Skip to main content
Notice2026-19812

Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
September 29, 2026

Issuing agencies

Nuclear Regulatory Commission

Abstract

Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person.

Full Text

<html>
<head>
<title>Federal Register, Volume 91 Issue 187 (Tuesday, September 29, 2026)</title>
</head>
<body><pre>
[Federal Register Volume 91, Number 187 (Tuesday, September 29, 2026)]
[Notices]
[Pages 61466-61475]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2026-19812]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2026-4555]


Biweekly Notice; Applications and Amendments to Facility 
Operating Licenses and Combined Licenses Involving No Significant 
Hazards Considerations

AGENCY: Nuclear Regulatory Commission.

ACTION: Biweekly notice.

-----------------------------------------------------------------------

SUMMARY: Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, 
as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is 
publishing this regular biweekly notice. The Act requires the 
Commission to publish notice of any amendments issued, or proposed to 
be issued, and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license or combined 
license, as applicable, upon a determination by the Commission that 
such amendment involves no significant hazards consideration (NSHC), 
notwithstanding the pendency before the Commission of a request for a 
hearing from any person.

DATES: Comments must be filed by October 29, 2026. A request for a 
hearing or petitions for leave to intervene must be filed by December 
28, 2026. This biweekly notice includes all amendments issued, or 
proposed to be issued, from September 1, 2026, to September 14, 2026. 
The last biweekly notice was published on September 15, 2026.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal rulemaking website.
    <bullet> Federal rulemaking website: Go to <a href="https://www.regulations.gov">https://www.regulations.gov</a> and search for Docket ID NRC-2026-4555. Address 
questions about Docket IDs in <a href="http://Regulations.gov">Regulations.gov</a> to Bridget Curran; 
telephone: 301-415-1003; email: <a href="/cdn-cgi/l/email-protection#efad9d868b888a9bc1ac9a9d9d8e81af819d8cc1888099"><span class="__cf_email__" data-cfemail="fbb989929f9c9e8fd5b88e89899a95bb958998d59c948d">[email&#160;protected]</span></a>. For technical 
questions, contact the individual(s) listed in the For Further 
Information Contact section of this document.
    <bullet> Mail comments to: Office of Nuclear Material Safety and 
Safeguards, Mail Stop: TWFN-5-A85, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, ATTN: Guidance and Publications Branch.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Susan Lent, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-1365; email: <a href="/cdn-cgi/l/email-protection#5f0c2a2c3e3171133a312b1f312d3c71383029"><span class="__cf_email__" data-cfemail="0c5f797f6d6222406962784c627e6f226b637a">[email&#160;protected]</span></a>.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2026-4555, facility name, unit 
number(s), docket number(s), application date, and subject when 
contacting the NRC about the availability of information for this 
action. You may obtain publicly available information related to this 
action by any of the following methods:
    <bullet> Federal Rulemaking Website: Go to <a href="https://www.regulations.gov">https://www.regulations.gov</a> and search for Docket ID NRC-2026-4555.
    <bullet> NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at <a href="https://www.nrc.gov/reading-rm/adams.html">https://www.nrc.gov/reading-rm/adams.html</a>. To begin the search, select ``Begin ADAMS Public Search.'' 
For problems with ADAMS, please contact the NRC's Public Document Room 
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email 
to <a href="/cdn-cgi/l/email-protection#f5a5b1a7dba790869a80879690b59b8796db929a83"><span class="__cf_email__" data-cfemail="db8b9f89f589bea8b4aea9b8be9bb5a9b8f5bcb4ad">[email&#160;protected]</span></a>. The ADAMS accession number for each document 
referenced (if it is available in ADAMS) is provided the first time 
that it is mentioned in this document.
    <bullet> NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
<a href="/cdn-cgi/l/email-protection#1b4b5f4935497e68746e69787e5b756978357c746d"><span class="__cf_email__" data-cfemail="a1f1e5f38ff3c4d2ced4d3c2c4e1cfd3c28fc6ced7">[email&#160;protected]</span></a> or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. Eastern Time (ET), Monday through Friday, except 
Federal holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (<a href="https://www.regulations.gov">https://www.regulations.gov</a>). Please 
include Docket ID NRC-2026-4555, facility name, unit number(s), docket 
number(s), application date, and subject, in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
<a href="https://www.regulations.gov">https://www.regulations.gov</a> as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses and Combined Licenses and Proposed No Significant 
Hazards Consideration Determination

    For the facility-specific amendment requests shown in this notice, 
the Commission finds that the licensees' analyses provided, consistent 
with section 50.91 of title 10 of the Code of Federal Regulations (10 
CFR) ``Notice for public comment; State consultation,'' are sufficient 
to support the proposed determinations that these amendment requests 
involve NSHC. Under the Commission's regulations in 10 CFR 50.92, 
operation of the facilities in accordance with the proposed amendments 
would not (1) involve a significant increase in the probability or 
consequences of an accident previously evaluated; or (2) create the 
possibility of a new or different kind of accident from any accident 
previously evaluated; or (3) involve a significant reduction in a 
margin of safety.
    The Commission is seeking public comments on these proposed 
determinations. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determinations.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue any of these license amendments before expiration 
of the 60-day period provided that its final determination is that the 
amendment involves NSHC. In addition, the Commission may issue any of 
these amendments prior to the expiration of

