<html>
<head>
<title>Federal Register, Volume 91 Issue 194 (Thursday, October 8, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 194 (Thursday, October 8, 2026)]
[Notices]
[Pages 64372-64373]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-20656]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9821-109]
Ampersand Ogdensburg Hydro, LLC; Notice of Scoping Period
Requesting Comments on Environmental Issues for the Proposed Ogdensburg
Hydroelectric Project
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: 9821-109.
c. Date Filed: May 30, 2025.
d. Applicant: Ampersand Ogdensburg Hydro, LLC (Ampersand).
e. Name of Project: Ogdensburg Hydroelectric Project.
f. Location: On the Oswegatchie River in the city of Ogdensburg,
St. Lawrence County, New York.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Jason Huang, Director, 717 Atlantic Avenue,
Suite 1A, Boston, MA 02111; telephone at (617) 933-7200; email at
<a href="/cdn-cgi/l/email-protection#0e646f7d6160664e6f637e6b7c7d6f606a6b606b7c6977206d6163"><span class="__cf_email__" data-cfemail="117b70627e7f7951707c61746362707f75747f746376683f727e7c">[email protected]</span></a>.
i. FERC Contact: Joshua Dub, Project Coordinator, Great Lakes
Branch, Division of Hydropower Licensing; telephone at (202) 502-8138;
email at <a href="/cdn-cgi/l/email-protection#cd87a2bea5b8ace389b8af8daba8bfaee3aaa2bb"><span class="__cf_email__" data-cfemail="c18baeb2a9b4a0ef85b4a381a7a4b3a2efa6aeb7">[email protected]</span></a>.
j. The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document that will discuss
the environmental effects of relicensing the Ogdensburg Hydroelectric
Project. The Commission will use this environmental document in its
decision-making process to determine whether to issue a new license for
the project.
k. This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. This notice is intended to advise all
participants as to the potential scope of the National Environmental
Policy Act (NEPA) document and to seek additional information pertinent
to this analysis. Commission staff does not intend to issue a separate
scoping document.
As part of the NEPA review process, the Commission takes into
account concerns the public may have about proposals and the
environmental effects that could result from its action whenever it
considers the issuance of a hydropower license. This gathering of
public input is referred to as ``scoping.'' The main goal of the
scoping process is to focus the analysis in the environmental document
on the important environmental issues.
l. Scoping Comments: By this notice, the Commission requests
written public comments on the scope of issues to address in the
environmental document. To ensure that your comments are timely and
properly recorded, please submit your comments so that the Commission
receives them in Washington, DC on or before 5:00 p.m. Eastern Daylight
Time on November 4, 2026.
Comments should focus on the potential environmental effects and
reasonable alternatives. Your input will help the Commission staff
determine what issues they need to evaluate in the environmental
document. Commission staff will consider all written comments during
the preparation of the environmental document.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief
comments up to 10,000 characters, without prior registration, using the
eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. For
assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#31777463727e5f5d585f54624441415e434571575443521f565e47"><span class="__cf_email__" data-cfemail="f8bebdaabbb7969491969dab8d8888978a8cb89e9d8a9bd69f978e">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Debbie Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Debbie-Anne A. Reese,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. All filings must clearly identify the project name
and docket number on the first page: Ogdensburg Hydroelectric Project
(P-9821-109).
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
m. The application is not ready for environmental analysis at this
time.
n. Project Description: The project consists of a 504.5-foot-long,
12-foot-high concrete dam that includes: (1) a 130-foot-long, 76-foot-
wide powerhouse that includes: (a) an intake structure with five
stoplog gates and trashracks with 1-inch clear bar spacing; and (b)
five 596-kilowatt (kW) horizontal Kaplan turbine-generator units (Units
1 to 5), for a total installed capacity of 2,980 kW; (2) a 38.5-foot-
long non-overflow section with three 9-foot-long sluice gates; (3) a
330-foot-long ogee spillway with a crest elevation of 258.0 feet above
the National Geodetic Vertical Datum of 1929 (NGVD 29); and (4) a 6-
foot-long east abutment. The dam creates an impoundment that has a
surface area of 290 acres at a normal maximum surface elevation of 258
feet NGVD 29.
Water from the impoundment flows to Units 1 through 4, and then to
a 235-foot-long tailrace that empties into the Oswegatchie River
immediately downstream of the dam. Water also flows from the
impoundment to Unit 5, and then to a 75-foot-long tailrace that empties
into the Oswegatchie River approximately 620 feet downstream of the
dam.
Electricity generated at the powerhouse is transmitted to the
[[Page 64373]]
electric grid via 150-foot-long, 4.16-kilovolt (kV) generator lead
lines, a 4.16/13.2-kV step-up transformer, and a 75-foot-long, 13.2-kV
transmission line.
