The U.S. Nuclear Regulatory Commission (NRC) is providing public notice each week, for four consecutive weeks, beginning October 1, 2026, of receipt and availability of the first part of a phased construction permit application, including a limited work authorization (LWA) request, from SMR, LLC, on behalf of Palisades SMR, LLC, a wholly-owned subsidiary of Holtec International (collectively, Holtec), for a dual-unit SMR-300 plant located at the Palisades Energy Center (PEC) in Covert, Michigan. The units are individually named Pioneer Unit 1 and Pioneer Unit 2. This is the first of four consecutive weekly notifications.
Full Text
<html>
<head>
<title>Federal Register, Volume 91 Issue 189 (Thursday, October 1, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 189 (Thursday, October 1, 2026)]
[Notices]
[Pages 62565-62566]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-20094]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-616 and 50-617; NRC-2026-0265]
SMR, LLC; Palisades SMR, LLC; Pioneer Units 1 and 2; Phased
Construction Permit Application--Limited Work Authorization
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice; receipt.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is providing
public notice each week, for four consecutive weeks, beginning October
1, 2026, of receipt and availability of the first part of a phased
construction permit application, including a limited work authorization
(LWA) request, from SMR, LLC, on behalf of Palisades SMR, LLC, a
wholly-owned subsidiary of Holtec International (collectively, Holtec),
for a dual-unit SMR-300 plant located at the Palisades Energy Center
(PEC) in Covert, Michigan. The units are individually named Pioneer
Unit 1 and Pioneer Unit 2. This is the first of four consecutive weekly
notifications.
DATES: October 1, 2026.
ADDRESSES: Please refer to Docket ID NRC-2026-0265 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
<bullet> Federal Rulemaking Website: Go to <a href="https://www.regulations.gov">https://www.regulations.gov</a> and search for Docket ID NRC-2026-0265. Address
questions about Docket IDs in <a href="http://Regulations.gov">Regulations.gov</a> to Bridget Curran;
telephone: 301-415-1003; email: <a href="/cdn-cgi/l/email-protection#41033328252624356f02343333202f012f33226f262e37"><span class="__cf_email__" data-cfemail="dc9eaeb5b8bbb9a8f29fa9aeaebdb29cb2aebff2bbb3aa">[email protected]</span></a>. For technical
questions, contact the individual(s)
[[Page 62566]]
listed in the FOR FURTHER INFORMATION CONTACT section of this
document.
<bullet> NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at <a href="https://www.nrc.gov/reading-rm/adams.html">https://www.nrc.gov/reading-rm/adams.html</a>. To begin the search, select ``Begin ADAMS Public Search.''
For problems with ADAMS, please contact the NRC's Public Document Room
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email
to <a href="/cdn-cgi/l/email-protection#0e5e4a5c205c6b7d617b7c6d6b4e607c6d20696178"><span class="__cf_email__" data-cfemail="68382c3a463a0d1b071d1a0b0d28061a0b460f071e">[email protected]</span></a>. The Pioneer Units 1 and 2 LWA application is
available in ADAMS under Package Accession No. ML25365A983.
<bullet> NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
<a href="/cdn-cgi/l/email-protection#f7a7b3a5d9a592849882859492b7998594d9909881"><span class="__cf_email__" data-cfemail="2b7b6f7905794e58445e59484e6b455948054c445d">[email protected]</span></a> or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
FOR FURTHER INFORMATION CONTACT: Victoria Huckabay, telephone: 301-415-
5183, email: <a href="/cdn-cgi/l/email-protection#b2e4dbd1c6ddc0dbd39cfac7d1d9d3d0d3cbf2dcc0d19cd5ddc4"><span class="__cf_email__" data-cfemail="86d0efe5f2e9f4efe7a8cef3e5ede7e4e7ffc6e8f4e5a8e1e9f0">[email protected]</span></a> and Jason Lising, telephone 301-
415-1119; email: <a href="/cdn-cgi/l/email-protection#0e446f7d61602042677d6760694e607c6d20696178"><span class="__cf_email__" data-cfemail="2e644f5d41400062475d4740496e405c4d00494158">[email protected]</span></a>. Both are staff of the Office of
Advanced Reactors at the U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Discussion
On December 31, 2025, SMR, LLC, on behalf of Palisades SMR, LLC, a
wholly-owned subsidiary of Holtec International (collectively, Holtec),
filed with the NRC, the first part (Part 1) of a phased construction
permit application for a utilization facility pursuant to Section 103
of the Atomic Energy Act and part 50 of title 10 of the Code of Federal
Regulations (10 CFR), ``Domestic Licensing of Production and
Utilization Facilities.'' Part 1 of the application includes a LWA
request pursuant to 10 CFR 50.10(d), ``Request for limited work
authorization''; three exemption requests; and a comprehensive
environmental report (ER). In its LWA request, Holtec seeks NRC
approval to conduct certain early construction activities of a dual-
unit SMR-300 plant at the PEC in Covert, Michigan. Holtec also states
that the comprehensive ER addresses the environmental impacts
associated with LWA activities (including the requested exemptions),
the remainder of construction to complete the plant, and plant
operations. Holtec submitted Part 1 of its application as part of a
phased application approach for a construction permit for a utilization
facility, as described in 10 CFR 2.101(a)(9) and 10 CFR 2.600(d).
On February 27, 2026, the NRC issued a Federal Register notice (91
FR 9892) stating that the NRC staff accepted Part 1 of the phased
construction permit application for docketing and will perform a
detailed technical review. These weekly notices of receipt and
availability of the application are being provided in accordance with
the requirements in 10 CFR 50.43(a)(3).
(Authority: 42 U.S.C. 2011 et seq.)
Dated: September 29, 2026.
For the Nuclear Regulatory Commission.
Michelle Hayes,
Chief, Advanced Reactor Licensing Branch 2, Division of Advanced
Reactor Licensing, Office of Advanced Reactors.
[FR Doc. 2026-20094 Filed 9-30-26; 8:45 am]
BILLING CODE 7590-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.