[[Page 61467]]

the 30-day comment period if circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example in derating or shutdown of the facility. If the Commission 
takes action on any of these amendments prior to the expiration of 
either the comment period or the notice period, it will publish in the 
Federal Register a notice of issuance. If the Commission makes a final 
NSHC determination for any of these amendments, any hearing will take 
place after issuance. The Commission expects that the need to take 
action on any amendment before 60 days have elapsed will occur very 
infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by any of these 
actions may file a request for a hearing and petition for leave to 
intervene (petition) with respect to that action. Petitions shall be 
filed in accordance with the Commission's ``Agency Rules of Practice 
and Procedure'' in 10 CFR part 2. Interested persons should consult 10 
CFR 2.309. If a petition is filed, the Commission or a presiding 
officer will rule on the petition and, if appropriate, a notice of a 
hearing will be issued.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice in accordance with the filing instructions 
in the ``Electronic Submissions (E-Filing)'' section of this document. 
Petitions and motions for leave to file new or amended contentions that 
are filed after the deadline will not be entertained absent a 
determination by the presiding officer that the filing demonstrates 
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) 
through (iii).
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration, which will serve to establish when 
the hearing is held. If the final determination is that the license 
amendment request involves no significant hazards consideration, the 
Commission may issue the amendment and make it immediately effective, 
notwithstanding the request for a hearing. Any hearing would take place 
after issuance of the amendment. If the final determination is that the 
license amendment request involves a significant hazards consideration, 
then any hearing held would take place before the issuance of the 
amendment unless the Commission finds an imminent danger to the health 
or safety of the public, in which case it will issue an appropriate 
order or rule under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or designated agency thereof, may submit a petition to the 
Commission to participate as a party under 10 CFR 2.309(h) no later 
than 60 days from the date of publication of this notice. 
Alternatively, a State, local governmental body, Federally recognized 
Indian Tribe, or designated agency thereof, may participate as a non-
party under 10 CFR 2.315(c).
    For information about filing a petition and about participation by 
a person not a party under 10 CFR 2.315, see ADAMS Accession No. 
ML20340A053 (<a href="https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053">https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053</a>) and the NRC's public website 
(<a href="https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate">https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate</a>).

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as further 
discussed, is granted. Detailed guidance on electronic submissions is 
located in the ``Guidance for Electronic Submissions to the NRC'' 
(ADAMS Accession No. ML13031A056), and on the NRC's public website 
(<a href="https://www.nrc.gov/site-help/e-submittals.html">https://www.nrc.gov/site-help/e-submittals.html</a>).
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at <a href="/cdn-cgi/l/email-protection#a8e0cdc9dac1c6cf86ecc7cbc3cddce8c6dacb86cfc7de"><span class="__cf_email__" data-cfemail="054d6064776c6b622b416a666e6071456b77662b626a73">[email&#160;protected]</span></a>, or by 
telephone at 301-415-1677, to: (1) request a digital identification 
(ID) certificate, which allows the participant (or their counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or their counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website (<a href="https://www.nrc.gov/site-help/e-submittals/getting-started.html">https://www.nrc.gov/site-help/e-submittals/getting-started.html</a>). After a digital ID certificate is 
obtained and a docket is created, the participant must submit 
adjudicatory documents in the Portable Document Format. Guidance on 
submissions is available on the NRC's public website (<a href="https://www.nrc.gov/site-help/electronic-sub-ref-mat.html">https://www.nrc.gov/site-help/electronic-sub-ref-mat.html</a>). A filing is 
considered complete at the time the document is submitted through the 
NRC's E-Filing system. To be timely, an electronic filing must be 
submitted to the E-Filing system no later than 11:59 p.m. ET on the due 
date. Upon receipt of a transmission, the E-Filing system time-stamps 
the document and sends the submitter an email confirming receipt of the 
document. The E-Filing system also distributes an email that provides 
access to the document to the NRC's Office of the General Counsel and 
any others who have advised the Office of the Secretary that they wish 
to participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed in order to obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website (<a href="https://www.nrc.gov/site-help/e-submittals.html">https://www.nrc.gov/site-help/e-submittals.html</a>), by 
email to <a href="/cdn-cgi/l/email-protection#0548564d412b5760766a70776660456b77662b626a73"><span class="__cf_email__" data-cfemail="165b455e523844736579636475735678647538717960">[email&#160;protected]</span></a>, or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., ET, Monday through Friday, except Federal holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner

[[Page 61468]]

are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available on the 
NRC's public website (<a href="https://ehd.nrc.gov">https://ehd.nrc.gov</a>), unless otherwise excluded 
pursuant to an order of the presiding officer. If you do not have an 
NRC-issued digital ID certificate as previously described, click 
``cancel'' when the link requests certificates and you will be 
automatically directed to the NRC's electronic hearing docket where you 
will be able to access any publicly available documents in a particular 
hearing docket. Participants are requested not to include personal 
privacy information such as social security numbers, home addresses, or 
personal phone numbers in their filings, unless an NRC regulation or 
other law requires submission of such information. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants should not include copyrighted materials in 
their submission.
    The following table provides the plant name, docket number, date of 
application, ADAMS accession number, and location in the application of 
the licensees' proposed NSHC determinations. For further details with 
respect to these license amendment applications, see the applications 
for amendment, which are available for public inspection in ADAMS. For 
additional direction on accessing information related to this document, 
see the ``Obtaining Information and Submitting Comments'' section of 
this document.

