshore habitats injured by the DWH oil spill. The Final RP/EA #8.1 evaluates three design alternatives for each project under the Oil Pollution Act (OPA) including criteria set forth in the OPA Natural Resource Damage Assessment (NRDA) regulations and the National Environmental Policy Act of 1969 (NEPA, as amended) and selects two projects for funding and implementation.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 197 (Wednesday, October 14, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 197 (Wednesday, October 14, 2026)]
[Notices]
[Pages 65182-65183]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-20992]
-----------------------------------------------------------------------
DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
[RTID 0648-XG060]
Deepwater Horizon Natural Resource Damage Assessment Louisiana
Trustee Implementation Group Final Phase 2 Restoration Plan/
Environmental Assessment #8.1: East Orleans Landbridge Restoration
Project and Raccoon Island Restoration Project and Finding of No
Significant Impact
AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and
Atmospheric Administration (NOAA), Commerce.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Deepwater Horizon (DWH) natural resource Trustees for the
Louisiana Trustee Implementation Group (Louisiana TIG) have prepared
the Final Phase 2 Restoration Plan/Environmental Assessment #8.1: East
Orleans Landbridge Restoration Project and Raccoon Island Restoration
Project (RP/EA #8.1) and Finding of No Significant Impact (FONSI). The
Final RP/EA #8.1 considers alternatives to help restore wetlands,
coastal, and nearshore habitats injured by the DWH oil spill. The Final
RP/EA #8.1 evaluates three design alternatives for each project under
the Oil Pollution Act (OPA) including criteria set forth in the OPA
Natural Resource Damage Assessment (NRDA) regulations and the National
Environmental Policy Act of 1969 (NEPA, as amended) and selects two
projects for funding and implementation.
DATES: This document was published on October 14, 2026.
ADDRESSES: You may view and download the Final RP/EA #8.1 and FONSI at
<a href="https://www.gulfspillrestoration.noaa.gov/restoration-areas/louisiana">https://www.gulfspillrestoration.noaa.gov/restoration-areas/louisiana</a>.
You may also request a flash drive containing the Final RP/EA #8.1,
FONSI, and a fact sheet (see FOR FURTHER INFORMATION CONTACT).
FOR FURTHER INFORMATION CONTACT: David Reeves, NOAA Restoration Center,
(225) 726-1914, <a href="/cdn-cgi/l/email-protection#0f63607a667c666e616e215b46484f61606e6e21686079"><span class="__cf_email__" data-cfemail="7f13100a160c161e111e512b36383f11101e1e51181009">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
Introduction
On April 20, 2010, the mobile offshore drilling unit Deepwater
Horizon, which was drilling a well for BP Exploration and Production,
Inc. (BP), experienced a significant explosion, fire and subsequent
sinking in the Gulf of America, resulting in the release of millions of
barrels of oil and other discharges into the Gulf. Under the authority
of the OPA, designated Federal and State Trustees, acting on behalf of
the public, assessed the injuries to natural resources and prepared the
DWH Oil Spill Final Programmatic Damage Assessment and Restoration Plan
and Final Programmatic Environmental Impact Statement (Final PDARP/
PEIS), and the Record of Decision for the DWH Oil Spill Final PDARP/
PEIS (ROD), which sets forth the governance structure and process for
DWH restoration planning under the OPA NRDA regulations. On April 4,
2016, the United States District Court for the Eastern District of
Louisiana entered a Consent Decree resolving civil claims by the
Trustees against BP.
The Louisiana TIG, which includes the State of Louisiana Coastal
Protection and Restoration Authority, Oil Spill Coordinator's Office,
Departments of Environmental Quality, Wildlife and Fisheries, and
Natural Resources, the NOAA, the U.S. Department of the Interior, the
U.S. Environmental Protection Agency, and the U.S. Department of
Agriculture, selects and implements restoration projects under the
Louisiana TIG's management authority in accordance with the Consent
Decree. The Final PDARP/PEIS, ROD, Consent Decree, and information on
the DWH Trustees can be found at <a href="https://www.gulfspillrestoration.noaa.gov/restoration-planning/gulf-plan">https://www.gulfspillrestoration.noaa.gov/restoration-planning/gulf-plan</a>.
