In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725B (1902-0248), Mandatory Reliability Standards, Critical Infrastructure Protection (CIP)--Update to CIP-015. This update changes the CIP-015-1 standard to CIP-015-2 which reflects the changes implemented through Order RD26-6- 000 issued on August 10, 2026.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 196 (Tuesday, October 13, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 196 (Tuesday, October 13, 2026)]
[Notices]
[Pages 64921-64923]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-20880]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RD26-6-000]
Commission Information Collection Activities (FERC-725B); Comment
Request; Extension
AGENCY: Federal Energy Regulatory Commission, DOE.
[[Page 64922]]
ACTION: Notice of information collection and request for comments.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory
Commission (Commission or FERC) is soliciting public comment on the
currently approved information collection, FERC-725B (1902-0248),
Mandatory Reliability Standards, Critical Infrastructure Protection
(CIP)--Update to CIP-015. This update changes the CIP-015-1 standard to
CIP-015-2 which reflects the changes implemented through Order RD26-6-
000 issued on August 10, 2026.
DATES: Comments on the collections of information are due December 14,
2026.
ADDRESSES: Please submit comments via email to <a href="/cdn-cgi/l/email-protection#2b6f4a5f4a68474e4a594a45484e6b6d6e7968054c445d"><span class="__cf_email__" data-cfemail="1d597c697c5e71787c6f7c737e785d5b584f5e337a726b">[email protected]</span></a>.
You must specify Docket No. (RD26-6-000) in your email. If you are
unable to file electronically, comments may be filed by USPS mail or by
hand (including courier) delivery:
<bullet> Mail via U.S. Postal Service only, addressed to: Federal
Energy Regulatory Commission, Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
<bullet> Hand (including courier) delivery to: Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852.
Docket: To view comments and issuances in this docket, please visit
<a href="https://elibrary.ferc.gov/eLibrary/search">https://elibrary.ferc.gov/eLibrary/search</a>.
FOR FURTHER INFORMATION CONTACT: Kayla Williams may be reached by email
at <a href="/cdn-cgi/l/email-protection#1c587d687d5f70797d6e7d727f795c5a594e5f327b736a"><span class="__cf_email__" data-cfemail="85c1e4f1e4c6e9e0e4f7e4ebe6e0c5c3c0d7c6abe2eaf3">[email protected]</span></a>, or by telephone at (202) 502-6468.
SUPPLEMENTARY INFORMATION:
Title: FERC-725B (Mandatory Reliability Standards, Critical
Infrastructure Protection (CIP)).
OMB Control No.: 1902-0248.
Type of Request: Update to the currently approved information
collection requirements within Reliability Standard CIP-015-2.
Abstract: On June 18, 2026, the North American Electric Reliability
Corporation (NERC), the Commission-certified Electric Reliability
Organization (ERO), filed a petition with the Commission seeking
approval of proposed Critical Infrastructure Protection (CIP)
Reliability Standard CIP-015-2 (Cyber Security -- Internal Network
Security Monitoring). NERC also requested approval of the associated
implementation plan, violation risk factors, and violation severity
levels, and the retirement of the currently effective Reliability
Standard CIP-015-1. NERC states that proposed Reliability Standard CIP-
015-2 improves upon the currently approved Reliability Standard CIP-
015-1 by establishing requirements that extend internal network
security monitoring (INSM) to include electronic access control or
monitoring systems (EACMS) and physical access control systems (PACS)
outside of the electronic security perimeter. NERC explains the
proposed revisions prevent a potential gap in the coverage of the
standard that could allow an attacker to use compromised EACMS and PACS
outside the electronic security perimeter to access the operational
technology environment inside the electronic security perimeter. NERC
contends that proposed Reliability Standard CIP-015-2 addresses the
Commission's directive in Order No. 907, and as clarified in Order No.
907-A, to extend INSM beyond the electronic security perimeter to all
systems in an entity's CIP-networked environment.\1\
---------------------------------------------------------------------------
\1\ Critical Infrastructure Protection Reliability Standard CIP-
015-1--Cyber Security--Internal Network Security Monitoring, Order
No. 907, 191 FERC ] 61,224, order on clarification, Order No. 907-A,
192 FERC ] 61,171 (2025).
---------------------------------------------------------------------------
NERC's filing was published in the Federal Register, 91 FR 38413
(June 25, 2026), with interventions and protests due on or before July
20, 2026. Timely motions to intervene were filed by Ameren Illinois
Company, Ameren Transmission Company of Illinois, and Union Electric
Company. Pursuant to Rule 214 of the Commission's Rules of Practice and
Procedure, 18 CFR 385.214 (2025), the timely, unopposed motions to
intervene serve to make the entities that filed them parties to this
proceeding.
Type of Respondents: Distribution Provider, Generator Operator,
Generator Owner, Reliability Coordinator, Transmission Operator, and
Transmission Owner.
Estimate of Annual Burden: \2\ The Commission estimates the annual
public reporting burden for the information collection as:
---------------------------------------------------------------------------
\2\ The Commission defines burden as the total time, effort, or
financial resources expended by persons to generate, maintain,
retain, or disclose or provide information to or for a federal
agency. For further explanation of what is included in the
information collection burden, reference 5 Code of Federal
Regulations 1320.3.
\3\ The NERC Compliance Registry, as of August 2026, identifies
approximately 1,706 unique U.S. entities that are subject to
mandatory compliance with CIP Reliability Standards. Of this total,
we estimate that 360 entities will face an increased paperwork
burden under Reliability Standard CIP-015-2.
\4\ The estimates for cost per hour are $135.51/hour (averaged
based on the following occupations):
<bullet> Legal Occupations (90th percentile) (Occupation Code:
23-0000): $256.49/hour
<bullet> Electrical Engineer (mean) (Occupation Code: 17-2071):
$92.32/hour
<bullet> Office and Administrative Support (90th percentile)
(Occupation Code: 43-0000): $57.73/hour
The estimated hourly cost (salary plus benefits) is a
combination of the following categories from the Bureau of Labor
Statistics (BLS) website, June 12, 2026, links to reference,
Occupational Employment and Wage Statistics and <a href="http://www.bls.gov/oes/current/naics2_22.htm">http://www.bls.gov/oes/current/naics2_22.htm</a>.
FERC-725B--(Mandatory Reliability Standards for Critical Infrastructure Protection [CIP] Reliability Standards) Update to CIP-015-2
--------------------------------------------------------------------------------------------------------------------------------------------------------
Number and Annual number Average burden per Average
type of of responses Total number of response (hours) \4\ & Total annual burden (hours) & cost per
respondent \3\ per respondent responses cost per response total annual cost \5\ ($) respondent
(1) (2) (1) * (2) = (3) (4)..................... (3) * (4) = (5)............... (5) / (1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
CIP-015-2.................... 360 6 2,160 14 hrs.; $1,897.14...... 30,240 hrs.; $4,097,822.40.... $11,382.84
--------------------------------------------------------------------------------------------------------------------------
Total Burden of CIP-015-2 .............. ............... 2,160 ........................ 30,240 hrs.; $4,097,822.40.... ...........
--------------------------------------------------------------------------------------------------------------------------------------------------------
Comments: Comments are invited on: (1) whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use
[[Page 64923]]
of automated collection techniques or other forms of information
technology.
Dated: October 7, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-20880 Filed 10-9-26; 8:45 am]