                       License Amendment Requests
------------------------------------------------------------------------
 
------------------------------------------------------------------------
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit
                   Nos. 2 and 3; New London County, CT
------------------------------------------------------------------------
Docket Nos.............................  50-336, 50-423.
Application date.......................  September 2, 2026.
ADAMS Accession No.....................  ML26246A991.
Location in Application of NSHC........  Pages 5-7 of the Enclosure.
Brief Description of Amendments........  The amendments would adopt
                                          Technical Specification (TS)
                                          Task Force (TSTF) Traveler 585
                                          (TSTF-585), ``Revise LCO
                                          [Limiting Condition for
                                          Operation] 3.0.3 to Require
                                          Managing Risk.'' TSTF-585
                                          revises LCO 3.0.3 to require
                                          assessing and managing plant
                                          risk whenever LCO 3.0.3 is
                                          entered. If the risk
                                          assessment determines that
                                          continuing plant operation is
                                          acceptable and other
                                          conditions are satisfied, 24
                                          hours from entry into LCO
                                          3.0.3 is permitted to initiate
                                          a shutdown. Otherwise,
                                          initiation of the shutdown is
                                          required immediately. The
                                          proposed amendments would also
                                          revise or add some TS Required
                                          Actions to direct a plant
                                          shutdown instead of entry into
                                          LCO 3.0.3.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   William (Bill) S. Blair, Senior
 Address.                                 Counsel, Dominion Energy, Inc.
                                          120 Tredegar Street, RS-2,
                                          Richmond, VA 23219.
NRC Project Manager, Telephone Number..  Robert Kuntz, 301-415-3733.
------------------------------------------------------------------------
    Energy Northwest; Columbia Generating Station; Benton County, WA
------------------------------------------------------------------------
Docket No..............................  50-397.
Application date.......................  July 28, 2026.
ADAMS Accession No.....................  ML26210A268.
Location in Application of NSHC........  Pages 1-3 of the Enclosure.
Brief Description of Amendment.........  The proposed amendment would
                                          revise the Columbia Generating
                                          Station (Columbia) Technical
                                          Specification (TS) for
                                          adoption of Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-602,
                                          ``Revise the Ventilation
                                          Filter Testing Program to
                                          Permit Alternate Challenge
                                          Agents,'' which is an approved
                                          change to the Standard TS,
                                          into the Columbia TS. Traveler
                                          TSTF-602 revises the
                                          Ventilation Filter Testing
                                          Program to permit the use of
                                          alternate challenge agents
                                          when performing in place
                                          testing of engineered safety
                                          feature ventilation system
                                          high efficiency particulate
                                          air filters and charcoal
                                          adsorbers. The alternative
                                          challenge agents are permitted
                                          by industry standards and NRC
                                          Regulatory Guides.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Ryan Lukson, Assistant General
 Address.                                 Counsel, Energy Northwest, MD
                                          1020, P.O. Box 968, Richland,
                                          WA 99352.
NRC Project Manager, Telephone Number..  Mahesh Chawla, 301-415-8371.
------------------------------------------------------------------------
 Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St.
                           Charles Parish, LA
------------------------------------------------------------------------
Docket No..............................  50-382.
Application date.......................  June 25, 2026.
ADAMS Accession No.....................  ML26176A287.
Location in Application of NSHC........  Pages 4-6 of the Enclosure.

[[Page 61469]]

 
Brief Description of Amendment.........  The proposed amendment would
                                          revise the Waterford Steam
                                          Electric Station, Unit 3,
                                          technical specifications by
                                          removing Note 11 from Table
                                          4.3-1, which currently
                                          requires the Reactor Trip
                                          Breaker Channel Functional
                                          Test to be performed at least
                                          every 6 weeks. The proposed
                                          change would allow the
                                          surveillance frequency for
                                          this test to be established
                                          and modified under the
                                          Surveillance Frequency Control
                                          Program.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Susan Raimo, Associate General
 Address.                                 Counsel--Nuclear, 101
                                          Constitution Avenue NW,
                                          Washington, DC 20001.
NRC Project Manager, Telephone Number..  Theo Edwards, 301-415-1721.
------------------------------------------------------------------------
 Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St.
                           Charles Parish, LA
------------------------------------------------------------------------
Docket No..............................  50-382.
Application date.......................  June 17, 2026.
ADAMS Accession No.....................  ML26168A289.
Location in Application of NSHC........  Page 25 of the Enclosure.
Brief Description of Amendment.........  The proposed amendment would
                                          revise the Waterford Steam
                                          Electric Station, Unit 3
                                          Technical Specifications (TSs)
                                          based on Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-359,
                                          Revision 9, ``Increase
                                          Flexibility in Mode
                                          Restraints,'' which is an
                                          approved change to the
                                          standard technical
                                          specifications. Traveler TSTF-
                                          359 would revise the TS
                                          requirements for mode change
                                          limitations in Limiting
                                          Condition for Operation 3.0.4
                                          and Surveillance Requirement
                                          4.0.4. Entergy Operations,
                                          Inc., concluded that the
                                          license amendment request's no
                                          significant hazards
                                          consideration (NSHC) be
                                          incorporated reference to the
                                          NSHC contained within the
                                          transmittal of TSTF-359,
                                          Revision 9 (ML031190607).
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Susan Raimo, Associate General
 Address.                                 Counsel--Nuclear, 101
                                          Constitution Avenue NW,
                                          Washington, DC 20001.
NRC Project Manager, Telephone Number..  Theo Edwards, 301-415-1721.
------------------------------------------------------------------------
 Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St.
                           Charles Parish, LA
------------------------------------------------------------------------
Docket No..............................  50-382.
Application date.......................  June 17, 2026.
ADAMS Accession No.....................  ML26168A289.
Location in Application of NSHC........  Page 25 of the Enclosure.
Brief Description of Amendment.........  The proposed amendment would
                                          revise the Waterford Steam
                                          Electric Station, Unit 3
                                          Technical Specifications (TSs)
                                          based on Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-422,
                                          Revision 2, ``Change in
                                          Technical Specifications End
                                          States (CE NPSD-1186),'' which
                                          is an approved change to the
                                          standard technical
                                          specifications. Traveler TSTF-
                                          422 would revise TS
                                          requirements regarding
                                          selected Action End States.
                                          Entergy Operations, Inc.
                                          concluded that the license
                                          amendment request's no
                                          significant hazards
                                          consideration (NSHC) be
                                          incorporated reference to the
                                          NSHC contained within the
                                          transmittal of TSTF-422,
                                          Revision 2 (ML093570241).
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Susan Raimo, Associate General
 Address.                                 Counsel--Nuclear, 101
                                          Constitution Avenue NW,
                                          Washington, DC 20001.
NRC Project Manager, Telephone Number..  Theo Edwards, 301-415-1721.
------------------------------------------------------------------------
 Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St.
                           Charles Parish, LA
------------------------------------------------------------------------
Docket No..............................  50-382.
Application date.......................  June 17, 2026.
ADAMS Accession No.....................  ML26168A289.
Location in Application of NSHC........  Page 25 of the Enclosure.
Brief Description of Amendment.........  The proposed amendment would
                                          revise the Waterford Steam
                                          Electric Station, Unit 2
                                          Technical Specifications (TSs)
                                          based on Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-427,
                                          Revision 2, ``Allowance for
                                          Non Technical Specification
                                          Barrier Degradation on
                                          Supported System
                                          OPERABILITY,'' which is an
                                          approved change to the
                                          standard technical
                                          specifications. Entergy
                                          Operations, Inc., concluded
                                          that the license amendment
                                          request's no significant
                                          hazards consideration (NSHC)
                                          be incorporated reference to
                                          the NSHC contained within the
                                          transmittal of TSTF-427,
                                          Revision 2 (ML061240055).
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Susan Raimo, Associate General
 Address.                                 Counsel--Nuclear, 101
                                          Constitution Avenue NW,
                                          Washington, DC 20001.