Background
As provided for in the Final PDARP/PEIS, TIGs may propose
conceptual projects for funding of a planning phase (e.g., initial
engineering and design [E&D]) in a restoration plan. This allows the
TIG to develop information needed to fully consider a subsequent
implementation phase of the project in a subsequent restoration plan.
In the Final RP/EA #8, the Louisiana TIG selected conceptual projects
to fund for E&D, including the East Orleans Landbridge Restoration
project and the Raccoon Island Restoration project. Both projects have
design alternatives that are now at a stage where proposed construction
alternatives may be
[[Page 65183]]
analyzed under the OPA NRDA regulations and NEPA. Therefore, in the
Final RP/EA #8.1, the Louisiana TIG proposes to implement the preferred
design alternatives to construct the East Orleans Landbridge project
and the Raccoon Island Restoration project.
On December 5, 2025, the Louisiana TIG announced on the Gulf Spill
Restoration website that they were initiating preparation of the RP/EA
#8.1. On May 18, 2026, the Louisiana TIG published the Draft RP/EA #8.1
for a 30-day public review period (91 FR 28574). To facilitate public
understanding of the document, the Louisiana TIG held a public webinar
on June 8, 2026, during which public comments were solicited. The
Louisiana TIG accepted public comments through June 17, 2026. After the
public review period closed, the Louisiana TIG reviewed the comments
received, prepared responses to those comments, finalized the plan, and
prepared the FONSI.
Overview of the Louisiana TIG Final RP/EA #8.1
The Draft RP/EA #8.1 provides OPA NRDA and NEPA analyses for a
reasonable range of design alternatives and identifies the Louisiana
TIG's preferred design alternative for each project. The preferred
design alternative, East Orleans Landbridge Restoration Alternative 4
(E.O. Alternative 4) would dredge and place approximately 5.0 million
cubic yards (3.8 million cubic meters) of sediment dredged from a
nearby inland borrow source to restore up to 1,320 acres (534 hectares)
of a wetland complex. E.O. Alternative 4 would also include 14,867
linear feet (4.53 kilometers) of shoreline protection. The approximate
cost to implement the preferred alternative is $109.4 million. The
preferred design alternative, Raccoon Island Restoration Project
Alternative 3 (RI Alternative 3) would dredge approximately 2.9 million
cubic yards (2.2 million cubic meters) of sand from an offshore borrow
source to restore up to 410 acres (166 hectares) of barrier island
habitat. RI Alternative 3 also includes maintenance of existing
Gulfside breakwaters, construction of four bayside breakwaters, and
construction of nine living shoreline structures. The approximate cost
to implement the preferred alternative is $156.3 million.
The total estimated cost to implement the two preferred
alternatives is approximately $265.7 million. Funding to implement the
alternatives selected by the Louisiana TIG would come from the
Wetlands, Coastal, and Nearshore Habitats Restoration Type allocation.
Additional restoration planning in the Louisiana TIG will continue.
Administrative Record
The Administrative Record for the Final RP/EA #8.1 can be viewed
electronically at <a href="https://www.doi.gov/deepwaterhorizon/adminrecord">https://www.doi.gov/deepwaterhorizon/adminrecord</a>
under the folder 6.5.5.2.16.
Authority
The authority for this action is the OPA of 1990 (33 U.S.C. 2701 et
seq.), its implementing NRDA regulations found at 15 CFR part 990 and
NEPA (42 U.S.C. 4321 et seq.).
Dated: October 9, 2026.
Carrie Diane Robinson,
Director, Office of Habitat Conservation, National Marine Fisheries
Service.
[FR Doc. 2026-20992 Filed 10-13-26; 8:45 am]
BILLING CODE 3510-22-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>