Notice2026-20657
Ampersand Ogdensburg Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
October 8, 2026
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 194 (Thursday, October 8, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 194 (Thursday, October 8, 2026)]
[Notices]
[Pages 64366-64367]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-20657]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9821-109]
Ampersand Ogdensburg Hydro, LLC; Notice of Application Accepted
for Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: 9821-109.
c. Date Filed: May 30, 2025.
d. Applicant: Ampersand Ogdensburg Hydro, LLC (Ampersand).
e. Name of Project: Ogdensburg Hydroelectric Project.
f. Location: On the Oswegatchie River in the city of Ogdensburg,
St. Lawrence County, New York.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Jason Huang, Director, 717 Atlantic Avenue,
Suite 1A, Boston, MA 02111; telephone at (617) 933-7200; email at
<a href="/cdn-cgi/l/email-protection#abc1cad8c4c5c3ebcac6dbced9d8cac5cfcec5ced9ccd285c8c4c6"><span class="__cf_email__" data-cfemail="462c273529282e06272b3623343527282223282334213f6825292b">[email protected]</span></a>.
i. FERC Contact: Joshua Dub, Project Coordinator, Great Lakes
Branch, Division of Hydropower Licensing; telephone at (202) 502-8138;
email at <a href="/cdn-cgi/l/email-protection#5c16332f34293d7218293e1c3a392e3f723b332a"><span class="__cf_email__" data-cfemail="f7bd98849f8296d9b38295b791928594d9909881">[email protected]</span></a>.
j. Deadline for filing motions to intervene and protests: December
4, 2026 by 5:00 p.m. Eastern Daylight Time.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests using the Commission's eFiling system
at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit
brief comments up to 10,000 characters, without prior registration,
using the eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For assistance, please contact FERC Online Support
at <a href="/cdn-cgi/l/email-protection#eea8abbcada1808287808bbd9b9e9e819c9aae888b9c8dc0898198"><span class="__cf_email__" data-cfemail="2f696a7d6c60414346414a7c5a5f5f405d5b6f494a5d4c01484059">[email protected]</span></a>, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, you may submit a paper
copy. Submissions sent via the U.S. Postal Service must be addressed
to: Debbie Anne A. Reese, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Debbie-
Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, MD 20852. All filings must clearly identify
the project name and docket number on the first
[[Page 64367]]
page: Ogdensburg Hydroelectric Project (P-9821-109).
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted for filing but is not ready
for environmental analysis at this time.
l. Project Description: The project consists of a 504.5-foot-long,
12-foot-high concrete dam that includes: (1) a 130-foot-long, 76-foot-
wide powerhouse that includes: (a) an intake structure with five
stoplog gates and trashracks with 1-inch clear bar spacing; and (b)
five 596-kilowatt (kW) horizontal Kaplan turbine-generator units (Units
1 to 5), for a total installed capacity of 2,980 kW; (2) a 38.5-foot-
long non-overflow section with three 9-foot-long sluice gates; (3) a
330-foot-long ogee spillway with a crest elevation of 258.0 feet above
the National Geodetic Vertical Datum of 1929 (NGVD 29); and (4) a 6-
foot-long east abutment. The dam creates an impoundment that has a
surface area of 290 acres at a normal maximum surface elevation of 258
feet NGVD 29.
Water from the impoundment flows to Units 1 through 4, and then to
a 235-foot-long tailrace that empties into the Oswegatchie River
immediately downstream of the dam. Water also flows from the
impoundment to Unit 5, and then to a 75-foot-long tailrace that empties
into the Oswegatchie River approximately 620 feet downstream of the
dam.
Electricity generated at the powerhouse is transmitted to the
electric grid via 150-foot-long, 4.16-kilovolt (kV) generator lead
lines, a 4.16/13.2-kV step-up transformer, and a 75-foot-long, 13.2-kV
transmission line.
Project recreation facilities include a trailer boat access site
and parking area on the east shore of the impoundment approximately
750-feet-upstream of the dam and a park on the east bank of the
tailrace approximately 135-feet-downstream of the dam.
Ampersand proposes to continue operating the project in a run-of-
river mode, and discharge up to 730 cfs through Unit 5, when Unit 5 is
operating; or discharge 730 cfs or inflow, whichever is less, over the
spillway when Unit 5 is not operating.
m. A copy of the application can be viewed on the Commission's
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support. A copy is also available for inspection and reproduction at 19
Mill Street, Ogdensburg, NY 13669.
You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. For public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, contact the Office
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#a0eff0f0e0c6c5d2c38ec7cfd6"><span class="__cf_email__" data-cfemail="80cfd0d0c0e6e5f2e3aee7eff6">[email protected]</span></a>.
o. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name of the person
protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain
copies of the application directly from the applicant. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application.
p. Procedural Schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Scoping Notice....................... October 2026.
Scoping Comments Due....................... November 2026.
Filing of Motions to Intervene and Protests December 2026.
Issue Notice of Ready for Environmental January 2027.
Analysis.
Filing of Comments, Recommendations, Terms, March 2027.
Conditions, and Prescriptions.
Filing of Reply Comments................... April 2027.
------------------------------------------------------------------------
(Authority: 18 CFR 2.1)
Dated: October 5, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-20657 Filed 10-7-26; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on October 8, 2026.