[[Page 61470]]

 
NRC Project Manager, Telephone Number..  Theo Edwards, 301-415-1721.
------------------------------------------------------------------------
 Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St.
                           Charles Parish, LA
------------------------------------------------------------------------
Docket No..............................  50-382.
Application date.......................  June 17, 2026.
ADAMS Accession No.....................  ML26168A289.
Location in Application of NSHC........  Page 25 of the Enclosure.
Brief Description of Amendment.........  The proposed amendment would
                                          revise the Waterford Steam
                                          Electric Station, Unit 3
                                          Technical Specifications (TSs)
                                          based on Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-600,
                                          Revision 2, ``Revise the
                                          Reactor Coolant System (RCS)
                                          Pressure Isolation Valve (PIV)
                                          Leakage Testing Frequency,''
                                          which is an approved change to
                                          the standard technical
                                          specifications. Entergy
                                          Operations, Inc., concluded
                                          that the license amendment
                                          request's no significant
                                          hazard consideration (NSHC) be
                                          incorporated reference to the
                                          NSHC contained within the
                                          Safety Evaluation for TSTF-
                                          600, Revision 2 (ML25247A240).
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Susan Raimo, Associate General
 Address.                                 Counsel--Nuclear, 101
                                          Constitution Avenue NW,
                                          Washington, DC 20001.
NRC Project Manager, Telephone Number..  Theo Edwards, 301-415-1721.
------------------------------------------------------------------------
      Nine Mile Point Nuclear Station, LLC and Constellation Energy
Generation, LLC; Nine Mile Point Nuclear Station, Unit 2; Oswego County,
                                   NY
------------------------------------------------------------------------
Docket No..............................  50-410.
Application date.......................  July 29, 2026.
ADAMS Accession No.....................  ML26210A357.
Location in Application of NSHC........  Pages 3-4 of Attachment 1.
Brief Description of Amendment.........  The proposed amendment would
                                          revise the co-licensee name on
                                          the Renewed Facility Operating
                                          License (FOL) No. NPF-69 for
                                          Nine Mile Point Nuclear
                                          Station, Unit 2. Specifically,
                                          the Joint Applicants requested
                                          that Renewed FOL NPF-69 be
                                          amended to remove the co-
                                          licensee's name ``Long Island
                                          Lighting Company'' and rename
                                          the co-licensee as the ``Long
                                          Island Power Authority.''
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Jason Zorn, Associate General
 Address.                                 Counsel, Constellation Energy
                                          Generation, LLC, 101
                                          Constitution Ave. NW, Suite
                                          400 East, Washington, DC
                                          20001.
NRC Project Manager, Telephone Number..  Richard Guzman, 301-415-1030.
------------------------------------------------------------------------
   NorthStar Vallecitos, LLC; Nuclear Test Reactor; Alameda County, CA
------------------------------------------------------------------------
Docket No..............................  50-73.
Application date.......................  July 15, 2026.
ADAMS Accession No.....................  ML26196A395.
Location in Application of NSHC........  Pages 5-7 of Attachment 1.
Brief Description of Amendment.........  The proposed amendment would
                                          approve an interim
                                          decommissioning plan (DP) for
                                          the Vallecitos Nuclear Center
                                          Nuclear Test Reactor. In the
                                          application, NorthStar
                                          Vallecitos LLC, explained
                                          that, as allowed by 10 CFR
                                          50.82(b)(2), the proposed
                                          interim DP contained less
                                          detail than required in 10 CFR
                                          50.82(b)(4) because major
                                          dismantlement activities will
                                          be delayed until the fuel can
                                          be removed from the reactor.
                                          If the NRC staff approves the
                                          interim DP, the staff will
                                          incorporate the interim DP to
                                          the Nuclear Test Reactor
                                          Possession Only License by
                                          adding a license condition.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Gregory Di Carlo, Vice
 Address.                                 President and General Counsel,
                                          NorthStar Group Services,
                                          Inc., 15760 West Power Street,
                                          NA1A, Crystal River, FL 34428.
NRC Project Manager, Telephone Number..  Chris Allen, 301-415-6877.
------------------------------------------------------------------------
 Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant,
 Units 1 and 2; Appling County, GA; Southern Nuclear Operating Company,
Inc.; Joseph M. Farley Nuclear Plant, Units 1 and 2; Houston County, AL;
  Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
                 Plant, Units 1 and 2; Burke County, GA
------------------------------------------------------------------------
Docket Nos.............................  50-321, 50-366, 50-348, 50-364,
                                          50-424, 50-425.
Application date.......................  July 17, 2026.
ADAMS Accession No.....................  ML26198A310.
Location in Application of NSHC........  Pages E1-17-E1-19 of the
                                          Enclosure.