Project recreation facilities include a trailer boat access site
and parking area on the east shore of the impoundment approximately
750-feet-upstream of the dam and a park on the east bank of the
tailrace approximately 135-feet-downstream of the dam.
Ampersand proposes to continue operating the project in a run-of-
river mode, and discharge up to 730 cfs through Unit 5, when Unit 5 is
operating; or discharge 730 cfs or inflow, whichever is less, over the
spillway when Unit 5 is not operating.
o. A copy of the application, with details of the proposed project,
can be viewed on the Commission's website at <a href="https://www.ferc.gov">https://www.ferc.gov</a> using
the ``eLibrary'' link. Enter the project's docket number excluding the
last three digits in the docket number field to access the document (P-
9821). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#a9efecfbeae6c7c5c0c7ccfadcd9d9c6dbdde9cfccdbca87cec6df"><span class="__cf_email__" data-cfemail="a0e6e5f2e3efceccc9cec5f3d5d0d0cfd2d4e0c6c5d2c38ec7cfd6">[email protected]</span></a>,
(866) 208-3676 (toll free), or (202) 502-8659 (TTY).
p. NEPA Process and the Environmental Document: Any environmental
document issued by the Commission will discuss effects that could occur
as a result of the project's relicensing under the relevant general
resource areas, such as:
<bullet> geology and soils;
<bullet> aquatic resources;
<bullet> terrestrial resources;
<bullet> threatened and endangered species;
<bullet> recreation, land use, and aesthetic resources;
<bullet> cultural resources; and
<bullet> developmental resources.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project and make recommendations on
how to lessen or avoid effects on the various resource areas. Your
comments will help Commission staff identify and focus on the issues
that might have an effect on the human environment and potentially
eliminate others from further discussion in the environmental document.
Following this scoping period, Commission staff will determine
whether to prepare an Environmental Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or EIS will present Commission staff's
independent analysis of the issues. If Commission staff prepares an EA,
a Notice of Intent to Prepare an Environmental Assessment will be
issued. The EA may be issued for an allotted public comment period. The
Commission would consider timely comments on the EA before making its
decision regarding the proposed project. If Commission staff prepares
an EIS, a Notice of Intent to Prepare an Environmental Impact Statement
will be issued. Staff will then prepare a draft EIS which will be
issued for public comment. Commission staff will consider all timely
comments received during the comment period on the draft EIS and revise
the document, as necessary, before issuing a final EIS. Any EA or draft
and final EIS will be available in electronic format in the public
record through eLibrary. If eSubscribed, you will receive instant email
notification when the environmental document is issued (see paragraph
(r) of this notice for instructions on using eSubscription).
q. For public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, contact the Office
of Public Participation at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#b0ffe0e0f0d6d5c2d39ed7dfc6"><span class="__cf_email__" data-cfemail="ffb0afafbf999a8d9cd1989089">[email protected]</span></a>.
r. This notice is being distributed to the Commission's official
mailing list for the project and any additional entities on the
applicant's distribution list. You can access the Commission's official
mailing list for this project at <a href="https://ferconline.ferc.gov/MailListLOR.aspx?Type=MailList&ListVar=P-9821">https://ferconline.ferc.gov/MailListLOR.aspx?Type=MailList&ListVar=P-9821</a>. If you want to receive
future mailings for the project and are not included on the
Commission's official mailing list, or if you wish to be removed from
the Commission's official mailing list, please send your request by
email to <a href="/cdn-cgi/l/email-protection#1a5c5f485955747673747f496f6a6a75686e5a7c7f6879347d756c"><span class="__cf_email__" data-cfemail="01474453424e6f6d686f64527471716e737541676473622f666e77">[email protected]</span></a>. In lieu of an email request, you
may submit a paper request. Submissions sent via the U.S. Postal
Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, MD 20852. All written or emailed
requests must specify your wish to be added to or removed from the
mailing list, and must clearly identify the following on the first
page: Ogdensburg Hydroelectric Project No. 9821-109.
Additionally, the Commission offers a free service called
eSubscription, which makes it easy to stay informed of all issuances
and submittals regarding the dockets/projects to which you subscribe.
These instant email notifications are the fastest way to receive
notification and provide a link to the document files which can reduce
the amount of time you spend researching proceedings. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to register for eSubscription.
In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via
the internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>)
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document (P-9821-
109). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#682e2d3a2b27060401060d3b1d1818071a1c280e0d1a0b460f071e"><span class="__cf_email__" data-cfemail="7f393a2d3c30111316111a2c0a0f0f100d0b3f191a0d1c51181009">[email protected]</span></a>, (866)
208-3676 (toll free), or (202) 502-8659 (TTY).
(Authority: 18 CFR 2.1)
Dated: October 5, 2026.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2026-20656 Filed 10-7-26; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on October 8, 2026.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.