[[Page 61471]]

 
Brief Description of Amendments........  The proposed amendments would
                                          revise the previously approved
                                          license condition associated
                                          with the adoption of 10 CFR
                                          50.69, ``Risk-informed
                                          categorization and treatment
                                          of structures, systems and
                                          components for nuclear power
                                          reactors.'' Specifically, the
                                          proposed change would
                                          incorporate use of the
                                          Enhanced Risk-Informed
                                          Categorization Methodology for
                                          Pressure Boundary Components.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Leslie G. Allen, Vice President
 Address.                                 and General Counsel, Southern
                                          Nuclear Operating Co., Inc.,
                                          P.O. Box 1295, Birmingham, AL
                                          35201-1295.
NRC Project Manager, Telephone Number..  Dawnmathews Kalathiveettil, 301-
                                          415-5905.
------------------------------------------------------------------------
   STP Nuclear Operating Company; South Texas Project, Units 1 and 2;
                          Matagorda County, TX
------------------------------------------------------------------------
Docket Nos.............................  50-498, 50-499.
Application date.......................  August 26, 2026.
ADAMS Accession No.....................  ML26238A267.
Location in Application of NSHC........  Pages 2-4 of the Enclosure.
Brief Description of Amendments........  The proposed amendments would
                                          adopt Technical Specifications
                                          Task Force (TSTF) Traveler
                                          TSTF-602, ``Revise the
                                          Ventilation Filter Testing
                                          Program to Permit Alternate
                                          Challenge Agents,'' which is
                                          an approved change to the
                                          Standard Technical
                                          Specifications, into the South
                                          Texas Project's technical
                                          specifications. Traveler TSTF-
                                          602 revises the Ventilation
                                          Filter Testing Program to
                                          permit the use of alternate
                                          challenge agents when
                                          performing in place testing of
                                          Engineered Safety Feature
                                          ventilation system high
                                          efficiency particulate air
                                          filters and charcoal
                                          adsorbers.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Rachel L. Jackson-Owens, VP
 Address.                                 Chief Legal Officer, STP
                                          Nuclear Operating Company,
                                          P.O. Box 289, Wadsworth, TX
                                          77483.
NRC Project Manager, Telephone Number..  Thomas Byrd, 301-415-3719.
------------------------------------------------------------------------
   Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, Inc.;
  Susquehanna Steam Electric Station, Units 1 and 2; Luzerne County, PA
------------------------------------------------------------------------
Docket Nos.............................  50-387, 50-388.
Application date.......................  July 28, 2026.
ADAMS Accession No.....................  ML26209A270.
Location in Application of NSHC........  Pages 1-3 of Enclosure.
Brief Description of Amendments........  The proposed amendments would
                                          revise the Technical
                                          Specifications (TSs) at each
                                          facility based on Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF[dash]477,
                                          ``Add Action for Two
                                          Inoperable Control Room [Air
                                          Conditioning (AC)]
                                          Subsystems,'' which is an
                                          approved change to the
                                          standard technical
                                          specifications. TSTF-477
                                          revises Limiting Condition for
                                          Operation 3.7.4, ``Control
                                          Room Floor Cooling System,''
                                          by adding an Action Statement
                                          for two inoperable control
                                          room floor cooling subsystems.
                                          The new Action Statement
                                          allows a finite time to
                                          restore one control room floor
                                          cooling subsystem to operable
                                          status and requires
                                          verification, at 4-hour
                                          intervals, that control room
                                          temperature remains less than
                                          90 degrees Fahrenheit. The
                                          licensee requested that the
                                          license amendment request be
                                          reviewed under the
                                          consolidated line item
                                          improvement process.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Jason Usher, 600 Hamilton
 Address.                                 Street, Suite 600, Allentown,
                                          PA 18101.
NRC Project Manager, Telephone Number..  Richard Guzman, 301-415-1030.
------------------------------------------------------------------------
 Union Electric Company; Callaway Plant, Unit No. 1; Callaway County, MO
------------------------------------------------------------------------
Docket No..............................  50-483.
Application date.......................  July 28, 2026.
ADAMS Accession No.....................  ML26209A359 (package).
Location in Application of NSHC........  Pages 2-3 of the Enclosure.
Brief Description of Amendment.........  The proposed amendment would
                                          adopt Technical Specifications
                                          Task Force (TSTF) Traveler
                                          TSTF-600, ``Revise the Reactor
                                          Coolant System (RCS) Pressure
                                          Isolation Valve (PIV) Leakage
                                          Testing Frequency,'' which is
                                          an approved change to the
                                          standard technical
                                          specifications into the
                                          Callaway Plant Technical
                                          Specifications. TSTF-600
                                          revises the Surveillance
                                          Requirement to perform RCS PIV
                                          leakage testing to only
                                          reference the inservice
                                          testing program for the
                                          Frequency.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Jay E. Silberg, Pillsbury
 Address.                                 Winthrop Shaw Pittman LLP,
                                          1200 17th St. NW, Washington,
                                          DC 20036.
NRC Project Manager, Telephone Number..  Mahesh Chawla, 301-415-8371.
------------------------------------------------------------------------

[[Page 61472]]

 
 Union Electric Company; Callaway Plant, Unit No. 1; Callaway County, MO
------------------------------------------------------------------------
Docket No..............................  50-483.
Application date.......................  June 24, 2026.
ADAMS Accession No.....................  ML26175A310 (package).
Location in Application of NSHC........  Pages 3-4 of the Enclosure.
Brief Description of Amendment.........  The proposed amendment would
                                          revise the Callaway Plant,
                                          Unit No. 1 (Callaway)
                                          Technical Specification (TS)
                                          for adoption of Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-602,
                                          ``Revise the Ventilation
                                          Filter Testing Program to
                                          Permit Alternate Challenge
                                          Agents,'' which is an approved
                                          change to the standard
                                          technical specifications, into
                                          the Callaway TS. Traveler TSTF-
                                          602 revises the Ventilation
                                          Filter Testing Program to
                                          permit the use of alternate
                                          challenge agents when
                                          performing in-place testing of
                                          Engineered Safety Feature
                                          ventilation system high
                                          efficiency particulate air
                                          filters and charcoal
                                          adsorbers. The alternative
                                          challenge agents are permitted
                                          by industry standards and NRC
                                          Regulatory Guides.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Jay E. Silberg, Pillsbury
 Address.                                 Winthrop Shaw Pittman LLP,
                                          1200 17th St. NW, Washington,
                                          DC 20036.
NRC Project Manager, Telephone Number..  Mahesh Chawla, 301-415-8371.
------------------------------------------------------------------------
Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station,
                        Unit 1; Coffey County, KS
------------------------------------------------------------------------
Docket No..............................  50-482.
Application date.......................  August 10, 2026.
ADAMS Accession No.....................  ML26222A352.
Location in Application of NSHC........  Pages 2-4 of Attachment I.
Brief Description of Amendment.........  The proposed amendment would
                                          modify technical
                                          specifications to adopt
                                          Technical Specifications Task
                                          Force (TSTF) Standard
                                          Technical Specification Change
                                          Traveler, TSTF-602, ``Revise
                                          the Ventilation Filter Testing
                                          Program to Permit Alternate
                                          Challenge Agents,'' which is
                                          an approved change to the
                                          Standard Technical
                                          Specifications.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Chris Johnson, Corporate
 Address.                                 Counsel Director, Evergy, One
                                          Kansas City Place, 1KC-
                                          Missouri HQ 16, 1200 Main
                                          Street, Kansas City, MO 64105.
NRC Project Manager, Telephone Number..  Samson Lee, 301-415-3168.
------------------------------------------------------------------------

III. Notice of Issuance of Amendments to Facility Operating Licenses 
and Combined Licenses

    During the period since publication of the last biweekly notice, 
the Commission has issued the following amendments. The Commission has 
determined for each of these amendments that the application complies 
with the standards and requirements of the Atomic Energy Act of 1954, 
as amended (the Act), and the Commission's rules and regulations. The 
Commission has made appropriate findings as required by the Act and the 
Commission's rules and regulations in 10 CFR chapter I, which are set 
forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed NSHC 
determination, and opportunity for a hearing in connection with these 
actions, were published in the Federal Register as indicated in the 
safety evaluation for each amendment.
    Unless otherwise indicated, the Commission has determined that 
these amendments satisfy the criteria for categorical exclusion in 
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), 
no environmental impact statement or environmental assessment need be 
prepared for these amendments. If the Commission has prepared an 
environmental assessment under the special circumstances provision in 
10 CFR 51.22(b) and has made a determination based on that assessment, 
it is so indicated in the safety evaluation for the amendment.
    For further details with respect to each action, see the amendment 
and associated documents such as the Commission's letter and safety 
evaluation, which may be obtained using the ADAMS accession numbers 
indicated in the following table. The safety evaluation will provide 
the ADAMS accession numbers for the application for amendment and the 
Federal Register citation for any environmental assessment. All of 
these items can be accessed as described in the ``Obtaining Information 
and Submitting Comments'' section of this document.

                       License Amendment Issuances
------------------------------------------------------------------------
 
------------------------------------------------------------------------
     Omaha Public Power District; Fort Calhoun Station Unit, No. 1;
                          Washington County, NE
------------------------------------------------------------------------
Docket No..............................  50-285.
Amendment Date.........................  August 31, 2026.
ADAMS Accession No.....................  ML26243A251 (package).
Amendment No...........................  304.

[[Page 61473]]

 
Brief Description of Amendment.........  Amendment No. 304 for the Fort
                                          Calhoun Station, Unit 1 (FCS),
                                          approves Revision 3 of FCS's
                                          License Termination Plan
                                          (LTP). Revision 3 of the FCS
                                          LTP addresses changes needed
                                          to revise the dose calculation
                                          for the Auxiliary Building
                                          basement, the requirements for
                                          remediation, and survey
                                          methodologies in the LTP.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
  Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Units 1
                        and 2; Berrien County, MI
------------------------------------------------------------------------
Docket Nos.............................  50-315, 50-316.
Amendment Date.........................  September 9, 2026.
ADAMS Accession No.....................  ML26232A137.
Amendment Nos..........................  368 (Unit 1); 349 (Unit 2).
Brief Description of Amendments........  The amendments revised the
                                          technical specifications (TSs)
                                          based on Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-596,
                                          Revision 2, ``Expand the
                                          Applicability of the
                                          Surveillance Frequency Control
                                          Program (SFCP)'' (TSTF-596).
                                          Specifically, the TS changes
                                          would (1) expand the
                                          applicability of the SFCP to
                                          include other periodic testing
                                          frequencies in the Programs
                                          and Manuals TSs of the
                                          Administrative Controls
                                          section; (2) revise the SFCP
                                          to reference additional
                                          regulatory mechanisms that may
                                          be used to control
                                          surveillance frequencies
                                          (i.e., 10 CFR 50.55a and 10
                                          CFR 50.69); (3) revise
                                          surveillance requirements that
                                          reference the inservice
                                          testing program to instead
                                          reference the SFCP or to
                                          describe the required test,
                                          and (4) correct certain
                                          editorial errors in the TSs.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
  Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant,
                Units 1 and 2; San Luis Obispo County, CA
------------------------------------------------------------------------
Docket Nos.............................  50-275, 50-323.
Amendment Date.........................  September 3, 2026.
ADAMS Accession No.....................  ML26167A050.
Amendment Nos..........................  261 (Unit 1) and 263 (Unit 2).
Brief Description of Amendments........  The amendments revised
                                          Technical Specification (TS)
                                          2.1.1, ``Reactor Core SLs
                                          [Safety Limits]''; TS 4.2.1,
                                          ``Fuel Assemblies''; and TS
                                          5.6.5, ``Core Operating Limits
                                          Report (COLR),'' to allow the
                                          use of ADOPT\TM\ fuel pellets
                                          and adoption of improved
                                          analysis methods.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
  Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant,
                Units 1 and 2; San Luis Obispo County, CA
------------------------------------------------------------------------
Docket Nos.............................  50-275, 50-323.
Amendment Date.........................  September 9, 2026.
ADAMS Accession No.....................  ML26238A236.
Amendment Nos..........................  262 (Unit 1) and 264 (Unit 2).
Brief Description of Amendments........  The amendments provided for a
                                          more flexible implementation
                                          schedule for Amendment Nos.
                                          252 and 254 to allow use of
                                          Optimized ZIRLO\TM\ as an
                                          approved fuel rod cladding
                                          material.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and
  3; Limestone County, AL; Tennessee Valley Authority; Sequoyah Nuclear
 Plant, Units 1 and 2; Hamilton County, TN; Tennessee Valley Authority;
         Watts Bar Nuclear Plant, Units 1 and 2; Rhea County, TN
------------------------------------------------------------------------
Docket Nos.............................  50-259, 50-260, 50-296, 50-327,
                                          50-328, 50-390, 50-391.
Amendment Date.........................  September 10, 2026.
ADAMS Accession No.....................  ML26222A260.
Amendment Nos..........................  344 (BFN, Unit 1), 367 (BFN,
                                          Unit 2), 327 (BFN, Unit 3),
                                          379 (SQN, Unit 1), 374 (SQN,
                                          Unit 2), 185 (WBN, Unit 1), 90
                                          (WBN, Unit 2).
Brief Description of Amendments........  The amendments revised the
                                          Browns Ferry Nuclear Plant,
                                          Units 1, 2, and 3; Sequoyah
                                          Nuclear Plant, Units 1 and 2;
                                          and Watts Bar Nuclear Plant,
                                          Units 1 and 2, Risk Informed
                                          Completion Time technical
                                          specifications to reference
                                          Regulatory Guide (RG) 1.200,
                                          Revision 3, ``Acceptability of
                                          Probabilistic Risk Assessment
                                          Results for Risk-Informed
                                          Activities,'' instead of RG
                                          1.200, Revision 2, and made
                                          other changes. The changes are
                                          in accordance with Technical
                                          Specifications Task Force
                                          (TSTF) Traveler TSTF-591,
                                          Revision 0, ``Revise Risk
                                          Informed Completion Time
                                          Program.''.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
   Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2;
                           Hamilton County, TN
------------------------------------------------------------------------
Docket Nos.............................  50-327, 50-328.
Amendment Date.........................  September 1, 2026.
ADAMS Accession No.....................  ML26212A279.

[[Page 61474]]

 
Amendment Nos..........................  Unit 1 (378) and Unit 2 (373).
Brief Description of Amendments........  The amendments revised Sequoyah
                                          Nuclear Plant, Units 1 and 2,
                                          Technical Specification 5.5.3,
                                          ``Radioactive Effluent
                                          Controls Program,'' to specify
                                          that the dose coefficients for
                                          radionuclides associated with
                                          potassium hydroxide may be
                                          determined using International
                                          Commission on Radiological
                                          Protection publications 72,
                                          119, and 144, and
                                          Environmental Protection
                                          Agency Federal Guidance
                                          reports 12 and 15.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------
 Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Unit
                   Nos. 1 and 2; Somervell County, TX
------------------------------------------------------------------------
Docket Nos.............................  50-445, 50-446.
Amendment Date.........................  August 27, 2026.
ADAMS Accession No.....................  ML26230A230.
Amendment Nos..........................  199 (Unit 1) and 199 (Unit 2).
Brief Description of Amendments........  The amendments modified
                                          Technical Specification (TS)
                                          4.2.1, ``Fuel Assemblies,''
                                          and TS 5.6.5, ``Core Operating
                                          Limits Report (COLR),'' to
                                          allow the use of Optimized
                                          ZIRLO as an approved fuel rod
                                          cladding material.
Public Comments Received as to Proposed  No.
 NSHC (Yes/No).
------------------------------------------------------------------------

IV. Notice of Issuance of Amendments to Facility Operating Licenses and 
Combined Licenses and Final Determination of No Significant Hazards 
Consideration and Opportunity for a Hearing (Exigent Circumstances)

    Since publication of the last biweekly notice, the Commission has 
issued the following amendment. The Commission has determined for this 
amendment that the application for the amendment complies with the 
standards and requirements of the Atomic Energy Act of 1954, as amended 
(the Act), and the Commission's rules and regulations. The Commission 
has made appropriate findings as required by the Act and the 
Commission's rules and regulations in 10 CFR chapter I, which are set 
forth in the license amendment.
    Because of exigent circumstances or emergency situation associated 
with the date the amendment was needed, there was not time for the 
Commission to publish, for public comment before issuance, its usual 
notice of consideration of issuance of amendment, proposed NSHC 
determination, and opportunity for a hearing.
    For exigent circumstances, the Commission has either issued a 
Federal Register notice providing opportunity for public comment or has 
used local media to provide notice to the public in the area 
surrounding a licensee's facility of the licensee's application and of 
the Commission's proposed determination of NSHC. The Commission has 
provided a reasonable opportunity for the public to comment, using its 
best efforts to make available to the public means of communication for 
the public to respond quickly, and in the case of telephone comments, 
the comments have been recorded or transcribed as appropriate and the 
licensee has been informed of the public comments.
    In circumstances where failure to act in a timely way would have 
resulted, for example, in derating or shutdown of a nuclear power plant 
or in prevention of either resumption of operation or of increase in 
power output up to the plant's licensed power level (an emergency 
situation), the Commission may not have had an opportunity to provide 
for public comment on its NSHC determination. In such case, the license 
amendment has been issued without opportunity for comment prior to 
issuance. Nonetheless, the State has been consulted by telephone 
whenever possible.
    Under its regulations, the Commission may issue and make an 
amendment immediately effective, notwithstanding the pendency before it 
of a request for a hearing from any person, in advance of the holding 
and completion of any required hearing, where it has determined that 
NSHC is involved. The Commission has applied the standards of 10 CFR 
50.92 and has made a final determination that the amendments involve 
NSHC. The basis for this determination is contained in the NRC staff 
safety evaluation related to each action. Accordingly, the amendment 
has been issued and made effective as indicated.
    For those amendments that have not been previously noticed in the 
Federal Register, within 60 days after the date of publication of this 
notice, any persons (petitioner) whose interest may be affected by this 
action may file a request for a hearing and petition for leave to 
intervene (petition) with respect to the action. Petitions shall be 
filed in accordance with the guidance concerning the Commission's 
``Agency Rules of Practice and Procedure'' in 10 CFR part 2 as 
discussed in section II.A of this document.
    Unless otherwise indicated, the Commission has determined that the 
amendment satisfies the criteria for categorical exclusion in 
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), 
no environmental impact statement or environmental assessment need be 
prepared for this amendment. If the Commission has prepared an 
environmental assessment under the special circumstances provision in 
10 CFR 51.12(b) and has made a determination based on that assessment, 
it is so indicated in the safety evaluation for the amendment.
    For further details with respect to these actions, see the 
amendment and associated documents such as the Commission's letter and 
safety evaluation, which may be obtained using the ADAMS accession 
numbers indicated in the following table. The safety evaluation will 
provide the ADAMS accession number for the application for amendment 
and the Federal Register citation for any environmental assessment. All 
of these items can be accessed as described in the ``Obtaining 
Information and Submitting Comments'' section of this document.

[[Page 61475]]



     License Amendment Issuance(s)--Exigent/Emergency Circumstances
------------------------------------------------------------------------
 
------------------------------------------------------------------------
  STP Nuclear Operating Company; South Texas Project, Unit 1; Matagorda
                               County, TX
------------------------------------------------------------------------
Docket No..............................  50-498.
Amendment Date.........................  August 6, 2026.
ADAMS Accession No.....................  ML26246A987.
Amendment No...........................  228.
Brief Description of Amendment.........  The amendment revised the South
                                          Texas Project, Unit 1,
                                          Technical Specifications (TSs)
                                          to allow for a one-time
                                          exigent change for extension
                                          to the allowed outage time for
                                          TS 3.7.1.7, ``Main Feedwater
                                          System.'' This allowed outage
                                          time extension was requested
                                          to facilitate repairs to the
                                          Unit 1 Train D Main Feedwater
                                          Isolation Valve.
Local Media Notice (Yes/No)............  No.
Public Comments Requested as to          Yes.
 Proposed NSHC (Yes/No).
------------------------------------------------------------------------

    Authority: 42 U.S.C. 2011 et seq.

    Dated: September 24, 2026.

    For the Nuclear Regulatory Commission.
Ilka Berrios,
Chief, Division of Licensing Projects I, Office of Nuclear Reactor 
Regulation.
[FR Doc. 2026-19812 Filed 9-28-26; 8:45 am]
BILLING CODE 7590-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on September 29, 2026.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.